Free software · 100% in your browser · no data sent

Shear key under an L-shaped retaining wall: dealing with sliding

When sliding exceeds 100 % while overturning passes, a small key under the footing changes the result: the studio shows by how much, and why drainage matters even more.

Open the free studio →

Free, no account: an indicative preliminary design, which does not replace the calculation note signed by an engineer.

An L-shaped retaining wall must resist three things: overturning about the downhill toe, the bearing capacity of the ground under the footing and the horizontal sliding of the whole wall under the earth pressure. Sliding is often the decisive check for a short, wide wall, especially with a surcharge uphill: friction under the footing is no longer enough. Two remedies are available: widening the footing to load more soil on the heel, or casting a shear key, a concrete rib under the footing that mobilises the passive resistance of the ground downhill.

The Excavations, slopes and retaining walls studio checks an L-shaped wall following the logic of SIA 267: Rankine active pressure, partial factors from the specification, overturning, sliding, eccentricity and bearing capacity. The Shear key under the footing tick box and the Key height field add the passive resistance of the ground in front of the key, counted at half for caution, and deduct the frozen layer if the foundation is not protected against frost. When sliding exceeds 100 % without a key, the studio proposes one. It is an indicative preliminary design that does not replace the signed calculation of a civil engineer.

Worked example: 2.50 m L-shaped wall with a 10 kN/m² surcharge, without then with a key

Wall 2.50 m high in total, stem and footing 0.25 m thick, downhill toe of 0.30 m, uphill heel of 0.80 m (footing of 1.35 m), level ground uphill in sandy gravel (γ = 21 kN/m³, φ′ = 35°), surcharge of 10 kN/m², working drainage. Foundation ground: compact moraine (γ = 22 kN/m³, φ′ = 33°), downhill embedment of 0.80 m, foundation not protected against frost. Starting values of the studio.

Sliding per metre of wall (kN/m, design values of the studio)
VariantHorizontal force H_EdSliding resistanceUtilisation
No key, drainage working41.5932.63127 %
0.30 m key41.5951.2081 %
0.50 m key41.5959.4570 %
No key, no drainage83.7732.63257 %

The design friction angle is arctan(tan 35° ÷ 1.2) = 30.26°, hence Ka = tan²(45° − 15.13°) = 0.330. Earth pressure: 0.5 × 21 × 2.50² × 0.330 = 21.64 kN/m; surcharge pressure: 10 × 2.50 × 0.330 = 8.25 kN/m; design force H_Ed = 1.35 × 21.64 + 1.5 × 8.25 = 41.59 kN/m. Favourable vertical loads: stem 25 × 0.25 × 2.25 = 14.06, footing 25 × 1.35 × 0.25 = 8.44, soil on the heel 21 × 0.80 × 2.25 = 37.80, giving 60.30 kN/m. Under the footing, tan φ′d = tan 33° ÷ 1.2 = 0.541: resistance 60.30 × 0.541 = 32.63 kN/m, utilisation 41.59 ÷ 32.63 = 127 %.

With a 0.30 × 0.30 m key, the weight rises to 62.55 kN/m (32.63 becomes 33.85 kN/m of friction). The passive resistance acts over 0.80 + 0.30 = 1.10 m, less 0.30 m of frozen ground: Kp = tan²(45° + 14.21°) = 2.817, passive force = 0.5 × 0.5 × 22 × 2.817 × (1.10² − 0.30²) = 17.35 kN/m. Total resistance 51.20 kN/m, utilisation 81 %. Without drainage, a water pressure of 0.5 × 10 × 2.50² = 31.25 kN/m is added: H_Ed = 1.35 × (21.64 + 31.25) + 1.5 × 8.25 = 83.77 kN/m, utilisation 257 %.

A 0.30 m key brings sliding down from 127 % to 81 %; a clogged drain would push it up to 257 %, which no reasonable key can make up for.

3 common mistakes with a shear key

Counting passive resistance in disturbed or frozen ground

The passive resistance in front of the key only exists if the downhill ground stays in place, compact and unfrozen. A pipe trench dug later in front of the wall, or downhill ground backfilled without compaction, removes the effect of the key on site while it is still counted in the calculation.

Replacing the drainage with a key

The calculation shows that a full water pressure doubles the horizontal force. The key corrects moderate sliding, not a wall without a drain: the toe drain, the drainage layer and the outlet remain the first measure.

Casting the key against a poorly prepared bottom

A key cast in a muddy slot or against a loosened bottom bears on nothing. It is cast against undisturbed ground, with a clean bottom, and reinforced with the footing according to the engineer's drawings.

How to use it in 3 steps

  1. Describe the wall and the ground
    Choose the L-shaped retaining wall (SIA 267) mode, enter the height, thicknesses, toe and heel, the uphill surcharge, the retained ground and the foundation ground, the downhill embedment and the state of the drainage.
  2. Read the sliding, then add the key
    If sliding exceeds 100 %, tick Shear key under the footing and try several key heights; compare with a longer heel or the button that sizes the footing automatically.
  3. Check all the results
    Check that overturning, eccentricity and bearing capacity stay below 100 % and that the drainage is declared as working, then print the sheet for the civil engineer who will draw up the construction calculation.

Open the free studio →

What the free version does not do for the key and sliding

The studio is a preliminary design: it ignores the passive resistance of the downhill ground except half of that of the key, does not count the soil on the toe, models neither the uplift under the footing nor buoyant weight, and checks only simple bending of the reinforcement. The ground values are starting values. Beyond 4 m of height, it asks for a soil investigation and a signed calculation; in all cases, building a load-bearing wall requires the signed calculation of a civil engineer.

Soumissions takes the concrete, formwork, reinforcement and earthworks into the items of the tender; the ERP tracks the site and invoicing; the Portail chantier files the sheet, the drawings and the engineer's calculation with the site file.

Frequently asked questions

What is a shear key under a retaining wall for?

It extends below the footing and bears against the downhill ground: the passive resistance of this ground is added to the friction under the footing and increases the sliding resistance.

Why does the studio count only half of the passive resistance?

Full passive resistance requires a large movement of the wall, incompatible with a structure in service. The studio retains half of the passive resistance of the key for caution, and none from the rest of the downhill ground.

What does frost protection change?

If the foundation is not protected, the studio deducts 0.30 m of frost-affected ground from the embedment: the passive resistance only starts below it. A protected foundation keeps the full height.

Should you prefer a key or a wider footing?

A longer footing on the uphill side loads more soil and also helps against overturning and for bearing; a key is more economical for sliding alone. The studio lets you compare both, and the final choice rests with the engineer.