Free software · 100% in your browser · no data sent

Multi-layer timber-frame wall: vapour control layer, sd values and Glaser check

In a timber-frame wall, the order of the layers matters as much as their thickness: more and more vapour-open towards the outside.

Open the free studio →

Free, no account: your walls and your calculations stay in your browser.

A timber-frame wall insulates a lot for a small thickness, but it copes badly with trapped moisture. The carpenter and the engineering office must therefore check two things: the U-value, and the path of water vapour through the layers. The basic rule is well known: the tightest layer on the warm side (the vapour control layer), layers that become more and more open towards the outside (wood fibre board, breather membrane), then a ventilated air gap behind the cladding.

The Wall section studio calculates for each layer the resistance R = d/λ and the diffusion-equivalent thickness sd = μ·d, then the U-value, the total sd, the Glaser diagram with an indicative amount of condensate over the chosen period, the time lag and the decrement factor. The manufacturer's λ and μ values are entered layer by layer. The calculation is one-dimensional: it gives the plain zone between the studs. The timber studs, more conductive than the insulation, are not included and need a correction.

Worked example: timber-frame wall with vapour control layer and wood fibre board

New detached house. From inside to outside: 12.5 mm plasterboard, vapour control layer (sd = 2 m), 240 mm glass wool between studs, 60 mm wood fibre board, ventilated gap and cladding not counted. Studio winter conditions: 20 °C and 50 % inside, −5 °C and 80 % outside. Generic values, to be replaced with the manufacturer's.

Resistances and diffusion-equivalent thicknesses of the plain zone (between studs)
Layer or surfaced (mm)R (m²·K/W)sd (m)
Rsi, internal surface–0.130–
Plasterboard12.50.0500.10
Vapour control layer0.20.0012.00
Glass wool (λ 0.035)2406.8570.24
Wood fibre (λ 0.038)601.5790.12
Rse taken as still air (ventilated gap)–0.130–
Total–8.7472.46

The glass wool gives 0.240 ÷ 0.035 = 6.857 m²·K/W and the wood fibre 0.060 ÷ 0.038 = 1.579. With the surface resistances (0.13 on each side, as the gap is ventilated), Rtot = 8.747 m²·K/W and U = 1 / 8.747 = 0.114 W/(m²·K) for the plain zone. On the vapour side, the vapour control layer has an sd of 2.00 m, about 17 times more than the outer board (0.12 m): the wall opens towards the outside and the Glaser calculation shows no condensation.

A useful counter-example: without a vapour control layer and with a 15 mm OSB board on the outside (sd 0.75 m) instead of the wood fibre, the vapour pressure exceeds saturation against the OSB, at about −4 °C: condensation. The same calculation without a vapour control layer but with the very open wood fibre shows none in these conditions; the vapour control layer is still needed for airtightness, which Glaser does not check.

Plain zone: U = 0.114 W/(m²·K), with no Glaser condensation thanks to the ratio of sd values (2 m on the warm side, 0.12 m on the cold side).

3 frequent mistakes on a timber-frame wall

Closing the wall on the outside

An OSB board or a barely open membrane on the cold side, with no vapour control layer on the warm side, traps the vapour. The Glaser diagram shows it: the vapour pressure exceeds saturation against the outer board.

Quoting the U-value between studs

The plain-zone value ignores the timber studs, about three to four times more conductive than the insulation. The average U-value of the wall is therefore higher: have it corrected for the actual timber fraction.

Piercing the vapour control layer afterwards

Electrical boxes, duct passages and staples open up the vapour control layer. Moist air then passes by convection, which the Glaser calculation does not see: plan a service void in front of the layer and tape every junction.

Three-step guide for a timber frame

  1. Build the wall layer by layer
    Wall type, horizontal heat flow. Add plasterboard, vapour control layer, fibrous insulation and outer board, from inside to outside, stopping before the ventilated gap. Set Rse to 0.13.
  2. Enter the manufacturer's values
    Open the values of each layer and enter λ and μ, or the stated sd of the vapour control layer. Keep the default winter conditions or adapt them to your method.
  3. Read U, Glaser and the time lag
    Check the U-value, the Glaser tab and the summer time lag. Test a variant without a vapour control layer or with a tighter outer board, then export the CSV.

Open the free studio →

What the free version does not do for a timber frame

The calculation is one-dimensional and steady-state: it does not include studs, plates or junctions, moisture transport by convection or seasonal drying, and there is no dynamic hygrothermal simulation. The amount of condensate shown is indicative and depends on the conditions and period chosen. Generic values do not replace the manufacturer's.

With Soumissions, the wall becomes carpentry and insulation tender items, with the cost database and a file per site. The ERP tracks workshop and assembly hours, purchases and the invoicing of your company.

Frequently asked questions

What sd value should the vapour control layer have?

It depends on the build-up: the idea is to have on the warm side a layer clearly tighter than the outer layers. Enter the product's sd and check the result in the Glaser tab.

Does a humidity-variable vapour control layer change the calculation?

The Glaser calculation uses a fixed sd value. For a humidity-variable product, enter the winter value stated by the manufacturer; its behaviour in summer is not simulated.

Does wood fibre improve summer comfort?

Its high mass and specific heat increase the time lag and the damping compared with a light insulant. The studio shows both values so you can compare your variants.

Does the studio calculate the U-value including the studs?

No. It calculates the zone between studs. The average value of the wall, studs included, needs a correction for the timber fraction and the stud spacing.