Personal Protective Equipment (PPE) for Swiss Construction Sites: SUVA, OTConst & CFST 6508 Compliance Guide

Complete guide to PPE on Swiss construction sites. SUVA, OTConst, and CFST 6508 compliance. Protect your teams and prevent costly site shutdowns.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Failing to provide proper equipment creates direct financial exposure. If an inspection uncovers non-compliance with the Construction Work Ordinance, work can be halted immediately. A construction site shutdown to rectify personal protective equipment breaches leads to downtime costs running into thousands of Swiss francs (CHF) per day, not to mention delay penalties under the work contract. Emergency replacement of non-compliant gear with items meeting recognised standards, such as EN 361, often comes at premium prices, taking a heavy toll on project margins.
  2. Legal / Joint Body / SUVA: Employer liability is strict. Under art. 82 LAA, the employer must take all measures to prevent occupational accidents and diseases shown by experience to be necessary, applicable according to the state of technology, and adapted to local conditions; workers must assist the employer by using personal protective equipment in particular. In the event of a serious accident caused by a lack of gear, art. 229 CP states that anyone who intentionally violates recognised technical rules when directing or executing construction work, thereby knowingly endangering the life or limb of individuals, faces a custodial sentence of up to five years or a monetary penalty.
  3. Administrative / Acceptance: Missing documentation proving compliance disrupts project delivery. Art. 4 OTConst stipulates that before work begins, the employer must ensure there is a plan setting out the necessary measures for the tasks carried out on the construction site, including first-aid arrangements, drawn up in writing or in a form that can be verified through text. If compliance certificates under directive CFST 6508 are missing, site management can order work suspended, delaying joint inspection and the final handover of the works.

Rigorous management of personal protective equipment on Swiss construction sites is an absolute operational requirement for any contractor looking to safeguard workers' physical safety and preserve bottom-line margins. The Construction Work Ordinance sets out comprehensive employer obligations to prevent accident risks. Selecting and issuing personal protective equipment demands a structured risk management strategy. Every site manager must ensure that the gear provided matches the hazards identified during planning. Whether dealing with falls from height, noise nuisance, machine vibration, or the inhalation of hazardous dust, each situation requires a certified technical solution. Supervisory bodies enforce these directives strictly through unannounced site inspections. They look particularly closely at the match between assessed hazards and technical protection ratings, such as acoustic attenuation on ear defenders or filtration efficiency on respirators relative to workplace exposure limits. Investing in top-grade gear that complies with current European standards recognised in Switzerland ensures legal compliance while driving operational efficiency by keeping injury-related downtime to a minimum.

Beyond merely buying gear, establishing an effective safety policy relies on a structured organisation in line with directive CFST 6508 on consulting occupational physicians and other safety specialists. This approach requires an in-depth workstation review to pinpoint precise equipment requirements. For instance, art. 6 OTConst makes protective helmets mandatory for all operations where workers face hazards from falling objects or materials, specifying that helmets must be worn at all times during construction works until structural work is complete, near cranes and earthmoving equipment, and during excavation, demolition, and scaffolding erection and dismantling. High-noise operations call for hearing protection with attenuation matched to the emitted sound frequencies. For work at height, full-body harnesses complying with EN 361 are non-negotiable. This guide helps construction professionals select their safety equipment. It details the essential technical criteria for specifying suitable safety footwear, respiratory protection effective against silica dust, and fall-arrest systems that deliver uncompromising safety. Built on the requirements of the Ordinance on the Prevention of Accidents and Occupational Diseases, this resource provides the practical steps needed to foster an enduring safety culture. The goal is simple: equip your crews with compliant gear to keep projects on schedule and within budget.

