Answering a call for tenders without depending on one workstation or server
A specification arrives by email on a Friday, with a submission deadline set for the following Monday. If the software that can open it is installed on a single workstation, or on an office server, the pricing depends on that machine and on the person who masters it. For an SME, the estimator is often the owner or the site manager, who sometimes works from a Mac, a laptop or a tablet.
Tendering software installed on a workstation or server, including Sorba and Messerli, is very widespread in the industry and has its strengths. Its licence, operating system and support requirements should be checked with the vendor. The browser approach answers a different constraint: opening the file wherever you happen to be, on the computer you have, without preparing a dedicated workstation.
- Which computers does the estimator work on: Mac, PC, tablet?
- Who can open the specification if the usual person is absent?
- Is a server, an installation or an update needed before each submission?
- What is left of the architect’s text once the file has been imported?
What Soumissions does in the browser
Soumissions is used in the browser, on Mac, PC or tablet, with no installation. The data is hosted in Switzerland and a single account gives access to all Art Construction software. For the exchange formats, see the guide SIA 451 format: .01s and .crbx files; for the CRB, CFC and CAN reference points, the guide CRB, CFC, CAN and the SIA 451 standard.
SIA 451 reader and editor
The software reads .crbx, .01s and .xml files (ZIP, XML or text). The architect’s text is never altered: you work on the prices, not on the specification.
Items without a price flagged
No price is filled in on import. Items that still have no price are flagged, which helps to check that no line has been forgotten.
ACIP price suggestions
The pricing assistant offers prices from the ACIP price base on three levels: low, medium and high. You decide which level to use for each item.
Excel and PDF export
The Excel export keeps formulas (subtotals) for internal checking; the PDF uses your colours for the tender submitted to the building owner (client).
Three steps to evaluate the alternative on a real file
The surest way to judge a tendering tool is to give it a real specification, already priced with your current method.
Step 1: open Soumissions from your current workstation
Launch the browser on your Mac or PC and create the trial account: nothing to install, no server, no update. The trial lasts 14 days.
Step 2: import a specification that is already priced
Choose a recent file, import the .crbx, .01s or .xml file, then compare the text with the original: it should be identical. Spot the items without a price and price them, with the help of the three ACIP levels.
Step 3: export and compare with your method
Produce the Excel export and the PDF, then compare the time spent, the totals and the presentation with your current software. This comparison shows whether the alternative suits you.
Installed software or browser: what each approach requires
The table compares two approaches, not products: the exact licence, system and support conditions of Sorba, Messerli or any other installed software should be checked with each vendor.
| Criterion | Software installed on a workstation or server | Art Construction Soumissions |
|---|---|---|
| Workstation | Depends on the vendor and version: to be checked | Browser on Mac, PC or tablet |
| Installation and updates | Depends on the product (workstation or server) | No installation |
| Licence and payment | Depends on the vendor: to be checked | CHF 79 per month (CHF 790 per year), per company, excl. VAT |
| Reading the SIA 451 specification | Common in the category | .crbx, .01s and .xml files; architect’s text never altered |
| Pricing support | Depends on the offer (libraries, catalogues) | ACIP price suggestions on three levels; no price filled in on import |
| Outputs | Depends on the product | Excel export with formulas, PDF in your colours |
Brands mentioned belong to their owners. Non-exhaustive comparison of categories: check the current functions, conditions and prices with each vendor.
14-day trial, starting price and limits
At the end of the 14-day trial, nothing is charged: no card is required. After that, the Professional tools plan costs CHF 79 per month (CHF 790 per year), excl. VAT, for the whole company and not per user.
- Pricing assistant with the ACIP price base.
- SIA 451 import and reader (.crbx, .01s, .xml).
- Estimate from a photo (AI).
- The Soumissions marketplace (private clients, companies, public Simap tenders): remains free.
Frequently asked questions
Do I need to install anything to use Soumissions on a Mac?
No. Soumissions is used in the browser, on Mac, PC or tablet, with no installation. You open your account, import the file you received and price from the computer you have. The data is hosted in Switzerland, and a single account gives access to all Art Construction software.
Which specification files can I open?
The SIA 451 reader reads .crbx, .01s and .xml files (ZIP, XML or text). The architect’s text is never altered and no price is filled in on import; items without a price are flagged. The guide SIA 451 format: .01s and .crbx files gives the reference points for understanding these formats.
Can I keep my current software, for example Sorba or Messerli?
Yes, nothing obliges you to choose straight away: try Soumissions on a real specification for 14 days and compare with your method. This page announces no automatic exchange with other software: output is by Excel or PDF. What your current licence allows should be checked with the vendor.
Is a Mac enough, and what happens at the end of the 14 days?
Yes: a Mac, a PC or a tablet with a browser is enough. At the end of the trial nothing is charged, since no card is requested; you then decide whether to move to the plan at CHF 79 per month, excl. VAT, or to stop there.
Going further
Software pages, tools that need no registration and guides linked to SIA 451 tendering.