A heated floor laid on the ground is treated differently from a slab above a cellar. Under the raft, you need an insulant that carries the load and tolerates soil moisture: high compressive strength extruded polystyrene (XPS) or cellular glass. Under the screed, a thinner layer (EPS, screed insulation) is often added, which also takes the ducts. Putting everything under the screed eats headroom; putting everything under the raft has to be decided before the concrete is poured.
The Wall section studio calculates the slab with downward heat flow (Rsi = 0.17): U-value, resistances, temperature profile and comparison with the limit value, with the MoPEC 2025 presets for an element buried less or more than 2 m deep. It does not model the ground: the soil resistance is not counted (Rse set to 0), which is on the safe side. For the slab above an unheated cellar, see the Insulation studio page; for the junction of the external wall on the slab, see the 2D thermal bridge studio page on the wall base.
Worked example: 250 mm raft, insulation under the raft and under the screed
New detached house on a 250 mm reinforced concrete raft, heated floor at 20 °C, ground taken at 8 °C for the temperature profile (example value). 80 mm cement screed on 30 mm EPS, XPS under the raft (λ 0.035). Ground resistance not counted. Comparison with a variant without XPS, all the insulation under the screed. Generic values, to be replaced with the products'.
| Variant | EPS under screed (mm) | XPS under raft (mm) | U (W/(m²·K)) |
|---|---|---|---|
| Split insulation | 30 | 140 | 0.194 |
| Split insulation | 30 | 160 | 0.174 |
| Split insulation | 30 | 180 | 0.158 |
| All under the screed | 140 | 0 | 0.237 |
Variant with 30 + 180 mm: Rtot = 0.17 + 0.057 (screed 0.080 ÷ 1.4) + 0.833 (EPS 0.030 ÷ 0.036) + 0.109 (raft 0.250 ÷ 2.3) + 5.143 (XPS 0.180 ÷ 0.035) + 0 = 6.312 m²·K/W, so U = 0.158 W/(m²·K). With 140 mm of XPS, Rtot = 5.169 and U = 0.194; with 160 mm, U = 0.174. The 0.17 threshold of the « buried less than 2 m » preset therefore needs 180 mm in this example, whereas the 0.25 threshold « more than 2 m » would already be met with 140 mm.
Putting everything under the screed (140 mm of EPS) gives Rtot = 4.225 and U = 0.237: worse, because the raft stays cold, and 110 mm more height than the split solution. With the insulation under the raft, the concrete mass stays on the warm side (about 18 °C in the temperature profile), which stabilises the heated floor.
30 mm under the screed and 180 mm of XPS under the raft: U = 0.158 W/(m²·K), without losing height above the raft.
3 frequent mistakes on an insulated raft
Choosing the wrong preset
The limit value differs depending on how deep the element sits in the ground. Check which limit applies to your floor in the cantonal text and choose the matching preset, or enter the value.
An unsuitable under-raft insulant
Under the raft, the insulation carries the building and stays in the soil moisture. Its compressive strength and its approval for this use are checked with the structural engineer and the manufacturer; the studio only checks the thermal side.
Discovering the height too late
Insulation entirely under the screed shifts the finished floor level, the thresholds and the sill heights. Fix how the insulation is split before the raft is poured.
Three-step guide for a floor against the ground
- Choose slab and downward heat flow
Slab type: Rsi = 0.17. Set Rse to 0 so the ground is not counted, then adapt the outside temperature if you want a realistic profile. - Enter screed, insulation and raft
From inside towards the ground: screed, screed insulation, raft, under-raft insulation. Enter λ of the chosen products. - Compare with the right limit
Choose the MoPEC preset according to depth, vary the XPS thickness and print the results sheet.
What the free version does not do for a floor against the ground
The studio does not calculate losses through the ground with a geometric method (perimeter, depth, soil type) nor the vertical perimeter insulation of the plinth. It checks neither the bearing capacity of the insulation nor the waterproofing against ground water. The junction with the façade walls belongs to the thermal bridge studio.
With Soumissions, the build-up becomes structural work and insulation tender items, with the cost database and a file per site. The ERP tracks the hours, purchases and invoicing.
Frequently asked questions
Is it better to insulate under the raft or under the screed?
Under the raft, the insulation also protects the concrete and takes no headroom; under the screed, it can be laid later. A split solution, as in the example, is common.
Why set Rse to 0 against the ground?
Because the element touches the soil, not air. The studio does not count the ground resistance: the U-value obtained is on the safe side compared with a calculation including the soil.
Cellular glass or XPS under the raft?
Both exist for this use. Their λ, compressive strength and behaviour in water differ: enter the product's values and have the bearing capacity validated.
Does the studio check condensation in the floor?
It draws a Glaser diagram with the conditions entered, but the real ground is not modelled. For a floor against the ground, interpret this result with caution.