Free SIA 451 (.crbx / .01s / .xml) to Excel & PDF Converter
Open a tender file .crbx or .01s and export it to Excel or PDF.
Interactive tool
| Item no. | Exact descriptive text from the architect (not editable) | Quantity | Unit | Unit price excl. TVA (HT, CHF) | Total excl. TVA (HT, CHF) |
|---|
Summary
- Gross total excl. TVA (HT)
- 0.00
- Discount
- 0.00
- Cash discount
- 0.00
- Net total excl. TVA (HT)
- 0.00
- TVA
- 0.00
- Total incl. TVA (TTC)
- 0.00
Indicative calculation in francs (CHF): Net total = Gross total − discount − cash discount (each calculated on the previous amount); VAT (TVA) on the net total. The ACIP "Low / Average / High" ranges equal −15 %, 0 and +25 % of the price in the ACIP 2026 list, adjusted to the chosen canton: they are indicative and do not constitute an offer.
📧 Receive the Excel workbook by e-mail (optional)
Optional: the Excel, CSV and PDF exports above stay free, with no email and without sending your file. If you click "Receive", your file is sent to our server to produce the workbook ready for costing; the original file is not kept and the workbook is deleted after 7 days. See our privacy policy.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="1.2"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
What is a SIA 451 file (.crbx, .01s, .s45) sent by a Swiss architect or engineer?
When an architect puts a project out to tender, they send the contractors a specification of all the services to be priced, in the exchange format of the CRB SIA 451 IfA18 data exchange standard. This file contains, chapter by chapter, standardised items with their text, their unit and their quantity: the contractor only has to enter its prices. To open crbx file free online, or to read 01s s45 file architect tender without tendering software, the tool above reads these files directly in your browser.
1. From the historical SIA 451 ASCII format (.01s / records A, B, C, G) to the modern CRB IfA18 XML standard (.crbx)
The historical format is an ASCII text file organised in records, identified by letters (for example A, B, C and G): extensions .01s, .s45 or .sia depending on the software. The CRB's modern standard, IfA18, describes the same content in XML; the .crbx file is a ZIP archive that contains this XML. The .xml files are the same XML supplied on its own.
Architects' software exports these formats with variants. The tool recognises element names in French, German and English, guesses the structure when these names are unusual, and tells you whether the reading is "structured" or "heuristic": in the second case, check the result against the architect's document.
2. Structure of a standardised item: CAN chapter number, article number, descriptive text, unit of measurement (m2, m3, m, pce, fft) and quantity
Each item in a specification follows the catalogue of standard items CAN NPK published by the CRB: a three-digit chapter number, an article number, a descriptive text, a unit of measurement and a quantity. The following example comes from the tool's (fictitious) demo file.
| Item | Example | Role |
|---|---|---|
| CAN chapter | 241 | Service family (here: cast-in-place concrete) |
| Item number | 241.201 | Unique reference, to be copied unchanged into the tender |
| Descriptive text | Reinforced concrete B 35/25 for raft slab, thickness 40 cm | Defines the service to be priced: it cannot be edited |
| Unit of measurement | m3 | m2 (area), m3 (volume), m (length), pce (piece), fft (lump sum), h, kg… |
| Quantity | 152 | Architect's quantity, for comparing tenders |
| Unit price excl. TVA (HT) | to be entered | Your price: the only data you add |
Why convert a SIA 451 tender into Excel (.xlsx) or import it into our Soumission module?
A SIA 451 excel xlsx converter saves you from re-entering hundreds of items: the bill of quantities arrives in a table where you only have to fill in the prices. To cost Swiss tender bill of quantities faster, the Excel export already contains the formulas (line total, discount, cash discount, VAT (TVA) 8.1 %, total incl. VAT (TTC)), and the PDF printout produces a site visit bill of quantities.
