Load at the top of an excavation, rain and thaw: when the slope gradient must come down

A slope that holds in dry weather can slide after a night of rain or under the wheel of a truck: the studio shows the gradient to retain and what it costs in volume.

Open the free studio →

Free, no account: an indicative preliminary design, which does not replace the calculation note signed by an engineer.

On an open excavation, the slope gradient is chosen on the first day, then the site changes around it: a truck comes to load at the top, an excavator works at the edge, it rains for three days or the ground thaws. Each of these events reduces the margin of the slope. The Construction Work Ordinance (OTConst; BauAV in German) requires an excavation deeper than 1.50 m to be sloped, shored or otherwise secured, and a proof of slope safety to be drawn up by a specialist engineer or a geotechnical engineer in the more exposed cases, notably beyond 4 m of height or when groundwater is involved.

The Excavations, slopes and retaining walls studio handles these situations with two tick boxes in the Excavation and 3D cubature mode: Rain, water inflow or thaw, and Truck, excavator or road at the top. The first lowers the maximum starting gradient by one class; the second keeps a clear strip at the top and triggers the warning asking for a signed proof. The studio recalculates the true excavated volume with the chosen slope, the topsoil, the volume to remove and the truck trips.

Worked example: a 3 m house excavation, dry weather then rain and a truck at the top

Raft of 12.00 m by 10.00 m, total depth 3.00 m including 0.25 m of stripped topsoil, clear working width of 0.60 m on each side. Ground: clean, well-graded sandy gravel, classed as moderately resistant, material reused as backfill. Starting values of the studio, not official, to be confirmed by a geotechnical report.

Same excavation, two site conditions (studio values, volumes in m³)
QuantityDry weather, clear topRain or thaw, truck at the topDifference
Maximum starting gradient63.4° (2:1)45.0° (1:1)−18.4°
Setback of the slope at the top1.38 m2.75 m+1.37 m
Excavation below the topsoil505.75618.81+113.06
Topsoil stripping71.5896.77+25.19
True excavated volume577.33715.59+138.26
Clear strip at the top1.00 m1.00 mnone

Below the topsoil, the slope height is 3.00 − 0.25 = 2.75 m. The bottom of the excavation measures 12.00 + 2 × 0.60 = 13.20 m by 10.00 + 2 × 0.60 = 11.20 m. With a 2:1 gradient, the slope sets back by 2.75 ÷ 2 = 1.375 m: the top measures 15.95 m by 13.95 m. The studio applies the prismoid formula: V = 2.75 ÷ 6 × (13.20 × 11.20 + 15.95 × 13.95 + 4 × 14.575 × 12.575) = 505.75 m³. The stripping is (15.95 + 2) × (13.95 + 2) × 0.25 = 71.58 m³.

With rain, the gradient drops to 1:1 and the setback doubles to 2.75 m: the top measures 18.70 m by 16.70 m, and V = 2.75 ÷ 6 × (147.84 + 312.29 + 4 × 15.95 × 13.95) = 618.81 m³. The volume to remove here stays at 12.00 × 10.00 × 2.75 = 330 m³, because the gravel is reused as backfill: what increases are the 113 m³ extra to dig and put back, and the space taken at the top of the excavation.

Rain or a truck at the top: the gradient goes from 63.4° to 45° and the true excavated volume from 577 to 716 m³ (+24 %), with a 1.00 m strip to keep clear.

3 common mistakes on a loaded or wet slope

Keeping the dry-weather gradient after rain

The slope held all summer at 63°, so it is kept. After three days of rain or at thaw, the same ground loses part of its strength: that is when collapses happen. Inspect the slope after each spell of rain and lower the gradient or shore it before going back down into the excavation.

Storing soil and driving trucks along the edge

The heap of spoil set 50 cm from the edge and the truck that reverses up to the top add a load exactly where the slope is most stressed. Keep the clear strip at the top, mark it out and place stockpiles further away; if traffic along the edge cannot be avoided, have the slope verified with this load.

Forgetting the safety proof when conditions change

The slope did not need a proof at the start, then a 20 t excavator comes to work at the top or water appears at the toe. These changes put the excavation among the cases where a specialist engineer or a geotechnical engineer must certify the slope safety before work continues.

How to use it in 3 steps

  1. Describe the excavation and the ground
    Choose the Excavation and 3D cubature mode, enter the length and width of the raft, the total depth, the topsoil and the clear working width, then the Swiss ground type closest to your borehole.
  2. Tick what happens at the top and in the ground
    Tick Rain, water inflow or thaw, and Truck, excavator or road at the top, if applicable. The studio lowers the maximum starting gradient, shows the clear strip at the top and signals when a signed proof becomes necessary.
  3. Compare the volumes and organise the site
    Read the true excavated volume, the volume to remove and the truck trips, then compare with the dry variant. Print the sheet or export the CSV for the site file and for the discussion with the geotechnical engineer.

Open the free studio →

What the free version does not do for a loaded slope

This is an indicative preliminary design: the studio does not calculate slope stability. It applies starting gradients per ground class (1:1, 2:1, 3:1) and lowers them by one class in case of water, a rule specific to the studio. It does not quantify the effect of a load at the top on the slope, does not handle groundwater and does not replace the signed safety proof, the geotechnical study or a calculation by a civil engineer. For the thrust of a surcharge on a wall, see the page on earth pressure and road surcharge.

With Soumissions, the earthworks volumes go into the items of a tender; with the ERP, you track hours, plant hire and invoicing; the Portail chantier files the calculation sheet and the signed proof with the site file.

Frequently asked questions

From what depth must an excavation be sloped or shored?

Under the OTConst, beyond 1.50 m of depth an excavation must be sloped, shored or secured by other measures. The studio shows this as soon as the depth exceeds that threshold.

Why does rain change the admissible gradient?

Water reduces the strength of the ground and adds pore pressure; thaw has the same effect. The studio therefore lowers the starting gradient by one class, for example from 2:1 to 1:1 for a gravel.

What width should stay clear at the top of an excavation?

The studio proposes 1.00 m at the top of a slope, and 0.50 m along a shoring, raised to 1.00 m under load. These are starting values: the applicable rule is that of the OTConst and of your safety concept.

When is a proof of slope safety required?

Notably beyond 4 m of slope height and when groundwater is involved; the studio also asks for it in case of a load at the top or water inflow. Suva provides a form to be signed by a specialist engineer or a geotechnical engineer.