Free software · 100% in your browser · no data sent

Swiss construction payslip: comprehensive editor with logo, calculations, and PDF

Enter your company header, employee and monthly items: the statement is calculated line by line and exported as an A4 PDF for your fiduciary. Everything stays in your browser.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

Why use a payslip editor for Swiss construction

In the Swiss building and civil engineering sector, drawing up monthly salary statements requires utmost rigour. Between construction site hours, the handling of supplements, meal or travel allowances, and multiple social security contributions specific to structural work or finishing work, input errors can quickly happen. A SME director or administrative manager needs a direct tool to prepare a clear payslip prior to handing it over to their fiduciary.

This online editor allows you to draw up a full salary statement, item by item, directly within your web browser. It is a free tool, requiring no registration and no account creation. It runs entirely on your local workstation: no file is sent to a remote server, no data is recorded, and the browser memory stores nothing. When you close or refresh the page, all entered data is erased. A warning prompt appears before closing if no document has been printed or downloaded.

The application processes one payslip at a time. The resulting output serves as a technical accounting guide, whose figures remain indicative. Applicable rules always depend on compensation funds, relevant collective agreements, and the competent tax authority. The aim is to structure the monthly items, organise employee deductions, and produce a readable document for both the worker and the accounting office.

Entering company details and logo

Formatting a salary statement requires precise information regarding both the employer and the employee. The first input section concerns your business. You enter your company name, registered office address, IDE business identification number, as well as your contact details. You can also include your firm's visual emblem. The logo is simply an image file read locally by your browser in RAM, and then converted into JPEG format. It is never uploaded nor stored on an external server.

Next come the details relating to the employee. The form provides free-text fields for their full name, complete address, AVS (Swiss old-age and survivors' insurance) number, and their start date with the company. You also indicate their trade or role performed on the construction site. For occupational classification, the form offers the common labels CE, Q, A, B, or C, which correspond to the grades found in industry collective agreements. You also select the canton of taxation or activity, the statement month and year, as well as the actual employment rate.

The bank transfer section requires entering the worker's IBAN. The editor features a mathematical check on the IBAN checksum: if a typo has occurred among the characters, a visual alert flags it immediately to prevent rejections when submitting payment orders.

Monthly items: hours, 13th-month pay, holidays, allowances

The structure of gross earnings adjusts to the worker's contractual terms: monthly salary or hourly wage. For hourly-paid work, you enter the volume of standard hours worked during the month as well as the agreed hourly rate. For overtime, a dedicated field allows you to apply a premium. A proposal of twenty-five per cent is shown with the remark “to be verified”, as the applicable rate depends on the trade agreement or the individual contract. With a monthly salary, overtime is not calculated automatically because the base hourly rate is unknown; it must therefore be added by the user via an open earnings line.

Allowances for the thirteenth-month pay and holidays can be calculated as a percentage of the base wage. These entries appear with indicative percentages marked “to be verified”, without any mandatory default values. You maintain full freedom to adjust these rates according to the worker's exact situation.

Construction site expenses are handled in a specific table. You can record meal allowances, site allowances, and travel allowances by multiplying a quantity of units by a unit rate. Each row features a checkbox determining whether the amount forms part of the gross pay qualifying for AVS. Additional open lines allow you to insert other earnings items, subject or not to social security contributions, as well as special deductions such as advance payments already issued, loan repayments, or salary advances.

Employee deductions: AVS, AC, LPP, FAR, joint fund, withholding tax

The social deductions table details each contribution levied on the worker's gross wage. AVS/AI/APG applies to qualifying gross earnings. Unemployment insurance (AC) is calculated taking into account its statutory ceiling. For occupational pension schemes (LPP), you can choose to enter a fixed amount taken from your pension fund's benefits plan or apply a specific percentage rate. Contributions for non-occupational accident insurance (LAA-NP) and daily sickness allowance insurance (IJM) apply to the gross amount qualifying for AVS, a calculation assumption that should be reviewed according to the general terms of your insurance policies.