1. Mandatory legal rule in Switzerland: the absolute ban on altering the architect's descriptive text on pain of exclusion of the bid
The contracting authority compares bids that must relate to exactly the same services. That is why the ban on altering the descriptive text of a tender is a principle of Swiss tendering: rewording, adding to or deleting the text of an item can lead to the bid being excluded, depending on the conditions of the tender documents. The tool respects this rule: the text is shown locked and reproduced identically in all exports; you only enter the prices.
To state a reservation, a contractor variant or a remark, use the space provided in the tender documents, never the text of the bill of quantities.
2. Assisted costing side by side: how to apply our 35 ACIP 2026 price chapters next to each item from the architect
Each item is linked to an ACIP price chapter according to its CAN chapter (see the CFC, eCCC-Bât, CAN and ACIP translator). When the ACIP list contains a matching item, three indicative reference points are shown, "Low", "Average" and "High" (−15 %, 0 and +25 % of the ACIP 2026 price, adjusted to the chosen canton): one click applies them to the unit price for testing.
This free tool includes only about ten typical structural-work items. The full Soumission assistant matches each item to the complete ACIP list and keeps the architect's text unchanged. To find tenders, see the tender radar; for digital models, the IFC reader.
Comparison table of tender exchange formats in Swiss construction
| Format | Extension | Type | Content | Read by this tool |
|---|---|---|---|---|
| SIA 451 ASCII (legacy) | .01s, .s45, .sia | Text, fixed-structure records | Chapters, items, texts, units, quantities | Yes (heuristic reading) |
| CRB IfA18 XML | .crbx | ZIP archive containing XML | Structured bill of quantities, with possible attachments | Yes |
| XML SIA 451 | .xml | XML only | Structured bill of quantities | Yes |
| Spreadsheet | .xlsx, .csv | Table | Schedule to be priced, export from this tool | Export only |
| Printable document | Readable bill of quantities, not machine-processable | Print from this tool only | ||
| BIM model (IFC) | .ifc | STEP text, open format | 3D objects and quantities (SIA 2051) | No: see the IFC reader (tool 1.3) |
The SIA 451 / CRB IfA18 format belongs to the CRB. This reader is tolerant, because architects' software produces variants; it was checked on test files, not on the official specification, which is not public.
Frequently Asked Questions on SIA 451 and .crbx Files (FAQ)
1. How do I open a .crbx file for free, online?
Drag the file into the tool's area above, or click to choose it. A .crbx file is a ZIP archive that contains the architect's specification in XML format: the tool opens it directly in your browser, with no installation or registration.
The file is not sent to a server: reading and conversion take place on your computer. You can also read an .xml, .01s, .s45 or .sia file, or try the "Load a demo SIA 451 file" button if you don't have one to hand.
2. Can I edit the architect's descriptive text?
No, and the tool does not allow it: the descriptive text of each item is shown locked and reproduced identically in the Excel, CSV and PDF export. You only add your unit prices. Altering the text of a tender can lead to the bid being excluded, because the contracting authority must be able to compare bids relating to exactly the same services.
For a variant or a remark, use the space provided in the documents (observations, contractor variants) rather than rewriting the bill of quantities.
3. What is the difference between a .crbx, .01s and .xml file?
The .01s (and its variants .s45 and .sia) is the historical text format for exchanging SIA 451 specifications, made of fixed-structure records. The .crbx is the CRB's modern container: a ZIP archive that holds an XML file. The .xml is the same XML supplied on its own.
Architects' software exports these formats with variants: the tool recognises element names in French, German and English and tells you, for each file, whether the reading is "structured" or "heuristic" (to be checked against the architect's document).
4. What should I do if my SIA 451 file is not read correctly?
First check the number of items and a few quantities against the architect's document: the tool flags the lines to check (missing quantity or unit, unrecognised unit). If the file is not read or if the structure looks wrong to you, use the full costing assistant in the Soumission software, which reads the same formats and keeps the architect's text unchanged.
Exchange formats vary from one software to another: if a file does not go through, send it to our support so that we can add its variant.
Indicative information. The price ranges shown by the tool are ACIP 2026 reference points: they constitute neither an offer nor a contractual price.
