Practical guide

Site Earmuffs and Custom Moulded Earplugs: Calculating Exact SNR Attenuation for Machine Noise

Swiss guide to calculating the SNR rating of construction site earmuffs and earplugs according to SUVA requirements and art. 36 OTConst.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: An inaccurate estimation of the SNR index leads to discarded PPE and productivity losses in the range of 3 500 CHF to 9 000 CHF per crew. Under art. 364 CO, the contractor procures the necessary resources, plant, and tools at their own expense.
  2. Legal / Parity / SUVA: Failure to provide hearing PPE breaches art. 36 OTConst, which requires appropriate hearing protection to be worn if sound levels cannot be lowered technically. Art. 82 LAA requires the employer to take all necessary preventive measures proven by experience.
  3. Administrative / Handover: Work stoppages during safety inspections disrupt the structural work schedule governed by standard SIA 118, leading to site installation extension costs in the region of 1 200 CHF per day of stoppage.

Sizing hearing protection on Swiss construction sites requires a rigorous evaluation of the acoustic pressure emitted by machinery. Site managers and site supervisors must calculate the SNR acoustic attenuation to ensure that the residual noise level perceived by the worker falls within the safety range recommended by SUVA. Insufficient attenuation exposes the operator to irreversible hearing damage during core drilling or concrete crushing. Conversely, overprotection isolates the tradesperson from their immediate environment, masking reversing alarms and operating instructions, which significantly increases the risk of accidents on the work area.

This technical guide reviews operational selection criteria between passive earmuffs, helmet-mounted ear defenders, and custom moulded earplugs suited for Swiss enterprises. In accordance with art. 3 OPA and art. 22 OLT 3, preventing noise-induced damage requires priority technical measures complemented by suitable personal protective equipment. We detail the method for determining the required protection based on emitted decibels, adjusting PPE wear in noisy environments, and establishing reliable protocols to safeguard workers' hearing health on construction sites across French-speaking Switzerland.

Selection criteria for hearing protection based on site constraints

Selecting personal sound attenuation equipment stems from a workstation risk assessment. Art. 36 OTConst stipulates that when noise exposure levels cannot be reduced below the limit value through technical measures or organisational arrangements, appropriate hearing protection must be worn. The employer implements this measure in accordance with art. 82 LAA, which requires occupational accident and illness prevention based on the state of the art, complemented by art. 3 OPA governing occupational safety.

Thermal adaptation is a decisive criterion. When work is carried out in extreme heat or severe cold, art. 37 OTConst mandates appropriate protective measures. An overhead headband creates perspiration under the cushions in hot weather, tempting the worker to pull it off. In extreme thermal environments or dusty conditions, reusable earplugs or custom moulded protectors provide a stable fit without loss of acoustic seal.

Compatibility with other PPE is essential. Under art. 6 OTConst, hard hats are mandatory on construction sites until the completion of structural work, as well as in the vicinity of cranes and earthmoving equipment. Helmet-mounted ear defenders must be mechanically compatible with the hard hat shell: a chinstrap or spectacle arms running beneath the cushion compromises actual sound insulation.

Finally, preserving auditory awareness prevents sensory isolation. Art. 5 OTConst requires the appointment of a competent person for safety, authorised to issue instructions. Overprotection cuts workers off from verbal warnings, crane horns, and reversing alarms, creating a severe risk of personal injury.

Comparative analysis of hearing protection equipment

These devices meet distinct operational requirements depending on the activity and the exposure time specified in art. 22 OLT 3 and art. 27 OLT 3.

Type of equipment Technical characteristics Recommended site usage Inspection points and maintenance
Helmet-mounted ear defenders Direct attachment to shell accessory slots, alternating working and standby positions. Structural work and earthworks subject to mandatory helmet use under art. 6 OTConst. Check compatibility with the shell, arm spring tension, cushion replacement.
Standalone passive earmuffs Adjustable headband with dual enveloping cups for broad overall attenuation. Prefabrication workshops, stationary rebar cutting, fixed workstations without cranes. Check headband clamping force, clean cushions with neutral soapy water.
Custom moulded earplugs Silicone ear impression with interchangeable acoustic filters. Continuous exposure, bricklayers, formworkers, and operators requiring verbal communication. Annual acoustic seal test, daily cleaning with suitable wipes, cleanliness inspection.
Reusable pre-moulded earplugs Flexible thermoplastic material with washable flanges and insertion stem. Finishing work, plastering, electrical work, occasional tasks with soiled hands. Regular washing, flexibility check, storage in individual sealed carry case.
Semi-aural banded earplugs Soft pods worn under the chin, instant insertion and removal without rolling down. Site management, site supervisors, inspectors, and brief walks through noisy areas. Inspect band spring tension, periodic renewal of replacement pods.

