Why the real hourly cost is always higher than the wage
In the main construction sector and finishing work, confusing the gross hourly wage paid on the payslip with the actual cost of an hour on the construction site leads directly to operating losses. An SME owner or a site manager cannot build their price quotes or daywork rate schedules on the basic remuneration of their workers alone. Every hour spent on the concrete slab or the scaffolding bears the financial weight of numerous contractual and legal obligations that accumulate throughout the year.
The discrepancy stems first from paid hours that are not worked. A bricklayer, formworker, or painter receives their wage during holidays, paid public holidays, or during employer-covered absences. Moreover, the 13th-month salary represents a financial charge spread across the entire year. These elements automatically increase the average cost of each truly productive hour spent on construction sites.
To this must be added employer social contributions and mandatory joint funds specific to collective labour agreements (convention collective de travail). The employer covers the employer shares of occupational pensions, accident and sickness daily allowance insurance, early retirement, and contributions to professional funds. No worker costs merely their gross hourly rate. To safeguard company profitability during a tender or an addendum negotiation, it is essential to break down each expenditure item to identify the real expense tied to each hour of effective production.
The calculation lines: from paid hour to productive hour
To establish a rigorous cost price, the simulator begins with the total volume of paid contractual hours to arrive at the actual productive hours. The starting point is based on the usual construction wage classes: CE, Q, A, B, and C. For each of these classes, the user enters the applicable basic gross hourly wage for their company. The model then incorporates the 13th-month salary and holiday entitlements, the duration of which varies according to the worker's age bracket, as well as paid public holidays according to the customs of the canton where the work is carried out.
The second stage applies employer social security contributions. The calculation details each contribution line:
- Basic social security: AVS (OASI), AI (DI), APG (ICO), and unemployment insurance.
- Family allowances via the relevant compensation fund.
- Occupational pension scheme (LPP), with rates varying according to the employee's age group.
- Occupational and non-occupational accident insurance, as well as sickness daily allowance insurance.
- Contributions for early retirement in the construction sector.
- Contributions to joint funds, such as the Parifonds for the main construction sector.
The third stage deducts unproductive hours to determine the real volume of hours spent building. Bad weather, continuing education courses, medical check-ups, or unbilled travel times reduce the annual number of productive hours. By dividing the total burdened wage bill by this volume of productive hours, the tool reveals the pure hourly cost price of the operative.
Entering your parameters: what is verified and what needs checking
Every enterprise has a distinct cost structure, linked to the average age of its staff, past accident history, and the insurance funds to which it is affiliated. The simulator does not lock in any arbitrary data. Each parameter displayed in the interface remains fully editable by the user. Each line indicates its selected value, vintage, data source, and status under the notice "verified at source on..." or the warning "to be verified".
Only a few general parameters have been gathered directly from public sources. All other values must be entered or checked by you using your own compensation fund statements, insurance policies, and collective agreement scales. LPP contribution rates, sickness loss of earnings insurance premiums, and accident rates differ from one SME to another according to underwritten policies and corporate negotiations.
The simulator applies a strict rule to prevent flawed calculations: as long as a mandatory field remains empty or contains an unreadable value, the system flags it visually and blocks the display of the overall result. No cell is automatically populated with a background zero. This prevents arriving at an understated hourly cost through the accidental omission of an employer contribution or a holiday entitlement. You can also test a pre-filled dummy example to understand the worksheet's mechanics, or compare two scenarios side by side to measure the impact of an insurance increase or a change in age bracket.
From cost price to daywork rate
The pure hourly cost price represents the threshold below which a worked hour generates a direct deficit for the company. However, this amount is not sufficient for billing a daywork sheet on the construction site or answering line items in a call for tenders according to the CFC. To establish the recommended daywork rate, the simulator adds two indispensable elements to the cost price: overheads coverage and the profit margin.
Overheads encompass all expenses vital to the smooth running of the business that cannot be allocated to a single project. They include the depreciation of storage yards and workshops, utility vehicles, technical software, salaries of management, secretarial staff, and quantity surveyors, office expenses, or IT equipment. These costs are passed on as a coefficient or percentage to be added to direct labour costs.
The rate then incorporates the provision of personal protective equipment and standard small tools, as well as contractual meal or travel allowances according to the project specifications. The net margin completes the calculation. It remunerates corporate risk, provides the capital required for future investments, and protects cash flow against site contingencies. The tool details each stage of the progression from gross cost to final rate with the arithmetic formula used on each line, making it possible to justify the breakdown of the daywork rate to a client or a checking architect.
The costly mistake made on site
On site, one often sees site managers or foremen applying a daywork rate taken from an old tender without recalculating the actual volume of productive hours. The most frequent mistake is dividing annual wage expenses by the theoretical number of paid contractual hours, overlooking the impact of bad weather, travel, and unforeseen work stoppages. When the construction site experiences adverse weather conditions or logistical waiting times, the volume of effectively sold hours drops, whereas wages and social security contributions continue to be paid at the end of the month.