In the construction industry, specific deductions are added to the statement. Early retirement (FAR in structural work or RESOR depending on trades and regions) as well as contributions to joint funds are listed on separate lines. In this editor, FAR and the joint fund are capped by the maximum insured LAA earnings, which serves as a calculation assumption to be checked against your collective agreement. Finally, for workers subject to direct tax deduction, a row is dedicated to withholding tax. The tool does not store cantonal tax tables: you must manually enter the applicable rate according to the official tariff of the canton concerned.

For all of these deductions, you can select final rounding to the nearest cent or five cents. A strict rule governs the editor: any blank or illegible field is flagged with the label “To be entered” and is never assumed to be zero by default. No net pay amount is calculated or displayed as long as the statement contains incomplete entries. An explicit button labelled “Treat empty fields as 0” enables the user to assign a zero value solely to items that do not concern the employee.

Suggested values and manual entries

To simplify payslip preparation without introducing unfounded assumptions, the editor clearly highlights the origin of each numeric figure. Only six values sourced from official publications are suggested on screen: the employee AVS/AI/APG rate, the unemployment insurance rate, the unemployment insurance ceiling amount, the maximum insured LAA earnings, the employee contribution for FAR early retirement, and the joint fund levy. Each parameter displays its unit, its reference year, its documentary source, as well as its status: sourced from official tables with retrieval date, modified by the user, entered, or to be entered.

All other contributions and allowances must be entered manually based on your insurance policies and fund decisions. The following table summarises the initial status of the main items on the payslip:

Payslip itemInitial status in editorVerification required
AVS / AI / APG ratesRead from sourceVerify employee status
Unemployment insurance and ceilingRead from sourceVerify overall base
Maximum insured LAA ceilingRead from sourceVerify policy conditions
FAR contribution (structural work)Read from sourceConfirm collective agreement liability
Joint fundRead from sourceTo confirm based on canton and agreement
Accident insurance (LAA-NP)To be entered (empty field)Rate according to insurer contract
Daily sickness allowanceTo be entered (empty field)Rate according to group insurance policy
Occupational pension LPPTo be entered (empty field)Amount or rate according to LPP certificate
Withholding taxTo be entered (empty field)Rate according to official cantonal tariff
13th-month pay and holidaysIndicative rates to be verifiedAccording to employment contract or agreement

This distinct separation avoids common confusion between general federal rules and trade-specific agreements in the construction sector.

Year-to-date totals, PDF, and printing

The payslip includes an optional section for year-to-date totals. It provides a summary of cumulative gross wages, gross pay subject to AVS, deducted withholding tax, and net pay disbursed since the first of January. Since the tool does not record any data on a server or in your browser between sessions, this year-to-date summary relies solely on the figures you transfer yourself from previous monthly statements. For a first payslip drawn up in January, a “first payslip of the year” option initialises these tallies with the current month's figures.

Once all details have been completed and checked, you can generate the final file. Exporting produces a carefully laid-out PDF document. The document features an upper header showing your logo, separate panels for employer and worker, a detailed table (line description, calculation base, applied rate, and resulting amount), AVS qualifying gross pay, total deductions, net pay to be disbursed, and bank transfer details with IBAN. If the number of allowances or deductions exceeds available space, the table carries over to a second page. An appendix sets out the calculation parameters applied, accompanied by a note of caution advising verification by your fiduciary.

In this free version, a watermark bearing the text “Art Construction — version gratuite” is added to the PDF as well as the printable layout. A CSV export is also available, containing the entire salary statement for your local archives. Please note: the PDF engine uses standard Western typefaces. Special characters not included in the standard character set (such as specific letters from Turkish, Albanian, or Croatian alphabets) are automatically converted to the nearest Latin letter and flagged before downloading.

