Loading...
About this tool
Why use a parcel scanner before a tender or construction site
Before responding to a tender or deploying equipment on site, every trade contractor must understand the specific characteristics of the location. A misjudgement regarding access routes, topography or parcel elevation alters the organisation of the works, lifting requirements and installation rates. Using a mapping scanner makes it possible to locate the project in its immediate environment instantly.
During the tendering and planning phase, the site manager and the quantity surveyor need to check site configurations without waiting for an on-site visit. Identifying the precise boundary of a plot helps spot road right-of-ways, natural embankments and neighbouring structures. This preliminary review prevents underestimating delivery challenges for lorries or storage areas for structural work materials.
The elevation of an address is also a factor from the initial cost estimate. Weather conditions depend directly on it. Adverse weather, freezing periods and structural design loads require accurate knowledge of the ground height above sea level. Obtaining this value as soon as architectural plans are reviewed establishes clear foundations for organising the future construction site.
Online cadastral data thus provides comprehensive insight for design offices, tradespeople and general contractors. This free tool runs directly in your web browser without creating an account. It collates the public data required to prepare a realistic offer tailored to topographical conditions.
Search for a parcel: address, parcel number, EGRID or coordinates
Geo-Scanner provides access to property data via several search methods. You can start a plot search in Switzerland simply by entering a street name and house number alongside the locality. The system pinpoints the requested location and centres the aerial view on the relevant building.
For unbuilt land or newly planned development zones, a postal address is often not yet assigned. In such cases, you can enter the parcel number together with the name of the political municipality. The tool queries cadastral records to display the corresponding property boundaries.
The federal property identifier, known as the EGRID number, serves as an additional direct search key. Every plot of land in Switzerland has a unique identifier starting with the letters CH. Pasting this EGRID number into the search field targets the exact parcel without any risk of confusion between two municipalities sharing a similar name or two separate land register records.
Finally, geographic coordinates can be entered directly. The scanner supports the LV95 coordinates used on Swiss topographical plans, as well as the WGS84 coordinates standard on construction site GPS receivers. This input versatility facilitates preparation, whether you are working from a land register excerpt, a tender or an engineer's survey.
Reading the map, LV95 coordinates and elevation
The interactive map displays the area with an aerial orthophoto base layer or the Swiss national map. A cadastral overlay shows boundary lines and building footprints. You can zoom in, pan around using the mouse and inspect the highlighted plot to determine the spatial footprint of the works.
The tool simultaneously presents coordinates in both LV95 (reference framework MN95) and WGS84. A built-in conversion function switches between systems. The conversion logic has been verified against the official swisstopo conversion service to validate mathematical consistency across both geodetic projections.
The scanner indicates the exact elevation above sea level in metres for the selected point. This figure provides a baseline for technical building calculations. The viewer points out that snow and wind loads must be determined in accordance with standard SIA 261. The tool calculates neither climatic loads nor load-bearing element dimensions; these calculations remain the responsibility of the civil engineer or the specialist engineering office.
Consulting both the national map and the orthophoto makes it easy to review water bodies, visible utility lines and tree preservation constraints. You can export the LV95 coordinates and elevation into a simple CSV file carrying the Art Construction attribution to file these values within your construction site preparation records.
Ground slope profiles
Site access and earthwork logistics depend heavily on existing relief. Geo-Scanner features a function that plots the terrain's slope profile between any two points clicked on the map. This quick assessment provides factual data for site setup, excavation ramps and the selection of transport machinery.
Once the start and end points are placed on the plan, the tool calculates the total segment length, the cumulative elevation difference between both ends, and the average slope expressed in percentage and degrees. These values allow teams to evaluate the viability of a temporary access track or the cut-and-fill volumes required to level a working platform.
Interpreting this chart accurately requires an understanding of its graphic representation. The slope profile is drawn with an exaggerated vertical scale to highlight ground breaks that would otherwise appear flat on a true 1:1 section. Consequently, numeric slope values should be evaluated rather than the visual gradient alone.
The elevation data source used by the digital elevation model varies across the country. Ground measurement resolution reflects local topography and aerial survey campaigns carried out by geographical authorities. This topographical cross-section provides a reliable benchmark for early studies, but does not replace the official surveyor's plan produced for a building permit application.
Constraints: federal open data vs cantonal enquiries
Geo-Scanner can display public federal constraint layers directly over the base map, complete with their official legends. These thematic datasets highlight overhead power line corridors, noise exposure zones linked to federal transport infrastructure, and landscape inventories of national significance.
Not all spatial planning constraints are centralised at the federal level. Groundwater protection zones, local noise sensitivity levels under the Noise Abatement Ordinance (OPB, Ordonnance sur la protection contre le bruit) and detailed cantonal hazard maps are not available at federal level. The studio clearly states this and directs users to the relevant cantonal mapping portal or cadastre.
