Skip to content
Sign in Sign up
Categories
Power tools DrillsScrewdriversGrindersSaws Measure Laser levels Protection Protective equipment Site Ladders and stepladdersHand tools
Support
Change language: French
Practical guide

EN 361 Harnesses, Retractable Fall Arresters and Temporary Lifelines: Mandatory Fall Protection under OTConst

Swiss fall protection guide: OTConst and SUVA compliance for EN 361 harnesses, retractable fall arresters and temporary lifelines on roofs.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: A fall from height or an operation shutdown generates downtime costs in the range of 15 000 CHF to 50 000 CHF per week on a medium-sized project, severely hitting the profitability of a contractor bound to perform under art. 364 CO.
  2. Legal / Joint committee / SUVA: Non-compliance with safety measures exposes management to enforcement notices. In the event of a gross breach knowingly endangering human life during work at height, criminal liability falls under art. 229 CP, which carries a custodial sentence or a monetary penalty.
  3. Administrative / Acceptance: Missing safety plans or technical anchor verifications can lead to an adjournment of works inspection under SIA 118, delaying payment due under art. 372 CO.

This technical and regulatory guide is intended for site managers, foremen and roofers performing work at height in Switzerland. When collective fall protection cannot be installed or is too hazardous, art. 29 OTConst requires equivalent protective measures to be laid down in writing with the assistance of an occupational safety specialist. Employers must provide suitable equipment under art. 82 LAA, while art. 41 OTConst mandates appropriate measures to prevent falls along roof edges whenever the fall height exceeds 2 m. Selecting a fall arrest harness compliant with EN 361, combined with retractable fall arresters, represents the final safeguard for protecting crews on roofs and scaffolding.

Integrating personal fall protection equipment demands rigorous execution right from the preparation stage. In accordance with art. 4 OTConst, the employer must ensure that, before work begins, a written plan is drawn up detailing the measures required on the construction site, including first-aid arrangements. Furthermore, under art. 5 OTConst, a competent person responsible for occupational safety and health protection must be appointed on every construction site to issue instructions to workers. In addition, art. 6 OTConst requires a safety helmet with a chinstrap to be worn when working with fall protection equipment. Methodical outfitting protects your teams and secures the project's profitability.

Selection criteria for fall protection devices based on work type

Sizing personal fall protection equipment comes into play when collective fall protection cannot be deployed. In accordance with art. 29 OTConst, where it is technically impossible or too hazardous to erect edge protection under art. 22 OTConst, façade scaffolding under art. 26 OTConst or a safety net, equivalent protective measures must be adopted and laid down in writing with the help of an occupational safety specialist. The employer applies art. 82 LAA to determine all preventive measures suited to actual working conditions, ensuring necessary resources are provided pursuant to art. 27 OLT 3 and art. 3 OPA. Under a contract for work and services, the contractor procures the necessary resources, equipment and tools at their own expense in application of art. 364 CO.

Choosing a fall arrest harness compliant with EN 361 depends directly on task duration, required freedom of movement and anchor point layout. For sheet-metal or waterproofing work on flat or pitched roofs, the dorsal or sternal attachment point connects to an energy-absorbing lanyard or a retractable fall arrester. Ergonomic adjustment of thigh straps and shoulder straps is crucial to prevent suspension trauma if a worker falls into free space. During these tasks involving fall protection equipment, wearing a helmet with a chinstrap is explicitly required under art. 6 OTConst.

The working environment also dictates the choice of connecting devices. A retractable type fall arrester with steel wire rope or reinforced webbing is suitable for vertical access or flat surfaces without sharp edges. Where unplastered parapets or profiled metal sheeting are present, the connector must feature certified edge resistance to avoid snapping instantly upon a fall. For work on façades or structural steel framing, temporary horizontal lifelines made of synthetic rope or webbing allow continuous travel over several metres, provided the residual sag remains compatible with the available fall clearance.

Before work starts, the employer ensures a plan is in place detailing the measures needed for the work carried out on the construction site, including first-aid organisation, in accordance with art. 4 OTConst. This document must be drawn up in writing or in a format that allows written proof to be furnished. On site, the employer designates a competent person for occupational safety and health protection on each construction site, capable of giving instructions to workers under art. 5 OTConst. Rescue planning is an integral part of the written plan: freeing a suspended worker must be feasible using equipment planned and available on site, without relying exclusively on external emergency services.

Comparative table of work restraint and fall arrest systems

Device category Technical or normative requirement Recommended site application Periodic inspection points
Full-body fall arrest harness Compliance with standard EN 361 with fall indicators Roof work, steel erection, scaffolding Structural stitching, buckle corrosion, webbing tears
Retractable fall arrester (inertia reel) Instant lock and impact-resistant housing Vertical travel on masts or uniform inclined surfaces Locking speed, cable or webbing condition, swivel snap hook
Lanyard with integrated energy absorber Progressive deployment reducing impact force Fixed rebar tying station, slab-edge masonry Textile protective sleeve integrity, no initial cuts or tears
Synthetic temporary horizontal lifeline Mechanical tensioner with nominal tension indicator Continuous edge access on roofs or bridge decks End anchor stability, deflection under load, abrasive wear
Temporary anchor point for steel structures Beam clamp or webbing sling Attachment to rolled beams or framework members Mechanical tightness, geometric deformation, host beam compatibility

Common procurement and installation mistakes on construction sites

Confusing work restraint devices with fall arrest systems is a common compliance error. A work positioning belt lacks the mechanical characteristics required to absorb a dynamic deceleration. Supplying a worker with a simple waist belt in a fall hazard zone exceeding two metres—the threshold specified in art. 41 OTConst for roof edges—exposes site supervision to prosecution under art. 229 CP for deliberate breaches endangering human life or physical integrity. Unplanned replacements of inadequate gear trigger emergency procurement surcharges of 800 CHF to 2 500 CHF per crew.

