Interactive Translator for CFC, eCCC-Bât, CAN (NPK) Codes and ACIP Chapters
Find the equivalent code in the CFC, the eCCC-Bât, the CAN and the ACIP chapters with a single search.
Interactive tool
| CFC code (SN 506 500) | eCCC-Bât code (SN 506 511) | CAN / NPK chapter (CRB) | ACIP 2026 chapter & direct link | Reference SIA standard |
|---|
ACIP 2026 reference table: the codes are those of the ACIP reference and are not contractual. The CAN / NPK catalogue and the CFC and eCCC-Bât standards are the property of the CRB: consult it for the complete official list.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="1.4"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
What is the difference between a CFC code (SN 506 500), an eCCC-Bât code (SN 506 511) and a CAN chapter number (NPK)?
Three coding systems coexist in Swiss construction, and the same item often carries three different numbers: one for the budget, one for the building element, one for the description of services. This guide offers the complete list of CFC codes Swiss construction alongside the other two systems. To find which CFC code for masonry electricity painting tiling PAC (heat pump), simply type the trade into the search engine above: the CFC and CAN NPK correspondence and the ACIP chapter appear on the same line.
1. The CFC (Construction Cost Code): the classification by trade used in budgets and general estimates (CFC 1 to CFC 9)
The SN 506 500 CFC standard, published by the CRB, classifies the costs of a building into ten main groups. It is the code of budgets, general estimates and final accounts: "211" designates, for example, masonry work.
| Code | Main group |
|---|---|
| CFC 0 | Land |
| CFC 1 | Preparatory works |
| CFC 2 | Building |
| CFC 3 | Operating equipment |
| CFC 4 | Landscaping & External Works |
| CFC 5 | Incidental costs and suspense accounts |
| CFC 6 | Free (unassigned) |
| CFC 7 | Free (unassigned) |
| CFC 8 | Free (unassigned) |
| CFC 9 | Furnishings and decoration |
2. The eCCC-Bât (Element-Based Construction Cost Code): modern costing by functional element (Excavation C, Structural work D, Facades E, Roof F, Building services G, Finishes M)
The SN 506 511 eCCC-Bât standard by elements describes the building by its functional elements rather than by trade: the same facade brings together the wall, the insulation, the render and the windows. The first letter indicates the group: C for excavation, D for structural work, E for facades, F for the roof, G for building services, M for finishes; the following digits specify the element (for example M2.3 for a ceramic floor covering).
3. The CAN / NPK (CRB Catalogue of Standard Items): the 3-digit chapter numbers used to write SIA 451 tenders
The CAN CRB Switzerland chapters (NPK in German) are the three-digit numbers that structure tender specifications: 241 for cast-in-place concrete, 314 for masonry, 671 for tiling. These are the ones you find in an architect's SIA 451 file, which the free converter opens and which the IFC reader completes on the model side. The text of the catalogue items belongs to the CRB and is not reproduced here.
Complete Official Correspondence Table: 35 ACIP Chapters ↔ CFC Codes ↔ eCCC-Bât Codes ↔ CAN Chapters
Each line links a chapter of the ACIP 2026 price list to its CFC, eCCC-Bât and CAN codes and to the reference SIA standard; the chapter links to its technical sheet. The table is grouped into four families of work.