Hazard zones displayed within the tool are purely indicative. Formal zoning decisions regarding flood zones, landslides or rockfall risks fall under cantonal and communal jurisdiction. Official municipal records must be consulted before confirming crane placements, major earthworks or basement levels.
Layer availability and content depend directly on swisstopo publications and periodic data updates. For any building project, reviewing communal zoning maps and land-use regulations remains essential to confirm easements, building alignments and permissible heights.
What is sent to swisstopo, and what never leaves your computer
Protecting the data of your business and clients is a core principle of this tool. The scanner requires no registration, uses no passwords and stores no information regarding your commercial activity.
However, the technical operation of the viewer involves one specific network interaction that must be stated clearly: searched addresses, parcel numbers or EGRID identifiers, as well as coordinates clicked on the map, are transmitted to the public swisstopo API maintained by the Swiss Confederation. These queries are routed to the federal map server to return coordinates and render the relevant map tiles. None of these parameters are transmitted to Art Construction.
Nothing is recorded by the web page on your local computer or on our servers. The application retains no session history across visits, sets no advertising tracking cookies, runs no user analytics on your queries and does not require an individual API key to function.
All search queries pass directly between your web browser and the federal geodetic service. Your construction projects, layout plans and search histories remain confined to your workstation without being collected for external marketing purposes.
Limitations of the free version
This free online application provides targeted help for scouting land, yet it has distinct functional limitations. It is the only free Art Construction studio that contacts an external service—in this case, the swisstopo servers. Therefore, without an active internet connection, the tool cannot run or load background maps.
The page contains no pricing data and no rates from the ACIP database. It does not perform tender quantity take-offs or calculate prices for earthworks or structural work. To estimate site costs, separate estimation software must be used or reference made to tender items found in standardised catalogues.
The free studio does not store your profile paths. As soon as the page is closed or reloaded, the active search, slope profile and selected points are cleared. You cannot organise searches by project folder or retrieve an earlier plot assessment without re-entering the address or EGRID number.
The export option in this version consists solely of a basic CSV text file showing coordinates and elevation without graphic layout, bearing the Art Construction mark. Construction firms looking to compile complete study files can explore our estimating solutions on the tenders page to structure their pricing bids.
Upgrading to Portail or ERP
For general contractors, trade contractors and technical offices managing several construction sites at the same time, manual parcel tracking quickly reaches its limits. Integrating this data into a professional management system becomes necessary to centralise execution documents.
Upgrading to Art Construction's Portail and ERP makes it possible to save each cartographic search directly into a specific project file. You store the project location on the secure cloud, retaining revision histories as building permits evolve or site layout modifications occur.
The paid tier allows you to load an existing project at any time without entering data again. It provides the ability to price your works using the ACIP cost database linked to your work sections. Team Mode enables collaboration between the estimator, site manager and management around the same geographic reference points.
Finally, the ERP produces a printable PDF site opening sheet ready for kick-off meetings. This professional document is generated without watermarks and customised with your company branding. To view options tailored for building professionals, visit our Pro offer page.
Frequently asked questions
How do I find the EGRID number of a property in Switzerland?
The EGRID number is the unique federal identifier for a real estate property. In Geo-Scanner, you can find it by entering the postal address or the parcel number along with the municipality name. The results panel displays the official EGRID from the Swiss cadastre.
How accurate is the elevation provided by the viewer?
Elevation values come from digital terrain models published by swisstopo. They provide an exact height in metres above sea level at the chosen point. For wind and snow load calculations, assessments must follow standard SIA 261.
Why do some hazard maps not appear on the viewer?
The Swiss Confederation provides selected national indicative layers. Groundwater protection, noise sensitivity levels under the OPB and detailed hazard maps fall under cantonal jurisdiction. You must check the relevant cantonal geoportal to view these statutory datasets.
Do my parcel searches remain confidential on this tool?
Art Construction records no search queries, cookies or browsing history. The searched address or EGRID is sent exclusively to the public swisstopo API to generate the map. No information is stored on our servers.
Does Geo-Scanner work on a construction site without an internet connection?
No. Geo-Scanner is the only free Art Construction tool requiring an active network connection. Map backgrounds and cadastral data are retrieved live from federal swisstopo servers during your session.
Does the slope profile calculation replace a land survey?
No. The slope profile calculates distance, elevation difference and average gradient between two points using the available digital terrain model. It offers an order of magnitude for construction site access but cannot substitute an official plan produced by a licensed surveyor.
What are the benefits of moving to Portail and ERP?
Portail and ERP lets you save plot details inside a cloud project file, reopen existing records, calculate prices with the ACIP database, collaborate in teams and print unwatermarked PDF site opening sheets.