Wall cross-section: U-value, thermal phase shift and Glaser diagram

Design an element (wall, roof, slab) layer by layer, view its U-value, summer thermal lag and interstitial condensation risks, then compare two variants.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

What a wall calculation is for and who uses it

On the construction site as in the technical office, the makeup of a thermal envelope determines the durability of the structure over time. This online module allows you to analyse the physical behaviour of a wall, roof, or slab build-up. Architects, timber engineers, master plasterers-painters, joiners, and facade specialists use it to dimension an intervention or verify a technical variant before execution.

During a renovation or a new build, selecting thicknesses and arranging materials is not done by guesswork. Installing insulation without checking the path of water vapour exposes the building to premature deterioration. The tool helps you visualise the complete cross-section, check thermal resistances, and identify the risk of interstitial condensation.

This calculator runs directly in your web browser, with no account creation and no sign-up. No entered data, no quantity survey, and no plan leave your workstation: processing is performed entirely locally. It is a decision-support instrument designed to quickly obtain a technical order of magnitude for a construction variant. Construction professionals in French-speaking Switzerland use it to prepare technical discussions with site management or to compare two insulation options before finalising their tender.

Building your wall layer by layer

The multi-layer wall builder allows you to assemble the various components of your building element step by step, whether for a rainscreen facade, a pitched roof between rafters, or a slab foundation. The technical cross-section is drawn to scale on your screen, incorporating specific hatching for each material family: masonry, reinforced concrete, mineral insulation, bio-based insulation, solid timber, or engineered wood panels.

For each layer, you specify the planned thickness. You can draw from a local database of generic materials integrated into the tool. This database provides thermal conductivity and vapour diffusion resistance values given as an indication. If you have the technical data sheet provided by the manufacturer or material supplier, you can directly enter the actual values: lambda conductivity, density, specific heat capacity, and mu factor.

The tool also accounts for unventilated air cavities through an integrated tabulated thermal resistance. You can arrange components from the inside out or reverse the reading direction according to the architectural detail layout. In just a few clicks, you can compare two composition variants to decide between external wall insulation and internal lining, or assess the impact of changing a vapour barrier across the entire build-up.

The U-value: what it tells you and what it does not

The U-value, or thermal transmittance coefficient, represents the rate of heat transfer through a wall under steady-state conditions for one square metre and a one-degree temperature difference between environments. The lower the U-value, the better the wall limits heat loss in winter.

The calculation engine determines internal and external surface thermal resistances based on the direction of heat flow: horizontal for external walls, upwards for roofs and ceilings, or downwards for floors over unheated basements. It then adds the thermal resistance of each layer to obtain the total thermal resistance of the wall, and calculates the reciprocal U-value.

The interface allows you to enter a benchmark limit value manually. The tool then performs a straightforward arithmetic comparison between two numbers: it shows whether the resulting U-value is lower than, equal to, or higher than the target value you entered. It makes no authoritative regulatory determination. Reference requirements from frameworks such as MoPEC or The Buildings Programme are parameters that can be fully modified by the user, alongside their source and verification status.

An essential limitation must be kept in mind: this calculation models a homogeneous continuous wall. It does not account for point or linear thermal bridges, such as facade plinths, lintel returns, structural fixings, or metal frames bridging the insulation.

Thermal phase shift: keeping summer heat out

Building envelope performance is not limited to its winter behaviour. Under direct solar radiation, the outer surface of a roof or cladding reaches high temperatures during the summer months. Thermal phase shift represents the time required for a heat wave to travel across the entire wall assembly and reach the indoor environment.

The calculation applies the periodic transfer matrix method over a full 24-hour cycle. It determines two key metrics: the transfer time expressed in hours and the thermal wave decrement factor. The decrement factor measures the ability of materials to attenuate the peak exterior temperature to maintain a cooler internal surface.

To slow this heat transfer, the specific heat capacity and density of the insulation materials play a major role. For an equivalent thermal resistance, an assembly incorporating dense wood fibre panels or a heavy masonry layer provides greater thermal mass than lightweight synthetic foam insulation. This dynamic analysis helps carpentry and roofing contractors dimension habitable attic spaces that reduce overheating during the warmest months, alongside architectural solar shading.

The Glaser diagram: identifying condensation

Water vapour generated by indoor occupancy naturally migrates through walls towards the exterior due to the vapour pressure gradient. If this vapour encounters a cold layer where the temperature drops below the dew point, it condenses into liquid form within the construction assembly itself.

The Glaser diagram plots the temperature profile at each layer interface and compares the partial vapour pressure curve with the saturation pressure curve. As soon as the vapour pressure curve reaches or exceeds the saturation pressure, the tool flags interstitial condensation. The interface pinpoints the plane of water accumulation and calculates an indicative condensation rate for the considered period.