1. Preparatory Work, Earthworks, Civil Engineering and Structural Work (CFC 11, CFC 20, CFC 211)
| ACIP chapter | CFC codes (SN 506 500) | eCCC-Bât codes (SN 506 511) | CAN / NPK chapters (CRB) | SIA technical standard |
|---|---|---|---|---|
| 01. Site Installations | CFC 113 Shared site installations CFC 211.0 Site installations (masonry) | A2 Preparatory work C1 Excavation and foundations D1 Structural work | CAN 113 Site Installations | SIA 118 / OTConst |
| 02. Demolition & Pollutants | CFC 111 CFC 112 CFC 122 | B1 Deconstruction B2 Remediation | CAN 111 CAN 112 CAN 123 | OLED Art. 16 / SIA 430 |
| 03. Earthworks & Excavations | CFC 201 Excavations / Earthworks | C1 Bulk excavation | CAN 211 Excavations and earthworks | SIA 118/201 / SIA 267 |
| 04. Civil Engineering & Pipework | CFC 15 CFC 237 CFC 421 | C2 Buried networks I1 Roadways | CAN 223 Roadways CAN 237 Drainage and sewer pipes | SIA 190 / VSS standards |
| 05. Special Foundations | CFC 171 Piles CFC 172 Excavation enclosures | C2 Deep foundations C3 Shoring | CAN 171 Piles CAN 172 Excavation enclosures | SIA 267 / SIA 118/267 |
| 06. Reinforced Concrete & Masonry | CFC 211.4 CFC 211.5 CFC 211.6 | C4 Excavation and foundations D1 Structural work D2 Structural work D3 Structural work D4 Structural work | CAN 241 Cast-in-place concrete CAN 314 Masonry | SIA 262 / SIA 266 |
| 13. Scaffolding | CFC 211.1 Façade scaffolding | A2 Preparatory works E2 Working scaffolding | CAN 114 Working scaffolding | SIA 222 / OTConst |
2. Roof Framing, Building Envelope, Waterproofing, Facades and External Joinery (CFC 214 to CFC 228)
| ACIP chapter | CFC codes (SN 506 500) | eCCC-Bât codes (SN 506 511) | CAN / NPK chapters (CRB) | SIA technical standard |
|---|---|---|---|---|
| 07. Timber Framing | CFC 214 Timber assembly | D2.2 Structural work D4.2 Structural work F1.1 Roof | CAN 331 Load-bearing timber structures | SIA 265 / SIA 118/265 |
| 08. Steel Construction | CFC 213 CFC 272 | D2.3 Structural work E2 Façades H3 Metalwork | CAN 321 Steel CAN 632 Metalwork | SIA 263 / SIA 358 |
| 09. Flat Roof Waterproofing | CFC 224.1 Flat roof waterproofing | F1.2 Flat roof covering | CAN 364 Waterproofing works for flat roofs | SIA 271 / SIA 118/271 |
| 10. Roofing (Tiles/Slate) | CFC 224.0 Pitched roof coverings | F1.3 Pitched roof covering | CAN 363 Pitched roofs, underlays | SIA 232/1 |
| 11. Sheet-metal Work | CFC 222 Sheet-metal Work | F1.2 Roof F1.3 Roof sheet-metal work | CAN 362 Sheet-metal work | SIA 232/2 |
| 12. Façades & External Insulation (ITE) | CFC 226.2 Rendered external insulation | E2.2 Façades E2.3 Façade cladding | CAN 348 Rendered external thermal insulation | SIA 243 / SIA 233 / AEAI |
| 14. Windows & External Doors | CFC 221 Windows, external doors | E3.1 Façades F2.1 Windows and external doors | CAN 371 Windows and French windows | SIA 331 / SIGaB 002 |
| 30. Blinds & Shutters | CFC 228 External closures, solar shading | — | — | SIA 118 |
3. Building Services — Electrical, HVAC (CVC), Plumbing, Photovoltaics and Lifts (CFC 23 to CFC 26)
| ACIP chapter | CFC codes (SN 506 500) | eCCC-Bât codes (SN 506 511) | CAN / NPK chapters (CRB) | SIA technical standard |
|---|---|---|---|---|
| 15. Electrical Work (Heavy/Light Current) | CFC 232 Heavy-current installations CFC 233 Light fittings | G1 Building services | CAN 511 CAN 521 | NIBT |
| 16. Heating & Heat Pumps (PAC) | CFC 242 | G3 Building services | CAN 531 | SIA 384 |
| 17. Ventilation (CVC) | CFC 244 | G4 Building services | CAN 541 | SIA 382 |
| 18. Plumbing & Sanitary Installations | CFC 251 | G5 Building services | CAN 551 | W3 |
| 19. Photovoltaics & Solar | CFC 232 CFC 242 | G1 Building services G3 Building services | CAN 511 CAN 531 | NIBT / SIA 384 |
| 20. Home Automation & EV Chargers (VE) | CFC 232 CFC 233 | G1 Building services G2 Building services | CAN 511 CAN 521 | NIBT |
| 31. Lifts | CFC 261 | G7 Building services | CAN 581 | SIA 500 |
