Free software · 100% in your browser · no data sent

Sarking roof: continuous insulation over the rafters, U-value, summer time lag and airtightness

Sarking places the insulation above the rafters, without interruption: the rafters stay visible and the insulating layer is no longer cut every 70 cm.

Open the free studio →

Free, no account: your walls and your calculations stay in your browser.

In a sarking roof, boarding or panelling is laid on the rafters, then the airtight layer, then continuous rigid insulation boards (dense wood fibre, PIR or PUR), a roofing underlay, the counter-battens and the roof covering. The rafters remain exposed in the attic and the insulation is not interrupted by the timber, unlike the between-rafter insulation covered on another page of the Insulation studio.

The Wall section studio calculates the roof with upward heat flow: U-value, total resistance, surface mass, time lag and decrement factor (EN ISO 13786 method, 24 h period), total sd and Glaser diagram. The roof covering and the ventilated gap under the tiles are not counted: the wall stops at the underlay and a still-air external resistance is taken. The time lag is read in the studio for each variant; it depends on the mass, the specific heat and the conductivity of the insulation, which you enter from the product data sheet.

Worked example: wood fibre or PIR sarking for U ≤ 0.17 W/(m²·K)

Renovation of the pitched roof of a detached house, exposed rafters kept. Layers counted from inside to outside: 27 mm timber boarding, vapour control layer (sd 2 m), over-rafter insulation, vapour-open roofing underlay. Rsi = 0.10; Rse = 0.10 (still air under the ventilated covering). Rigid wood fibre values: λ 0.040, density 140 kg/m³ (example values from a manufacturer).

U-value, insulation mass and Glaser check of the sarking variants
VariantThickness (mm)U (W/(m²·K))Insulation mass (kg/m²)Condensation according to Glaser
Generic flexible wood fibre (λ 0.038)2200.16112.1no
Rigid wood fibre (λ 0.040)2200.16930.8no
PIR (λ 0.025)1400.1664.5no
PIR (λ 0.025), thicker1600.1475.1no

For the rigid wood fibre: R = 0.220 ÷ 0.040 = 5.500 m²·K/W. With the boarding (0.027 ÷ 0.13 = 0.208), the vapour control layer and the underlay (about 0.001 and 0.002) and the two 0.10 resistances, Rtot = 5.910 and U = 1 / 5.910 = 0.169 W/(m²·K). PIR reaches 0.166 with only 140 mm (R = 5.600, Rtot = 6.010). The insulation mass equals thickness × density: 0.220 × 140 = 30.8 kg/m² for the rigid fibre, 0.140 × 32 = 4.5 kg/m² for the PIR. With 160 mm of PIR, R = 6.400, Rtot = 6.810 and U = 0.147.

For a similar U-value, the rigid wood fibre puts almost seven times more mass above the attic than the PIR: the studio shows a longer time lag and stronger damping for it, which delays and softens the midday heat in the rooms under the roof. Under the studio's winter conditions, no variant shows condensation: the vapour control layer on the warm side (sd 3.1 m with the boarding) stays tighter than the wood fibre and the underlay.

220 mm of rigid wood fibre or 140 mm of PIR give about 0.17 W/(m²·K); the wood fibre also adds mass for summer comfort.

3 frequent mistakes on a sarking roof

Judging summer comfort by the U-value

Two roofs with the same U can behave very differently in summer. Compare the time lag and damping shown by the studio, and add solar protection for the roof windows, which the wall calculation does not see.

Neglecting airtightness

The Glaser calculation does not see the air passing through joints. Without a continuous airtight layer on the boarding, sealed to the walls and penetrations, moisture enters by convection and the U-value loses its meaning.

Counting the roof covering

Tiles, battens and the ventilated gap do not count in the U-value. Stop the wall at the underlay and set the external resistance as for still air.

Three-step guide for sarking

  1. Choose roof and enter the layers
    Roof type, upward heat flow. Add timber boarding, vapour control layer, insulation, open underlay. Set Rse to 0.10, like Rsi.
  2. Enter the board's values
    Replace the insulation's λ, density, specific heat and μ with the manufacturer's values: they drive both the U-value and the time lag.
  3. Compare U, time lag and Glaser
    Compare the variants, check the Glaser tab and choose the project's limit value. Print the results sheet for the client.

Open the free studio →

What the free version does not do for a sarking roof

The studio calculates a homogeneous layer build-up: it counts neither the fixing screws that pass through the insulation, nor the junctions at verge, ridge and eaves, nor solar radiation, ventilation or internal gains for summer comfort. It does not replace an overheating study of the attic.

With Soumissions, the build-up becomes roofing and insulation tender items, with the cost database and a file per site. The ERP then tracks the hours, purchases and invoicing.

Frequently asked questions

Sarking or between-rafter insulation: what difference for the calculation?

With sarking, the insulation is continuous: the studio's U-value describes the roof well. Between rafters, the timber cuts the insulation every 60 to 80 cm and the real value is worse than that of the plain zone.

What is the time lag of a roof?

It is the delay, in hours, between the heat peak outside and the peak of heat flow reaching inside. A long time lag pushes this peak towards the night, when you can ventilate.

Is PIR worse in summer?

For the same U-value it is lighter: its time lag is shorter. The studio shows the difference with your values; shading of the roof windows also matters a great deal.

Is a vapour control layer needed with sarking?

An airtight layer is needed anyway. Its sd is chosen according to the insulation and the underlay: check the result in the Glaser tab.