Regulatory Framework and PPE Specification Obligations

Specifying personal protective equipment in the Swiss construction sector is governed by a strict legal framework anchored in the Federal Act on Accident Insurance and detailed by the Ordinance on the Prevention of Accidents and Occupational Diseases. The employer bears primary, non-delegable responsibility for ensuring safe working conditions. This duty of result calls for a proactive approach: identifying hazards and supplying appropriate gear. Under art. 27 OLT 3, the employer must furnish personal protective equipment whenever risks cannot be eliminated fully through technical or organisational safeguards. This equipment must be provided at no cost to the employee and maintained in fully functional working order.

SUVA serves as the primary enforcement and monitoring authority for occupational health and safety across Swiss construction sites. Its inspectors have the authority to audit construction sites, check personal protective equipment compliance, and order an immediate work stoppage if serious violations compromise worker safety. At the same time, joint parity commissions, mandated by the social partners under the National Collective Labour Agreement for the Swiss Main Construction Trade and cantonal collective labour agreements, monitor compliance with health and safety provisions. These joint checks maintain sustained pressure on contractors to uphold top safety standards.

Employees are legally bound to assist their employer in implementing safety measures. They must use the personal protective equipment provided correctly, maintain its structural integrity, and promptly report any defects or early signs of wear to local site management or the designated competent person on site. Persistent refusal to wear personal protective equipment warrants disciplinary action up to and including removal from the construction site, as individual non-compliance must never compromise collective safety or expose site managers to criminal liability.

Directive CFST 6508 also requires companies to consult occupational physicians and other safety specialists whenever internal expertise is insufficient to assess complex risks, such as prolonged exposure to silica dust, asbestos, or mechanical vibrations. Involving these specialists in the specification workflow ensures that the chosen equipment delivers genuine, documented protection validated by scientific data and on-site measurements.

Methodology for Specifying Personal Protective Equipment in Switzerland

Specifying personal protective equipment is never something to leave until the day the construction site opens. It requires a rigorous methodology integrated during project planning by site management and specialist engineers. This structured process guarantees that every Swiss franc (CHF) invested in safety delivers genuine protective value.

Step 1: Assess specific hazards for each workstation and environment

The initial phase involves mapping out the hazards inherent to scheduled tasks and the construction site environment. This assessment must be thorough and documented. For example, in underground work or trenches, art. 68 OTConst provides that excavations, shafts, and earthworks must be arranged so that falling or caving ground poses no risk to workers. Even when collective measures like trench shoring are installed, the residual risk of falling debris still makes head protection mandatory. Similarly, art. 17 OTConst requires measures at workstations and transit routes to ensure workers are not endangered by collapsing structural elements or falling objects and materials. Environmental assessments must also address physical hazards: art. 22 OLT 3 states that noise and vibration must be prevented or mitigated through engineering measures, plant modifications, source isolation or soundproofing, and work organisation. When collective measures reach their technical limits, specifying individual protective equipment becomes mandatory. Finally, Switzerland's frequently harsh weather conditions must be planned for, as art. 37 OTConst mandates that appropriate steps be taken to protect workers during operations carried out in direct sun, extreme heat, or cold.

Step 2: Select the appropriate PPE category

Once hazards are identified and quantified, the specifier must select the equipment category capable of eliminating the danger without introducing secondary risks. This selection is carried out in consultation with foremen and, where appropriate, occupational safety specialists. The review determines whether workers require respiratory protection, hearing protection, fall-arrest gear, head protection, or protective footwear. Selection should focus on equipment that strikes the best balance between the required protection level and ergonomic comfort, ensuring optimal user acceptance on the ground.

Step 3: Review normative requirements and exposure limits

Selected equipment must strictly comply with applicable technical standards and the specific demands of the task. The specifier confirms compliance with European standards recognised in Switzerland, such as EN 361 for fall-arrest harnesses or EN 12492 for mountaineering-style helmets suited to work at height. For chemical and particulate hazards, you must confirm that the equipment keeps exposures below workplace thresholds. For instance, specifying respiratory protective equipment requires factoring in assigned protection factors to ensure that inhaled concentrations of silica dust or asbestos fibres remain strictly below the SUVA VLEP limit. This technical check frequently requires reviewing safety data sheets for handled products alongside manufacturer user manuals.

