Layout, Crane and Scaffolding Studio

Place crane, skips, fire route and scaffolding on a scaled Swiss map: checks and quantities, in the browser.

Support address: [email protected]

Studio Demonstration: Layout Plan, Crane and Scaffolding

This demonstration follows a villa construction site from start to finish: read the plan and the crane, place a load, check fire appliance access route and power line, draw the scaffolding, check wind anchorages, then read the quantities and export. Each step has a short silent video.

The videos show the studio in the language of this page. They come from the online studio, with demonstration examples: no real plan, no construction site address.

1. The example

A detached villa on its plot: building, fence with gate, a self-erecting crane, sorting skips, a toilet and a container. The studio opens to this plan with 6 people and 16 weeks of construction site. Other steps open other examples, with ?preset= followed by the name of the example.

These are example data: no real plan, no construction site address, and no value is a recommendation.

Open the example

2. The eight-step journey

1Open the example and read the plan

Open the example with the button at the top of this page: the studio opens to the villa plan. Hover the mouse near the crane: the status line below the plan gives the distance to the mast and the permitted load (for example 944 kg at 20.0 m from the mast). The further away you go, the less the crane lifts. Below the plan, the checklist summarizes what has been achieved or what needs to be checked.

Silent video of about 18 seconds: read the plan, the permitted load and the checklist.

2Adjust the crane

Click the crane on the plan. In Crane model, choose another model (here a longer self-erecting crane): the radius circle expands. Enter the Jib direction (120°). The checklist and load chart are recalculated immediately.

Silent video of about 20 seconds: change the crane model and direction.
Model values are indicative: replace them with the manufacturer's data sheet. The crane supplier's calculation note prevails.

3Place a load to lift

Choose Load to lift in the palette and click on the plan. Enter the Load mass: 2500 kg is too heavy at this distance (the line is displayed in red), 900 kg passes (in green). The Loads to be lifted line of the checklist changes color with the load.

Silent video of about 20 seconds: place a load and change its mass.

4Check the fire services access

Open the example ?preset=pompiers: the route is rejected because bend 1 has a clear width of 3.50 m for 5.00 m required at this radius. Click the route and enter 5.5 m in Clear lane width: the alert disappears and the Fire brigade access line turns green.

Silent video of about 20 seconds: widening the fire appliance access route.
The default fire service values are not copied from the AEAI guideline: confirm them with the competent authority.

5Maintain distance from the power line

Open the example ?preset=electrique: the jib passes 3.00 m from the line while the entered clearance is 5.00 m. Click the crane and reduce its Maximum radius to 36 m: the red alert disappears and the Power lines and railway line (crane safety clearance) line turns green.

Silent video of about 19 seconds: reducing the crane radius near a power line.
Reducing the radius in the studio is for testing purposes. On the construction site, a crane zone limitation must be validated by the network operator.

6Draw the scaffolding on the plan

On the villa plan, choose Scaffolding perimeter, click the corners of the building, then double-click the last point. Click Open in Scaffolding view: the Facade scaffolding view takes over the length from the plan. Enter the eaves height (7.5 m): bays, levels, quantities surface and anchorages are recalculated.

Silent video of about 23 seconds: drawing the scaffolding and reading its results.

7Check wind anchorages

Open the example ?preset=ancrage_vent: a tarped scaffolding on brick, where the Wind anchors line is red. Choose another Cladding (none): the force per anchorage decreases and the line turns orange. The wind pressure is entered by you (0.9 kN/m² illustrative).

Silent video of about 17 seconds: changing the scaffolding cladding.
The scaffolder's calculation note is authoritative: the studio coefficients are default values.

8Read quantities and export

Open the Quantities tab: construction site quantities, without any prices. Click Export image (PNG): a single image combines the plan, the checklist and the quantities. The studio does not save anything: export before closing the page.

Silent video of about 14 seconds: read quantities and export the image.

3. What the demonstration does not show

  • The swisstopo map background, PDF plan import and calibration: these are described in the guide.
  • The PRO buttons: they are not available in the free version, there is no saving or pricing.
  • A real construction site: the values are example values, the starting values are not reread from an official source and the wind pressure is an illustration.
  • The downloaded CSV file and paper printing: these are described in the guide.
  • The figures quoted are those from the day of recording. They may change if the studio's starting values change.