Another frequent oversight is underestimating the required fall clearance. Using a two-metre fixed lanyard with an energy absorber on a construction site with less than five metres of free fall distance will result in hitting the ground or an intermediate obstruction before the tear webbing finishes deploying. Procuring retractable fall arresters rated for low fall clearance is essential here, failing which the structural work trade must halt to reconfigure decking, causing project delays running into thousands of Swiss francs.

Failing to assess anchor strength is another critical weak point. Securing a temporary lifeline to makeshift guardrails or an undersized timber purlin compromises the entire safety chain. Downtime incurred to run structural calculations or install cast-in anchor posts triggers daily delay penalties that the client can enforce through contractual remedies under the Code of Obligations (CO).

Illustrative practical cases (typical scenarios on Swiss construction sites)

The situations described below represent standard scenarios compiled as practical examples to guide technical decisions on Swiss construction sites.

Standard Scenario 1: Sheet-metal renovation on an industrial roof in the Canton of Vaud

On an artisanal commercial facility located in the Canton of Vaud, a team of four workers is replacing peripheral gutters on a low-slope 15-degree roof. The free fall height to ground level is 6,50 metres. Because ground access is blocked by logistics loading bays, site management deems continuous façade scaffolding technically unfeasible. In accordance with art. 29 OTConst, the contractor appoints an occupational safety specialist to define an equivalent solution in writing.

The health and safety plan, documented in writing pursuant to art. 4 OTConst, specifies installing a temporary horizontal lifeline made of high-tenacity textile webbing, anchored to structural nodes of the reinforced concrete frame. Each operative is outfitted with an EN 361 harness, a 10-metre composite-housing retractable fall arrester certified over sharp edges, and a safety helmet with a chinstrap as required by art. 6 OTConst. The team leader, appointed as the competent person under art. 5 OTConst, inspects the nominal line tension and connector lockings daily before work. A telescopic pole rescue kit is staged at the ridge with two trained workers on hand, ensuring an operative can be retrieved in under ten minutes.

Standard Scenario 2: Steel frame erection for a sorting centre in the Canton of Valais

On the Rhône plain in Valais, a logistics warehouse requires assembling steel framework members up to 8 metres above ground. The crew consists of three steel erectors. During intermediate beam alignment, installing safety nets below is impossible because mobile cranes and mobile elevating work platforms operate continuously in the area. The employer applies art. 3 OTConst by planning methods in advance to minimise fall hazards.

The selected solution relies on bolting standard rated lifting lugs directly onto the top flanges of beams before hoisting. Once elevated in the platform basket, workers tie off to these certified structural points using a twin-tail Y-lanyard with a textile energy absorber, ensuring 100% tie-off while transitioning between profiles. The harnesses feature sternal attachment points to ease bolt-hole line-up and high-strength fastener torquing. This strict method allows the operation to proceed without an injury while keeping pace with the milestones set out in the contract for work and services.

Free construction site calculators

Thirty-five trade calculators: site installations, waste, concrete, screeds, insulation, scaffolding. No sign-up required.

View trade calculators

Frequently asked questions

When does a fall arrest harness become mandatory under OTConst?

Art. 41 OTConst mandates appropriate measures to prevent falls from heights of two metres or more on roofs. If erecting edge protection under art. 22 OTConst proves technically impossible, personal protective equipment is required. This preventive equipment represents an average investment of roughly 420 CHF per worker on the construction site.

What type of helmet must be worn with a fall arrest harness?

Under art. 6 OTConst, a safety helmet with a chinstrap is mandatory when working with fall protection equipment. The employer applies this preventive measure under art. 82 LAA to protect workers against head injuries. This certified equipment represents an illustrative outlay of around 95 CHF per person.

Who plans temporary lifelines on a construction site?

Under art. 4 OTConst, the employer draws up a written plan detailing the safety measures before starting work. In accordance with art. 5 OTConst, they also designate a competent person to supervise the crew in the field. Formalising this technical file entails an indicative investment of around 350 CHF per operation carried out.

When can you deviate from collective fall protection?

Under art. 29 OTConst, when it is impossible to erect a guard rail or facade scaffolding, equivalent protective measures are set out in writing with a safety specialist. In this context, the annual inspection of each piece of fall arrest equipment represents a maintenance expense of around 180 CHF per checked harness.

What criminal liability applies for non-compliance with fall arrest rules?

Pursuant to art. 229 CP, anyone who intentionally breaches recognised engineering standards while directing works and knowingly endangers others faces a custodial sentence of up to five years or a monetary penalty. The employer enforces art. 3 OPA to avoid expert appraisal disputes amounting to around 4500 CHF.

How do you incorporate this equipment into the work contract?

Art. 3 OTConst stipulates that site-specific measures are governed by the work contract. Under art. 364 CO, the contractor procures the necessary tools and equipment at their own expense, unless custom dictates otherwise. According to standard SIA 118, these systems constitute an estimated line item of around 1200 CHF per installation.

Securing work at height requires rigorous coordination between site management and contractors. To further your technical expertise on Swiss construction sites, explore our specialised guides and calculators:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.