What the editor does not do: Swissdec, withholding tax tariffs

To use this tool effectively, it is essential to understand its exact scope. This editor is designed to assist with single calculations and the production of a monthly accounting voucher. It is by no means a substitute for complete payroll management software. In particular, the tool does not support electronic payroll reporting according to the Swissdec ELM XML standard. Generated PDF or CSV files cannot be submitted electronically to compensation funds, LAA insurers, or cantonal tax authorities.

Likewise, the editor does not produce annual salary certificates for tax returns, nor does it provide end-of-year contribution summaries. No withholding tax tariffs are built into the tool: deduction rates must be extracted manually by you from the tables published by cantonal tax administrations. Finally, the suggested contributions do not apply uniformly across all trades in finishing work, where other early retirement schemes or training funds may be applicable.

The calculation provided by the tool remains indicative and does not constitute legal, tax, or payroll advice. In case of doubt regarding the application of a collective agreement provision or an insurance basis, the document should be submitted to your usual fiduciary for verification. To discover our tools for site monitoring and document workflows, explore our sections dedicated to construction tenders or learn more about our quotes and management module.

Monthly processing within the ERP

For general contractors, trade contractors, and tradespeople managing several workers daily, preparing individual statements without system memory has its limitations. When payslips must be reissued at the end of each month for the entire team, entering basic details repeatedly becomes tedious.

Routine personnel tracking can be managed using a centralised system. Art Construction provides an ERP featuring an HR / Employee module. This module enables you to manage employee records, keep copies of employment contracts, and track complete company payroll records month after month. The free payslip editor contains a link to try this ERP. None of the data entered within the browser page is transferred to this software: your work remains strictly on your local screen.

This editor also features a practical bridge to our Jobs recruitment service. By selecting the option “Recruit an employee at this wage”, you open a draft job listing prepopulated solely with the work canton, trade qualification grade, wage amount, and payment frequency (hourly or monthly). As a privacy safeguard, no personal data is transmitted: neither the worker's name, their AVS insurance number, nor their bank details appear in this draft. To find out more about our complete solutions for construction SMEs, visit our construction tools portal.

Frequently asked questions

Is my payroll data stored on a server?

No. The tool runs entirely within your web browser. No figures, names, or files are sent to a server or saved in your browser storage. If you refresh or close the page, all values disappear permanently, unless you have generated your PDF or exported the CSV file.

Why is net pay not displayed immediately?

The editor never treats an empty field as an amount of zero francs. Any unfilled or unreadable field is labelled “To be entered”. Final net pay calculation remains suspended until all required entries are filled, preventing the delivery of an incomplete statement to an employee.

How should early retirement deductions such as FAR be handled?

The FAR rate is proposed according to figures read from official sources for structural work, based on the assumption of a cap at the maximum insured LAA earnings. If your company operates in finishing work or belongs to another scheme (such as RESOR), you should adjust or adapt this amount according to applicable collective agreement rules.

Can this salary statement be used for Swissdec reporting?

No. This editor does not support XML ELM electronic reporting according to Swissdec standards. Generated PDF and CSV documents serve as internal accounting records and payslips for staff, but cannot be submitted directly into electronic portals of compensation funds or tax departments.

Where can I find the withholding tax rate to enter on the payslip?

The tool does not include cantonal tax tables. You must consult the official tariffs issued by the tax administration of the relevant canton, identify the code matching your employee's family circumstances, and enter that exact percentage into the corresponding field on the form.

How can I add a company logo to the payslip?

In the employer panel, click on the image upload area. Your browser reads the file locally into memory and converts it to JPEG format to place it in the upper header of the statement. The image is neither stored online nor accessible to third parties.

How does the free version differ from the ERP?

The free version of this editor handles one payslip at a time, without storing data across sessions, and applies a watermark on PDF exports and print sheets. By contrast, the Art Construction ERP features a full HR module to register workers, store employment contracts, and maintain monthly payroll records.