Another common pitfall involves underestimating travel and meal allowances set by the national collective agreement of the main sector or cantonal CLAs. If these allowances are paid to the worker without being passed on in the daywork rate schedule or in the overheads coefficient, the company finances these sums out of its own operating margin.
The practical step to avoid this setback is to review the actual productive hours recorded over the previous financial year before renewing an hourly rate. You should check the rates applied by your compensation fund and health insurer, then enter these exact figures into the simulator. In this way, you align your daywork prices with the reality of your social contributions rather than an approximate estimate.
What the free version does not do
This free online tool operates without registration or account creation. All processing takes place within your web browser: no files, plans, or confidential figures are sent to an external server. Consequently, the simulator has no memory storage. As soon as you close the page or refresh your tab, all entered data is reset. It is vital to export your spreadsheet in CSV format or print it before leaving the browsing window.
The free version presents technical and functional limitations that should be noted:
- Paper or PDF printouts from the browser feature an Art Construction watermark, and data exports carry the simulator label.
- No rates or pricing data from the ACIP database are included in the free version: you work solely with your own payroll data and rates.
- It is not possible to save worker profiles into a construction site folder or retain calculation histories for future reuse.
- This simulator serves purely as an indicative calculation aid. It does not provide any wage, legal, or tax advice. In the event of a dispute, only the provisions of the national collective agreement for the main construction sector, your industry CLA, and statements from your funds prevail.
- The arithmetic model is the one defined in the tool: it is your responsibility to have it reviewed and validated by a fiduciary or qualified professional before applying it to your contracts.
To prepare your quantity take-offs and tender files without manual re-entry, you can consult our resources on construction tenders.
Upgrading to the ERP
For general contractors, technical offices, and SMEs managing multiple teams across concurrent operations, using a standalone browser-based tool quickly reaches its practical limits. On large construction sites, accurate labour tracking requires a direct link between actual time logs, administrative management, and client billing.
Our paid solution, the ERP (HR and daywork module), takes over from the simulator to centralise your entire business operations. This software allows you to:
- Save calculation sheets by worker and wage category directly within the construction site file, complete with version tracking through salary increases or grade changes.
- Instantly reload a saved project to adjust hourly rates for a new phase of work or an addendum.
- Price your quotes by pulling directly from the ACIP price database for materials, equipment, and associated services.
- Work in Team mode so that accounts, quantity surveyors, and management share the same up-to-date payroll data.
- Generate watermark-free Pro exports customised with your company branding and colours, ready to be attached to your official award dossiers.
To learn how to structure your daywork rates and tender pricing, explore our module on the company management Portail, or compile a complete quote using our tool for professional Plans Pro and quotes.
Frequently asked questions
How does the simulator calculate annual productive hours?
The calculation starts from the agreed annual contractual duration. The tool deducts weekly rest days, holiday entitlements according to the worker's age, cantonal paid public holidays, and company shutdown days. It also subtracts an allowance for bad-weather hours, training courses, and non-billable travel, thereby determining the volume of genuinely billable hours on construction sites.
Which collective agreement wage classes are included in the tool?
The simulator covers standard sector wage classes: CE for foremen, Q for qualified personnel holding a CFC (Federal VET Diploma), A for experienced site workers, B for operatives with practical experience, and C for labourers and assistants. Hourly wages for each category are entered freely by the user.
Why is my data not saved when I close my browser?
The free version runs entirely in your browser to maintain data confidentiality. No files, plans, or figures are transmitted to an external server. For security reasons, no memory is retained in the tool: refreshing or leaving the tab resets all fields. You should export your file in CSV format before closing the page.
Which social contribution rates are applied by default in the simulator?
The simulator does not set fixed permanent percentages. Only a few reference rates have been verified against official sources, while the remaining fields must be checked or entered by you. Occupational pension (LPP) rates, accident cover, and sickness daily allowance insurance depend directly on the contracts your SME has established with its funds.
What is the difference between the hourly cost price and the daywork rate?
The hourly cost price includes only the gross wage paid, the 13th-month salary, holidays, paid public holidays, and all employer contributions divided by productive hours. The daywork rate adds company operating overheads, small tools, site allowances, and the business profit margin to this cost.
Does the result provided by the tool carry legal weight in an audit?
No, this simulator offers an indicative estimate to assist business managers in formulating their pricing. It constitutes neither legal, payroll, nor tax advice. In the event of an audit by a joint commission or administrative authority, only the texts of the national collective agreement for the main sector, your local CLA, and statements from your funds are legally binding.
What should I do if a mandatory field remains empty in the calculation form?
If a required field is left blank or has an invalid format, the simulator highlights it and blocks the overall result from displaying. The tool never quietly substitutes missing parameters with zero, ensuring you do not use a distorted rate calculated on incomplete figures.