Loading...
About this tool
From soil to footing: data that shapes the wall
To size a reinforced concrete L-shaped retaining wall, everything starts with the characteristics of the retained soil and the foundation soil. The studio offers a complete example featuring a 2.40 m high wall retaining sandy gravel from the Swiss Plateau, subjected to a uniform garden surcharge. You can modify the height, stem geometry, footing dimensions and soil type.
Six typical Swiss soil types are available with modifiable default values: sandy gravel, dense moraine, weathered or marly molasse, sound sandstone molasse or compact limestone, clayey silt or soft lacustrine deposit, and heterogeneous old urban fill. For each of these soils, the studio integrates a unit weight, a friction angle, cohesion, a bulking factor and an indicative disposal pathway. These notebook parameters are not official. A site-specific geotechnical report must replace them on your actual construction sites.
The presence of water behind the stem radically alters the forces. The studio integrates a direct comparison with and without rear drainage. Without a functional drain, the hydrostatic pressure of the water adds to the earth pressure, which doubles or triples the overturning moment. For narrow plots, the studio also allows you to model a property-line wall by zeroing out the toe, placing the entire footing beneath the upstream backfill.
Earth pressure, overturning and sliding: the first two checks
Stability calculations begin by evaluating the actions exerted by the ground. The studio applies Rankine's method on a fictitious vertical plane passing through the rear edge of the heel, incorporating the upstream slope and surface surcharges. The verification table also displays, for comparison purposes, Coulomb's earth pressure coefficient.
Two fundamental checks are carried out at limit states:
- Overturning safety: the studio calculates the stabilizing moment provided by the self-weight of the concrete and the weight of the soil prism resting on the heel, against the overturning moment generated by active pressure and potential water pressure.
- Sliding safety: the overall horizontal force is compared to the frictional resistance beneath the footing, with or without the contribution of a shear key.
To qualify these checks, the tool compares the stress ratio to 100% of the allowable design value. It indicates whether the result is lower than or equal to, or greater than this limit. The calculation assumptions take zero forced cohesion on the pressure side, ignore passive earth pressure on the downstream side (except half that of the shear key), do not count any soil weight on the toe, and model neither uplift pressure nor submerged weight in the absence of a drain.
Eccentricity and bearing capacity: the resultant within the middle third
External stability does not stop at sliding. The load transmitted to the foundation soil must remain admissible to avoid any differential settlement or tilting of the structure. The studio evaluates the position of the force resultant at the base of the footing. At the serviceability limit state (SLS), the resultant must lie within the middle third to prevent any uplift of the toe or tension under the concrete.
The studio then checks the contact stress using Meyerhof's approach, which defines an effective compressed footing width by deducting twice the load eccentricity. This design stress is compared to the allowable bearing capacity of the selected foundation soil. If the footing is too narrow or the heel too short, eccentricity increases, the soil stress exceeds 100% of the allowable value, and the studio displays an excess.
On site, poor drainage is a classic cause of distress. The absence of weep holes, a crushed agricultural drain, or missing protective geotextile clogs the back of the structure. Water pressure accumulates, increases eccentricity, and overloads the front edge of the footing. The cross-section diagram generated by the studio plots the stress distribution under the footing and shows the position of the drainage systems.
Stem and footing reinforcement: bars and minimum cross-section
Once overall equilibrium is verified, the studio addresses the internal sizing of the reinforced concrete, based on C30/37 concrete and B500B steel bars:
- Stem fixity: calculation of the maximum bending moment at the junction between the vertical stem and the footing, determination of the required tensile reinforcement area and check against the minimum steel area.
- Reinforcement layout: proposal of bar diameters and regular spacing for vertical layers on the soil side.
- Footing reinforcement: indicative calculation of bending moments for the front toe subjected to soil reactions and for the rear heel supporting the backfill, with a proposal for longitudinal bars.