Step 4: Document the decision and ensure equipment allocation tracking

The final step in the specification methodology consists of formally recording the chosen items in the health and safety plan of the construction site. Local site management must keep an accurate register of provisions, including the worker's name, the type of equipment supplied, the date of issue, and the signature of the recipient confirming they have received the equipment and the necessary instructions for its use. This traceability is essential to prove, in the event of a SUVA inspection or an accident, that the company has fulfilled its legal obligations. In addition, the documentation must include the maintenance plan, equipment expiry dates, and regular inspection protocols carried out by competent persons.

Comparative Table of Equipment Categories and Standard Requirements

The table below summarises the main personal protective equipment categories, their associated normative requirements, their typical uses on Swiss construction sites, and the key checkpoints upon receipt of the equipment by site management.

Equipment family Task requirement or standard Typical use on the construction site Checkpoint upon receipt
Head protection (Helmets) Standard EN 12492 (work at height) Erecting scaffolding, rope access work, crane lifting operations Presence and integrity of the chinstrap, verification of manufacturing date, absence of hairline cracks on the shell
Respiratory protection (Masks) SUVA OELs, CFST 6508 directive Demolition, concrete sawing, remediation of asbestos-containing materials Appropriate filter class (FFP3 or P3), tight facial fit, verification of filter expiry date
Hearing protection (Earmuffs, earplugs) Appropriate SNR attenuation rating Use of jackhammers, circular saws, operating heavy earthmoving machinery Certified attenuation rating matching the measured noise level, mechanical compatibility with the safety helmet
Fall protection (Harnesses, lanyards) Standard EN 361 Work on sloped roofs, use of aerial work platforms, operations near unprotected slab edges Presence of conformity markings, up-to-date annual inspection register, flawless condition of stitching and metal buckles
Foot protection (Safety shoes, boots) Categories S3 or S7 (puncture-resistant, water-repellent) Structural work, civil engineering, earthmoving in wet conditions Integrity of the puncture-resistant sole, condition of the protective toe cap, proven water penetration resistance
High-visibility clothing (Vests, jackets) High visibility (class 2 or 3) Work in the immediate vicinity of road traffic or moving construction machinery Cleanliness and reflectance of retroreflective strips, compliance and intensity of fluorescent colours

Summary of Selection Criteria for Compliant Provision

Specifying personal protective equipment goes beyond merely satisfying a legal or normative requirement; it must incorporate comprehensive consideration of usability and real-world effectiveness in the field. The core selection criteria rest on several key pillars that every occupational safety officer must master to ensure equipment provision is both compliant and accepted by the crews.

First, ergonomics and wearer comfort are decisive criteria. Uncomfortable, heavy equipment that hinders natural movement will inevitably be worn incorrectly or even bypassed by the worker. Site management must ensure they offer adjustable equipment, available in multiple sizes, tailored to the morphology of each individual. For example, selecting a safety helmet must take into account weight balance, internal ventilation, and the quality of the suspension harness. Ergonomic equipment reduces physical fatigue and increases alertness, thereby indirectly contributing to accident prevention.

Second, compatibility between different items of personal protective equipment is an absolute requirement. On a structural work construction site, workers frequently need to wear a helmet, safety glasses, earmuffs, and a respirator at the same time. If these items are not designed to integrate seamlessly, their overall effectiveness collapses. Ill-fitting earmuffs caused by the arms of safety glasses lose their attenuation capacity, exposing the worker to irreversible hearing damage. The specifier must therefore favour modular systems or rigorously test equipment combinations before signing off on provisions.

Third, durability and ease of maintenance directly affect total cost of ownership and long-term safety levels. The harsh conditions on Swiss construction sites, marked by dust, mud, mechanical impacts, and temperature fluctuations, put materials to the test. Selected equipment must withstand these strains while remaining easy to clean and inspect. Replaceable components, such as scratched visors, earmuff sealing rings, or respirator filters, must be readily available and proactively managed by the company's tool storeman. A strict disposal procedure must be enforced as soon as equipment shows any sign of structural weakness, particularly for fall arrest harnesses following mechanical loading.

