Renovated interior in a 3D view, with finished walls and ceilings: background image for the Soumissions public procurement page

Soumissions · Public procurement

Public construction procurement in Switzerland: preparing Simap tenders and finding your way around the AIMP

Organise the monitoring, sorting and standard file for your public tenders, then price the SIA 451 specification in the browser.

Answering a cantonal or municipal public tender is prepared well before the submission date: you have to spot the call for tenders, decide whether to respond, gather the company file and meet the deadlines. This page describes a simple internal organisation, then what Soumissions does to prepare Simap public procurement tenders: a tab tracking public calls for tenders, updated every day, and pricing of SIA 451 specifications. It gives no AIMP threshold figures: they vary by canton and change over time, and dedicated tools present them.

Art Construction SoumissionsTenders and pricing
14-day trial
  • Simap Public tenders tab, updated every day
  • Clear notice: This is not an official publication
  • Import of SIA 451 specifications: .crbx, .01s and .xml
  • Pricing with the ACIP price base, Excel and PDF export
Try the estimator See the demonstration

Pricing: CHF 79 per month, excl. VAT, per company. 14-day trial, no card required.

A public contract is prepared before publication: monitoring, sorting, standard file

Public construction contracts follow public procurement law, with the Intercantonal Agreement on Public Procurement (AIMP) for cantons and municipalities: a contracting authority publishes, companies respond, and the tender is judged on announced criteria. For an SME, the difficulty is absorbing this machinery into an already busy week. Four time-wasters come up repeatedly:

The four procedures to know

The applicable procedure depends on the nature and value of the contract, and on the canton or municipality. The threshold figures vary and change over time: they do not appear here. The AIMP thresholds tool and the guide AIMP thresholds and procedures present them.

What Soumissions does for public procurement

Public tenders tab

Public Simap calls for tenders are tracked in a dedicated tab, with a daily update. You then decide which ones deserve a file.

Source notice

The tab carries the notice: “This is not an official publication: the data on simap.ch is authoritative”. Check the announcement on simap.ch before building a file.

SIA 451 specification

When the contracting authority supplies the specification in an exchange file, Soumissions reads the .crbx, .01s and .xml formats without altering the text, and flags the items without a price.

Pricing and export

ACIP price suggestions on three levels, discount as a percentage or overall, Excel export with subtotals and PDF in your colours.

The tab is part of the Soumissions marketplace, which remains free. The Professional tools plan adds pricing, SIA 451 import and estimates from a photo (AI).

Three steps to structure your public tenders

The software steps in at two points, monitoring and pricing; the rest is organisation.

Step 1: frame your monitoring

Set down in writing the types of work, regions and procedures you respond to, then check the tab each morning. The guide on the Simap monitoring profile explains how to limit noise.

Step 2: prepare a standard file

Gather the reusable documents once: company presentation, references, organisation, up-to-date certificates and the outline of a technical method statement. For each call for tenders, all that remains is to update and adapt.

Step 3: price, recheck the deadlines, submit

Import the specification, price, export the tender, then recheck the deadlines and the documents requested. Submission is made on the platform stated in the call for tenders: see the guide on electronic submission on Simap.

Manual monitoring or the Soumissions tab: what each approach requires

Consulting simap.ch directly remains the reference: it is the official source. The Soumissions tab does not replace it; it provides daily tracking and a starting point for pricing. The table compares ways of working, not products.

Two ways of tracking and preparing public calls for tenders
Company needConsulting simap.ch directlySoumissions Public tenders tab
Official statusOfficial source of publicationsNone: “This is not an official publication”, simap.ch is authoritative
Tracking rhythmEach visit depends on youDaily update of the tab
Decision to respond or notYour analysis of the documentsYour analysis: the software does not decide
Reading the specificationDocuments downloaded, handled with your own tools.crbx, .01s and .xml files read; text never altered
PricingSpreadsheet or tendering softwareUnit prices, ACIP suggestions on three levels, discount
Submitting the tenderOn the platform stated in the call for tendersSame platform: submission is not a function described here

Comparison of ways of working. Only simap.ch is authoritative for publications; legal decisions rest with the company and its advisers.

14-day trial, price and limits

Tracking of public calls for tenders is part of the Soumissions marketplace, which remains free. Pricing falls under the Professional tools plan: CHF 79 per month or CHF 790 per year, excl. VAT, for the company, after a 14-day trial with no card required.

Frequently asked questions

Are the calls for tenders shown in Soumissions official?

No. The Public tenders tab carries the notice “This is not an official publication: the data on simap.ch is authoritative”. It is updated every day and is used for tracking. Before committing any work, open the announcement on simap.ch and check the deadlines, the criteria and the documents requested.

What are the public procurement procedures in Switzerland?

A distinction is made between the open procedure, the selective procedure, the invitation procedure and direct award. The applicable procedure depends on the value and nature of the contract, and on the canton or municipality. This page cites no threshold: consult the AIMP thresholds tool and the corresponding guide.

Can I price a public contract’s specification with Soumissions?

Yes, when the specification is supplied as a .crbx, .01s or .xml file: Soumissions reads it without altering the text, flags the items without a price, offers ACIP prices on three levels and exports to Excel or PDF. For any other file format, import is not announced here.

Do I need a subscription to track public calls for tenders?

Tracking is not subject to the plan: the tab is part of the Soumissions marketplace, which remains free. The Professional tools plan (CHF 79 per month, excl. VAT, per company) covers pricing, SIA 451 import and estimates from a photo; the 14-day trial is without a card.

Going further

Software pages, tools that need no registration and guides linked to public procurement.

Sources and limits. Functions described according to the Soumissions modules in service on 26 November 2026. Procedures are presented in general terms, without thresholds: the rules vary by canton and municipality and change over time. This is not an official publication: the data on simap.ch is authoritative. Prices in CHF, excl. VAT.