Common procurement mistakes and financial consequences

In procurement management for protective equipment, several misjudgements lead to extra costs that cannot be passed on to clients.

Acoustic overprotection and PPE rejection

Ordering protection with an excessively high nominal attenuation without analysing the source noise spectrum leads to complete worker isolation. Unable to hear colleagues' voices or machine pitch, the tradesperson removes the protector, exposing themselves to hazard. This rejection necessitates emergency purchases of selective attenuation models, generating adjustment surcharges in the range of 1 500 CHF to 3 200 CHF per crew.

Incompatibility with safety helmets

Under art. 364 CO, the contractor procures the necessary resources and tools at their own expense. Purchasing ear defenders that do not fit the construction helmet slots causes uneven pressure on the ears or prevents proper latching. Rushed replacements of full batches represent an unforeseen expenditure in the range of 2 000 CHF to 4 500 CHF for a structural work firm.

Premature seal wear in abrasive environments

Mineral dust and concrete residue harden sealing cushions. Failing to procure periodic hygiene kits leads to the complete replacement of the earmuffs instead of just the cushions, creating an unnecessary expense in the range of 800 CHF to 1 800 CHF per year per mobile workshop.

Lack of earplug insertion instructions

Distributing earplugs without practical instructions leads to ineffective, shallow insertion. The resulting lack of attenuation may compel the competent person designated under art. 5 OTConst to pull a worker off the noisy zone, causing an availability loss in the range of 1 200 CHF to 2 500 CHF in unproductive hours.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and scenarios presented below are illustrative examples intended to guide technical decisions on Swiss construction sites.

Scenario 1: Road infrastructure renovation in the canton of Vaud

On an earthworks and kerb demolition site involving twelve workers, noise emissions stem from an excavator with a hydraulic breaker and floor saws. Workers are required to wear safety helmets with chinstraps under art. 6 OTConst.

Site management approves the deployment of helmet-mounted ear defenders equipped with a dual standby-work position system. Machine operators and ground personnel maintain clear perception of truck reversing alarms and spoken instructions, satisfying art. 36 OTConst and art. 82 LAA. The investment amounts to around 1 850 CHF for the entire PPE batch, avoiding any work stoppages ordered by inspection authorities.

Scenario 2: Confined space refurbishment in the canton of Valais

A crew of five bricklayers performs core drilling and reinforced concrete shear wall sawing inside a building service basement in Sion. The enclosed space amplifies machine reverberation, while water spray and cutting slurry make traditional earmuffs impractical.

The company equips each tradesperson with custom moulded silicone ear protectors featuring progressive attenuation filters. This solution prevents sweat build-up and allows the bricklayers to monitor the cutting pitch to prevent diamond core bit binding. This measure complies with art. 3 OPA as well as art. 22 OLT 3 and art. 27 OLT 3 for a budget of around 1 650 CHF, amortised over multiple financial years.

Free construction site calculators

Thirty-five trade calculators: site installations, waste, concrete, screeds, insulation, scaffolding. No sign-up required.

View trade calculators

Frequently asked questions

Which is better on site: earmuffs or custom moulded earplugs?

The choice depends on comfort and exposure duration. Custom moulded earplugs support continuous eight-hour wear for an investment of around 180 CHF. Under art. 36 OTConst, appropriate hearing protection must be worn whenever noise persists.

Must the employer pay for workers' hearing protection?

Under art. 82 LAA, the employer must take all necessary and appropriate preventive measures, providing the required equipment at no cost to personnel. Art. 27 OLT 3 governs personal protective equipment. Hearing protection represents an indicative expense of around 60 CHF per person on the construction site.

Why is excessive acoustic attenuation risky on site?

Totally isolating the worker prevents them from hearing vehicle horns and verbal warning signals. In accordance with art. 3 OPA, protective measures must comply with recognised safety standards. Unsuitable overprotection creates a critical accident risk while undermining smooth operational coordination among crews.

What collective measures must precede the use of earmuffs?

Under art. 22 OLT 3, noise must be prevented or mitigated through structural measures, technical solutions, or work organisation. Installing an acoustic enclosure, for instance, costs around 450 CHF. Personal protective equipment is used only when these collective measures prove insufficient for sound attenuation.

Who enforces hearing protection compliance in the field?

Pursuant to art. 5 OTConst, the employer designates a competent person on each construction site responsible for safety and authorised to issue instructions. This supervisor monitors the effective wearing of hearing protection. Any worker neglecting these instructions jeopardises their health and faces immediate dismissal.

How can noise emissions be anticipated during site planning?

Art. 3 OTConst requires work to be planned to eliminate any risk to health. Art. 4 OTConst requires drawing up a safety plan outlining the necessary measures. Setting up mobile acoustic barriers beforehand, costing around 320 CHF, reduces noise exposure before work starts.

To explore comprehensive safety management on your Swiss construction sites further, consult our specialised guides:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.