Fourth, adaptation to specific weather and environmental conditions is crucial. High-visibility clothing must be breathable in summer to prevent heat stress, while providing adequate insulation in winter. Safety glasses must be treated with anti-fog coatings to ensure clear vision when transitioning between cold, damp areas and heated indoor spaces. Similarly, protective gloves must retain their flexibility and grip even in sub-zero temperatures, which are common on Alpine construction sites.

Furthermore, specification must take into account the evolving constraints of the construction site. Art. 26 OTConst points out that for facade scaffolding on building construction projects, a facade scaffold must be erected as soon as the fall height exceeds 3 m, with a top guardrail extending at least 80 cm above the edge of the highest work area with a fall risk. When these collective fall protections are being erected or dismantled, temporary use of personal fall protection equipment is mandatory. The specified gear must therefore provide the necessary flexibility to adapt to these critical transition phases.

Finally, training and informing workers are the essential counterpart to any equipment specification. Issuing high-tech personal protective equipment, such as a powered air-purifying respirator or a portable gas detector, is pointless if the user does not understand its operation, its limitations, and its alarm signals. The competent safety officer on the construction site must organise regular, documented instruction sessions delivered in a language understood by the workers. This instructional approach turns personal protective equipment, often perceived as an administrative burden, into a genuine work tool that is valued and respected by all construction personnel.

Equipment Provision Strategies Across Execution Phases

Safety policy on a Swiss construction site requires equipment allocation that is strictly tailored to the specifics of each phase. Site management must anticipate equipment needs based on the progression of the structure, concurrent activities, and local environmental constraints. Standardised provision often proves insufficient in the face of complex structural work operations or insidious hazards encountered during renovation works. A distribution matrix should be set up, cross-referencing the requirements of the construction work ordinance with CFST 6508 directives.

The table below outlines the standard equipment package required for the main situations encountered on construction sites, incorporating technical standards such as EN 361 for fall arrest systems and EN 12492 for head protection.

Execution phase and situation Main identified hazards Mandatory standard issue Specific gear and complementary measures
Structural work and earthmoving
Presence of heavy machinery, cranes, open excavations.
Falling objects, crushing, impacts by vehicles, high noise levels. Safety helmet (EN 12492), safety shoes with puncture-resistant soles, handling gloves. Pursuant to art. 7 OTConst, high-visibility clothing must be worn during work near means of transport such as construction machinery or transport vehicles, or near public roads. Hearing protection matched to the decibel level.
Finishing work and fit-out
Building services, plastering, painting, carpentry.
Cuts, eye injuries from flying debris, dust inhalation, contact with chemical products. Safety glasses, cut-resistant gloves, lightweight safety shoes. Appropriate respiratory protection masks (half-masks or full-face masks) according to the safety data sheets of products used. Knee pads for prolonged floor work.
Renovation and alterations
Work on existing structures, partial demolition.
Exposure to asbestos fibres, silica dust, lead, partial structural collapse. Disposable sealed coveralls, impermeable gloves, decontaminable safety boots. FFP3 masks or powered air-purifying systems (observing SUVA OELs). Specific decontamination equipment.
Work at height and roofing
Incomplete scaffolding, slab edges, roof framing.
Falls from height, slips, suspension trauma in the event of a fall. Full body fall arrest harness (EN 361), safety helmet with fastened chinstrap. According to art. 29 OTConst, where it is technically impossible or too hazardous to erect an edge protection barrier, a facade scaffold, a safety net, or a catch scaffold, equivalent protective measures must be adopted and specified in writing in consultation with an occupational safety specialist. Temporary lifelines and energy absorbers.