This calculation is limited to simple bending of the stem and footing. It does not check shear, cracking, anchorage lengths, distribution reinforcement, or expansion joints. These additional checks are the responsibility of the project engineer when preparing execution plans.
Automatic sizing of the L-shaped footing and its limits
To simplify geometric adjustment, the « Automatically size the L-shaped footing » button searches for the most concrete-efficient configuration where all stress ratios remain below 95%. The algorithm varies the total footing width, toe length, and concrete thicknesses until it finds equilibrium without unnecessary material.
The tool also generates the quantitative bill of quantities without prices: lean concrete, formwork for the footing and both faces of the stem, structural concrete volume, weight of reinforcing steel, rear drainage, and protection layer. The studio runs 100% in the browser: nothing is sent or saved on a server, and no memory is retained. Closing or reloading the tab erases the data. Printed sheets carry an Art Construction watermark and CSV exports mention the free version.
To save a study in a construction site folder, reuse variants, or price the bill of quantities items with the ACIP cantonal database, these steps are performed server-side in our tenders module or our ERP solution for construction companies. Centralized folder access is managed directly via the company portal.
Contractor liability and engineer's note
The studio provides decision support for preliminary sizing. It never replaces soil investigations on the plot, nor static calculations established by specialists. The liability of the contractor and the site management remains fully engaged in the execution of the work.
A geotechnical investigation and a calculation note signed by a civil engineer or geotechnical engineer in accordance with SIA 267 standard are required for final execution, as well as in the following situations:
- Height of slope or structure exceeding 4 m.
- Presence of a groundwater table or underground water seepage.
- Unstable slope.
- Presence of a neighboring building within the zone of influence.
Preliminary excavation work must comply with the Construction Work Ordinance. This stipulates that beyond 1.50 m in depth, an unsupported or unshielded wall must be sloped or secured by other measures. The slope must be adapted to the ground, and the edge of the excavation must maintain a clear space of at least 1 m along a sloped wall and at least 50 cm along a shored wall. The ordinance requires a justification signed by a specialized engineer or geotechnical engineer, notably beyond 4 m in height, or in the event of loads or water seepage. Excavation materials are sorted on the construction site and valorized in accordance with the Ordinance on Waste. The client specifies the pathways as soon as the volume likely exceeds 200 m³.
Frequently asked questions
How does automatic footing sizing work?
The studio searches for the most concrete-efficient footing by adjusting the foundation width and the distribution between toe and heel. It stops as soon as the stress ratios for overturning, sliding, and soil bearing capacity are all less than or equal to 95% of the design value.
Why does rear drainage change the results so much?
In the absence of functional drainage, the hydrostatic pressure of water adds to the earth pressure. This water pressure doubles or triples the overturning moment and greatly increases eccentricity under the footing, making it necessary to widen the concrete foundation to prevent tipping.
What reinforcement checks are carried out by the studio?
The studio calculates the stem fixity moment and indicative moments in the footing under simple bending. It compares the calculated steel area to the minimum reinforcement and suggests B500B bars with spacing. It does not check shear or cracking.
Can a wall located right on the property line be calculated?
Yes. You can set the width of the front toe to zero in the geometric parameters. The footing then develops entirely backwards, under the upstream backfill. The studio immediately adapts the calculations for overturning, sliding, and soil stresses.
What are the excavation rules for the wall?
According to the ordinance text, beyond 1.50 m in depth, any unsupported or unshielded wall must be sloped or secured by other measures. The free edge must reach at least 1 m for a slope and 50 cm for a shored wall, with engineer justification beyond 4 m.
Are my calculations and entered data saved online?
No. The free version runs 100% in the browser: nothing is sent or saved on a server. Reloading or closing the tab erases everything. Saving projects and pricing with ACIP rates requires the Pro version.
Is the studio's calculation note sufficient to open the construction site?
No. The studio offers indicative preliminary sizing based on starting values. The execution of a retaining structure requires a calculation note prepared by a civil engineer in accordance with SIA 267 standard, as well as an on-site soil investigation.