From bill of quantities to tender: where time and margin are decided
An architect’s bill of quantities quickly runs to several hundred items. Re-keying it into a spreadsheet costs time and opens the door to errors; altering it, even slightly, makes the tender hard to compare with those of the other tenderers. Importing an SIA 451 file avoids re-keying. What remains is the second half of the work, deciding at what price to put each item: that is a company decision.
Direct cost, overheads, profit: the method
A unit price is built in layers. The direct cost covers what the item costs directly: labour hours, materials, machinery and subcontracting. The overheads cover what is attached to no site in particular: administration, vehicles, premises, insurance, supervision. The profit and the risk allowance are added next. Each company sets its own rates.
Discounts and company variants
The discount can apply to one item or to the total of the tender. The company variant is a practice of the trade: the company proposes another technical solution or another material in addition to the base tender, if the call for tenders allows it. Daywork follows a different logic: see the guide Pricing the annex bill of daywork rates.
What Soumissions does between import and export
Four functions cover the workflow. Exchange formats: guide SIA 451 format: .01s and .crbx files. Encoding and rounding errors: guide SIA 451 encoding errors.
.01s, .crbx and .xml import
Soumissions reads these three file types (ZIP, XML or text). The architect’s text is never altered, and no price is filled in on import.
Items without a price flagged
Each item that still has no price is flagged: this is your work list, then your final check.
Unit prices and three ACIP levels
The pricing assistant suggests prices from the ACIP price base on three levels: low, medium and high. You then set your unit prices, with the margin decided by the company.
Discount, Excel and PDF
The discount applies as a percentage or overall. The Excel export keeps formulas (subtotals); the PDF uses your colours for the tender.
Three steps, from the file received to the tender submitted
Order matters: prepare your costs before opening the file, price, then check.
Step 1: import without touching the text
Import the .01s, .crbx or .xml file, then compare the number of items with the architect’s document. Items without a price are flagged.
Step 2: set your prices and your discount
Take your direct costs and overheads, calculated in your spreadsheet, your ERP or the Studio Devis Suisse, then set one price per item. The ACIP levels serve as reference points; the discount is applied afterwards.
Step 3: export and check the totals
Export to Excel to check the subtotals using the formulas, then to PDF in your colours for the tender. Reread the roundings before sending.
Spreadsheet, installed software or Soumissions: who does what in pricing
The spreadsheet remains a widespread and flexible pricing tool. Installed tendering packages, including Sorba and Messerli, are benchmarks in the industry. The table compares approaches, not products: exact functions should be checked with each vendor.
| Pricing step | Spreadsheet alone | Installed tendering software | Soumissions |
|---|---|---|---|
| Taking over the bill of quantities | Copying or re-keying the items | Depends on the product and plan | Import of .01s, .crbx, .xml; text never altered |
| Direct cost, overheads, margin | Formulas to create and keep up to date | Depends on the product and plan | No dedicated function; Studio Devis Suisse or ERP |
| Help with the unit price | Your own references | Depends on the product (libraries, catalogues) | ACIP suggestions on three levels |
| Discount | Formula to write | Depends on the product and plan | As a percentage or overall |
| Company variants | Separate sheet or file | Check with the vendor | No dedicated function |
| Outputs | Depends on your layout | Depends on the product | Excel with subtotals, PDF in your colours |
Brands mentioned belong to their owners. Non-exhaustive comparison of categories: check the current functions, conditions and prices with each vendor.
14-day trial, price and limits
You can test the complete workflow for 14 days, with no card required. The Professional tools plan is then charged at CHF 79 per month or CHF 790 per year, excl. VAT, per company; the Soumissions marketplace remains free. To try on a real bill of quantities:
- importing a .01s, .crbx or .xml file, and checking the text;
- flagging of the items without a price;
- unit prices, ACIP suggestions and the discount;
- Excel export with formulas and PDF in your colours.
Frequently asked questions
Does Soumissions alter the architect’s text on import?
No. The architect’s text is never altered and no price is filled in on import. The software reads .crbx, .01s and .xml files, then flags the items without a price. It is up to you to check, at the end, that the number of items and the totals match the document received.
Does Soumissions calculate my direct cost, overheads and margin?
No. In Soumissions you price with unit prices, with a discount and three price levels drawn from the ACIP price base. Direct cost, overheads and margin are notions of method that the company sets itself. The Studio Devis Suisse and the Art Construction ERP offer a calculation with margin.
How do I present a company variant?
The variant is a practice of the trade, not a software function. First read the call-for-tenders documents: they say whether variants are admitted and in what form. Then prepare it in a separate document, with its price and its justification, to attach to the base tender.
Which formats can I produce on export?
Export is to Excel, with formulas and subtotals, and to PDF in your company’s colours; import accepts .crbx, .01s and .xml. To turn an exchange file into an Excel table simply, with no registration, see the Art Construction SIA 451 converter.