This matrix serves as a decision-making tool for local site management, but it never replaces a specific risk assessment when introducing new work methods or bringing new subcontractors onto the site.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and scenarios shown below are illustrative examples constructed to demonstrate how directives apply, and in no way represent real construction sites.

Scenario 1: Construction of a residential complex (structural work) - Canton of Vaud

Project background: A contractor is building the reinforced concrete structure of a building. The crew comprises 12 workers. The construction site is located in a dense urban area, with significant noise pollution generated by compressors and concrete vibrators.

Selected equipment package: Site management opted for a high-quality equipment package. This package includes a ventilated helmet with chinstrap, tinted safety glasses, custom-moulded earplugs, high-visibility clothing, and safety boots suited to wet and rebar-heavy environments.

Normative justification: Prolonged exposure to machine noise emissions calls for strict preventive measures. Under art. 36 OTConst, if the noise exposure level cannot be reduced below the exposure limit value through technical or organizational measures, suitable hearing protection must be worn. Investing in custom-moulded protectors guarantees optimal wear rates.

Illustrative financial estimate: Unit cost of the package estimated at 450 CHF excluding taxes per employee. For 12 people, the investment totals 5 400 CHF excl. VAT. With Swiss VAT at 8,1 % (437,40 CHF), the total budget comes to 5 837,40 CHF incl. VAT. This preventive investment remains negligible compared to the costs of a site shutdown.

Scenario 2: Alteration of an office building (asbestos abatement and demolition) - Canton of Geneva

Project background: A crew of 6 workers is carrying out interior demolition of a building. Diagnostics revealed the presence of asbestos glues beneath floor coverings and a risk of silica dust emissions during the cut-off sawing of masonry partitions.

Chosen equipment kit: The team is equipped with powered air-purifying full-face respirators fitted with P3 filters (guaranteeing compliance with SUVA OEL values), particle-tight chemical protective suits, layered nitrile gloves, and technical base layers for thermal regulation.

Regulatory justification: According to art. 32 OTConst, if the presence of substances particularly dangerous to health (asbestos, PCBs) is suspected, the employer takes the necessary measures, identifies and assesses the hazards, plans the measures, and informs the workers of the diagnostic results. Furthermore, art. 33 OTConst stipulates that ambient air at workstations must contain between 19 and 21 % oxygen by volume and the limit values for hazardous substances must not be exceeded; hazardous substances are evacuated to the open air, filtered, or diluted by mechanical ventilation; air quality is regularly monitored; if technical or organisational measures are insufficient, respiratory protective devices must be used.

Illustrative financial estimate: Unit cost of a powered air-purifying respirator system estimated at 1 800 CHF excluding taxes per operative. For 6 people, the total amounts to 10 800 CHF excl. VAT. With Swiss VAT at 8,1 % (874,80 CHF), the total cost reaches 11 674,80 CHF incl. VAT. This budget is factored into initial tenders to ensure profitability.

Equipment Acceptance and Commissioning Protocol

Procuring the equipment is only the first step. Issuing it must follow a rigorous protocol to ensure that each item performs its protective function. Informal handovers must be strictly prohibited. Site management establishes a documented inspection procedure.

Pursuant to art. 3 OPA, the employer takes the protective arrangements and measures that comply with the provisions of the ordinance, with other applicable occupational safety provisions, and with recognised rules of safety engineering and occupational medicine. This requires meticulously checking the conformity of deliveries before any field use.

The following checklist must be applied upon reception and distribution:

  • Documentary check and markings: Check for conformity markings on every product, ensure that instruction manuals are provided in national languages understood by the workers, and verify type-examination certificates for complex category equipment (fall protection, respiratory protection).
  • Visual integrity inspection: Check for manufacturing defects, deformations on helmet shells, frayed stitching on harness webbing (EN 361), or corrosion on metallic connectors.
  • Expiry date verification: Note manufacturing dates and maximum service lives indicated by manufacturers, particularly for plastic components, technical textiles, and respiratory filters.
  • Individual fit testing: Carry out individual adjustments for each employee. A poorly fitted FFP3 mask or one worn over an unshaven face loses virtually all its sealing effectiveness. A loose harness can cause severe injuries when arresting a fall.
  • Handover documentation: Have each worker sign an equipment issue receipt, certifying not only receipt of the gear, but also full understanding of the operating instructions and equipment limitations.