This visualisation allows you to verify the placement of each airtightness membrane and vapour check. The core physical principle requires that vapour diffusion resistance decreases from the warm interior towards the cold exterior. An incorrect arrangement, such as placing a vapour-tight insulation product on the cold external face of a wall without an adequate internal vapour barrier, causes moisture entrapment. Using the Glaser graph, the quantity surveyor or technician checks the hygrothermal balance of a wall before ordering construction site supplies.

The mistake that proves costly on site

On the construction site, uncontrolled moisture accumulation quickly damages insulation and timber framing. A frequent error is changing the thickness or brand of insulation during construction without checking the position of the condensation line again. Contractors are often seen replacing a semi-rigid batt with a foil-faced or vapour-impermeable panel simply because it is available sooner at the builders' merchant.

This minor change shifts the vapour barrier plane right into the middle of the insulation layer. During winter, liquid water collects drop by drop against this cold impermeable surface with no way to escape. The insulation loses its thermal performance, structural timber rots, and internal finishes show damage after two or three heating seasons.

The habit that prevents this costly issue is recalculating the Glaser profile systematically whenever an insulation product or membrane is changed on site. Two minutes spent in the browser adjusting the actual thickness and mu-value of the new product confirm that the partial pressure remains below saturation pressure at every interface.

What the free version does not do

This web browser application is entirely free and requires no prior sign-up. However, it has no persistent storage: no data is retained on a remote server. If you refresh or close your browser tab, all entered layers, thicknesses, and parameters are reset. You must export your data to CSV or print the sheet before leaving the page.

Furthermore, the free version includes no unit price, no labour cost, and no data from the ACIP database: you work solely with your own technical data. Default material values remain generic. To prepare an execution file or compliance documentation, you must refer to the technical data supplied by material manufacturers.

The model does not calculate two-dimensional or three-dimensional thermal bridges and does not handle ventilated air cavities. Physical constants from calculation standards are marked as “to be verified” in the studio. This tool provides preliminary technical sizing support and does not replace a comprehensive building energy assessment. To explore our estimating tools and project management modules, visit the Portail section or discover our module dedicated to tenders.

Moving to the ERP or Tenders module

When you need to price multiple insulation options for a call for tenders or keep a calculation log for a major construction site, a centralised management solution becomes essential. Our professional tools complement these real-time calculation modules.

By upgrading to the paid version of our ERP and Soumissions suite, you unlock capabilities tailored to your company's profitability:

  • Saving calculated walls directly within the construction site file, with revision tracking and online storage;
  • Instant loading of a saved thermal project to adjust an option requested by the client;
  • Direct pricing of work items using the ACIP price database and converting insulation layers into bill of quantities items;
  • Generating unwatermarked energy reports and technical sections branded with your company name and logo;
  • Team mode allowing site managers, quantity surveyors, and draughtspeople to collaborate on the same tender file.

To connect your facade take-offs and thermal studies to a structured financial tender, explore our full package on our Offre Pro page.

Frequently asked questions

Is my wall calculation data saved?

No. The free version runs entirely in your web browser without contacting any remote server. Nothing is stored. As soon as you close or refresh your tab, all entered details are reset. You must export your work to CSV or print the section before leaving.

Does this calculation serve as an official energy compliance document?

No. This tool is a technical decision-support aid for preliminary wall sizing prior to execution. Art Construction operates independently of SIA and testing bodies. Constants sourced from standards are marked as “to be verified”, and results do not serve as an official energy compliance document.

How are air cavities accounted for in the section?

The tool models unventilated air cavities by assigning them a tabulated thermal resistance based on their thickness and the heat flow direction. However, the calculator does not model ventilated cavities, which require a dedicated external calculation outside the weather barrier.

Where do the properties of generic materials come from?

Generic materials preloaded in the local database provide standard orders of magnitude for thermal conductivity and mu factors. To produce an accurate assessment or meet project specifications, you should replace these figures with the technical specifications from the selected manufacturers.

How does the tool compare the U-value with project requirements?

Users input their own benchmark limit value, such as a subsidy programme threshold or tender specification. The tool simply compares the two numbers and indicates whether the calculated value is below, equal to, or above the target, without issuing a statutory ruling.

How should the Glaser diagram results be interpreted?

The diagram plots temperature, vapour pressure, and saturation pressure at each interface. If vapour pressure reaches saturation pressure, interstitial condensation occurs. The tool identifies the affected interface and provides an estimated rate of condensed moisture at that location.

Does the free version include unit prices for insulation?

No. No Swiss franc amounts, labour rates, or ACIP database pricing data are included in the free version. You work exclusively with your own technical figures. Access to price databases is available in our paid ERP and Soumissions software.