4. Interior Fit-Out, Screeds, Plastering, Floor Coverings, Painting, Carpentry, Kitchens and Landscaping (CFC 27, CFC 28, CFC 42)
| ACIP chapter | CFC codes (SN 506 500) | eCCC-Bât codes (SN 506 511) | CAN / NPK chapters (CRB) | SIA technical standard |
|---|---|---|---|---|
| 21. Screeds (Cement/Anhydrite) | CFC 281 Floor coverings | M2 Finishes | CAN 651 | SIA 251 |
| 22. Plastering & Drywall | CFC 271 | M1 Finishes | CAN 661 | SIA 242 |
| 23. Tiling & Ceramics | CFC 281.6 Tiling CFC 282 | M2.3 Ceramic floor coverings M3.3 Ceramic wall coverings | CAN 671 Tiling | SIA 248 / SIA 118/248 |
| 24. Parquet & Wooden Floors | CFC 281 | M2 Finishes | CAN 664 | SIA 253 |
| 25. Resilient Floors & Resins | CFC 281 | M2 Finishes | CAN 664 | SIA 253 |
| 26. Painting & Wallpapering | CFC 285 | M4 Finishes | CAN 675 | SIA 257 |
| 27. Interior Joinery | CFC 273 | M1 Finishes | CAN 622 | SIA 118 |
| 28. Fitted Kitchens | CFC 258 | G6 Building services | CAN 644 | SIA 118 |
| 29. Glazing & Mirror Work | CFC 27 | — | — | SIA 118 |
| 32. Fireplaces & Stoves | CFC 241 | — | — | SIA 118 |
| 33. Landscaping & External Works | CFC 421 | I2 Landscaping & External Works | CAN 181 | SIA 318 |
| 34. In-ground Swimming Pools | CFC 422 | I3 Landscaping & External Works | — | SIA 118 |
| 35. Construction Cleaning | CFC 287 | M5 Finishes | CAN 691 | SIA 118 |
ACIP 2026 reference table, given as a guide: it is not contractual and must be confirmed against the CRB publications before any contractual use. A dash indicates a code not specified in the reference. The CFC, the eCCC-Bât and the CAN are CRB publications.
Frequently Asked Questions on the CFC, eCCC-Bât and CAN Classification in Switzerland (FAQ)
1. Which CFC code should I use for masonry, electricity, painting, tiling or a heat pump?
To find the right code, type the trade into the search engine: masonry and reinforced concrete fall under CFC 211, electricity under CFC 232, painting under CFC 285, tiling under CFC 281.6 (floors) and 282 (walls), heating and the heat pump under CFC 242. The matching CAN code and ACIP chapter appear on the same line.
Assigning a service to a code can depend on the element concerned (floor, wall, ceiling) and on the classification chosen by the architect: when in doubt, follow the one in their specification.
2. Can a CFC code be converted automatically into a CAN chapter?
Not in a strictly one-to-one way: the CFC classifies costs by trade for budgets, the CAN (NPK) breaks services down into description chapters, and the same CFC code can correspond to several CAN chapters, and vice versa. The table on this page gives the usual correspondence, line by line, with the ACIP 2026 price chapter.
For a quote or a tender, keep the code of the project's classification and use the table to find the price chapter.
3. Where can I find the complete official list of CFC, eCCC-Bât and CAN codes?
The SN 506 500 (CFC) and SN 506 511 (eCCC-Bât) standards and the catalogue of standard items (CAN / NPK) are published by the CRB (Swiss Centre for Rationalisation in Building), which holds the rights. The translator on this page is a reference correspondence table; it does not reproduce the catalogue texts.
For the complete and up-to-date list, and for the use of the items in your specifications, consult the CRB.
4. What is the ACIP chapter shown next to a CFC code for?
The 35 ACIP 2026 chapters structure the price list of the Soumission software by trade. Next to each CFC, eCCC-Bât or CAN code, the ACIP chapter shows where to find the corresponding prices to cost an item, and the link leads to the chapter's technical sheet.
The "Cost in Soumission" button opens the software to estimate the item with the ACIP 2026 base and the geographic adjustment for your canton.
Indicative information. The CFC (SN 506 500), eCCC-Bât (SN 506 511) standards and the CAN / NPK catalogue are published by the CRB.