Common Non-Conformities and Operational Impacts on Works

Despite planning, observations on Swiss construction sites reveal recurring errors in equipment usage. These failures compromise workers' health and expose supervisory staff to major legal liabilities. The false sense of security generated by unsuitable gear leads workers to take reckless risks.

Common mistakes include incompatibility between different items of PPE worn simultaneously. For instance, wearing safety glasses whose temples push open earmuff cushions drastically reduces the calculated SNR attenuation. Likewise, wearing beanies under hard hats negates the shock-absorption capacity of the internal cradle. Dust filters are also mistakenly used during tasks that generate organic vapours, rendering the protection completely ineffective.

Faced with such deviations, supervisors must act immediately. Art. 5 OTConst requires the employer to appoint on every construction site a competent person responsible for occupational safety and health protection who is authorised to issue directives to workers; anyone whose conduct or condition endangers themselves or others must be removed from the construction site. Strictly applying this provision maintains firm safety discipline.

The consequences of negligence in supervising PPE compliance can be severe under criminal law. In the event of a serious accident resulting from a blatant equipment failure or managerial tolerance of non-compliance, judicial authorities may invoke art. 229 CP. This provision states that whoever, in directing or executing a construction or demolition, intentionally breaches the recognised rules of the art and thereby knowingly endangers the life or physical integrity of persons is liable to a custodial sentence of up to five years or a monetary penalty; if committed through negligence, up to three years or a monetary penalty. The liability of the site management is therefore fully engaged in continuous on-site compliance monitoring.

Maintenance, Storage, and Lifecycle of Safety Equipment

The long-term performance of equipment depends inherently on proper maintenance and storage. Gear left behind in a vehicle, exposed to UV radiation or temperature fluctuations, suffers accelerated degradation of its mechanical and chemical properties. Lifecycle management is an integral component of construction site preparation.

Locker-room containers must be set up to allow proper drying of clothing and footwear, thereby preventing dermatological conditions. Sensitive equipment, such as fall-arrest harnesses and respirators, must be stored in clean cabinets protected from moisture and direct sunlight.

Routine maintenance requires cleaning in strict accordance with the manufacturer's specifications. Using harsh solvents on a polycarbonate hard hat causes invisible micro-cracks, ruining its impact resistance. Respiratory filters must be replaced as soon as breathing resistance increases or an odour is detected, and valves must be inspected periodically.

Finally, decommissioning and destroying obsolete or shock-impacted equipment must be systematic. A harness that has arrested a fall must be cut up immediately to prevent accidental reuse. Keeping an inventory register documenting commissioning dates and disposal records provides undeniable proof of the company's due diligence in protecting its workforce.

[00:00 - 00:15] AI Avatar: "Think handing out a hard hat is enough to keep you legally protected? In Switzerland, incomplete PPE under Construction Works Ordinance requirements can shut down your construction site in minutes."

[00:15 - 01:10] Screen & Diagrams: "Explore our platform. The screen displays the distribution register. We select a bricklayer profile. The system checks compliance with CFST 6508: FFP3 masks, hearing protection, and EN 361 harnesses. An animated normative diagram illustrates areas requiring specific safety glasses and gloves. The calculator validates vibration exposure times."

[01:10 - 01:30] AI Avatar: "Never leave safety to chance again. Access our compliance tools and train your teams through our academy to guarantee a flawless working environment."

Free construction site calculators

Thirty-five trade calculators: site installations, waste, concrete, screeds, insulation, scaffolding. No sign-up required.

View trade calculators

Frequently asked questions

Who pays for personal protective equipment (PPE) on a Swiss construction site?

Under the Ordinance on the Prevention of Accidents and Occupational Diseases, the employer must provide personal protective equipment to employees free of charge. Deducting the cost of a hard hat or harness from wages is strictly prohibited. If a company buys S3 safety footwear at an illustrative cost of 150 CHF per employee, this expense remains entirely at its charge. Art. 3 OTConst specifies that an employer wishing to act as a contractor under a contract for work must examine the measures needed to ensure occupational safety prior to concluding the contract.

Must an independent subcontractor wear the same PPE as main contractor employees?

Absolutely. CFST 6508 directive and the Construction Works Ordinance apply to everyone present on the site. Site management demands total compliance. A self-employed person hired for sheet-metal work, billing an illustrative service of 4500 CHF, must wear their hard hat. Art. 27 OLT 3 governs the use of personal protective equipment. If the subcontractor refuses to comply, the person responsible for safety is required to remove them from the site immediately to prevent any risk of a serious accident.

What is the legal lifespan of a construction hard hat under Swiss standards?

Swiss legislation, notably the Machinery Safety Ordinance, does not establish a universal expiry date, but refers to the manufacturer's specifications (generally three to five years). The employer must guarantee equipment in pristine condition. A hard hat subjected to a violent impact must be replaced immediately. The replacement cost, around 40 CHF by way of illustration, is negligible compared to the risks. Art. 17 OTConst requires measures to be taken at workstations to ensure workers are not endangered by falling objects.

Are safety glasses mandatory at all times for structural work?

Wearing safety glasses is not an absolute, continuous obligation like a hard hat, but becomes mandatory as soon as the risk assessment dictates it. The Construction Works Ordinance requires hazard evaluations. During concrete grinding or drilling operations, eye protection is strictly required. An injury can incur costs exceeding an illustrative amount of 20 000 CHF. The employer must provide suitable protective eyewear, including prescription models, to guarantee sharp and safe vision across the entire site.

How should PPE be managed during work exposed to extreme summer heat?

Extreme temperatures never exempt anyone from wearing vital equipment. Art. 37 OTConst stipulates that during work carried out in the sun or under intense heat, the necessary measures must be taken to protect workers. This means adapting work schedules and providing specific PPE such as ventilated hard hats. Taking off high-visibility clothing is prohibited. A site shutdown ordered by inspectors for non-compliance with the rules can cost an illustrative penalty of 3000 CHF per day of schedule delay.

Does wearing a fall-arrest harness replace installing facade scaffolding?

No, collective protection always takes precedence over personal protection. Art. 26 OTConst requires facade scaffolding to be installed as soon as the fall height exceeds three metres. An EN 361 certified harness is only permitted for very short-duration work. If a contractor tries to save an illustrative scaffolding rental cost of 5000 CHF by relying solely on ropes without technical justification, it risks immediate site closure by the supervisory bodies and severe criminal consequences.

Which safety footwear should you choose for earthmoving and trench excavation work?

For heavy outdoor work, category S3 or S7 safety boots or shoes are essential. They ensure a penetration-resistant midsole and water resistance. Art. 68 OTConst specifies that excavations and earthworks must be arranged so that falling or caving material endangers no worker. Rough terrain requires optimal ankle support. Investing in high-quality boots, for an illustrative budget of 250 CHF a pair, prevents sprains and crush injuries.

What risks does the company face if an employee refuses to wear hearing protection?

The company bears direct liability. Art. 22 OLT 3 requires noise and vibrations to be avoided or tackled through various measures. If hearing protection is required, the employer must enforce its use. Zero tolerance applies. If an employee persistently refuses to wear their ear defenders, they must be removed from the site. Recognised occupational deafness can lead to disability pensions representing an illustrative capital of 300 000 CHF, having a lasting impact on the company's premium rate.

To deepen your knowledge and ensure your personal protective equipment complies with authority requirements, consult our detailed resources: