Free software · 100% in your browser · no data sent

Underfloor heating at 35 °C or radiators at 55 °C: what the flow temperature changes for the heat pump

The temperature of the water sent to the emitters sets the unit's useful output, its seasonal efficiency and sometimes its size: the studio shows it in one click.

Open the free studio →

Free, no account: your data stays in your browser. Indicative results, to be confirmed by the installer.

In a renovation, people often talk about the heat pump's output and the noise at the neighbour's, much less about the emitters. Yet the same unit does not deliver the same output or efficiency depending on whether it heats the water to 35 °C for underfloor heating or to 55 °C for radiators. The hotter the water has to be, the harder the unit works for every kilowatt-hour delivered.

The heat pump, noise and solar studio has a 'Heat emitters' setting with two choices: underfloor heating (35 °C flow) or radiators (55 °C flow). For each unit template it then reads the output and SCOP matching that temperature, keeps the smallest template that covers the demand and calculates the annual electricity. The demand method (current consumption or floor area) is explained on the page about sizing a heat pump to replace a boiler; here the demand stays fixed and only the emitter changes.

Worked example: one house, two flow temperatures

Family house in the lowlands, non-condensing oil boiler, an average of 2,000 litres of heating oil a year, hot water produced by the future heat pump, design temperature of −8 °C. Studio starting values (efficiency 0.85, 10 kWh per litre, 2,300 equivalent hours with hot water), to be checked by the installer.

Same demand, two emitters: unit selected by the studio (generic outdoor air/water templates)
QuantityUnderfloor 35 °CRadiators 55 °CDifference
Required output at −7 °C7.13 kW7.13 kWnone
Template selected8 kW (7.8 kW at 35 °C)10 kW (8.8 kW at 55 °C)one template up
Demand coverage109%123%+14 points
SCOP4.753.50−1.25
Electricity per year3,579 kWh4,857 kWh+1,278 kWh (+36%)
Night LWA of the unit49 dB(A)51 dB(A)+2 dB

Useful heat: 2,000 litres × 10 kWh × 0.85 = 17,000 kWh a year. Average output: 17,000 ÷ 2,300 h = 7.39 kW. The studio converts this output to −7 °C, the point where the unit is checked: 7.39 × (20 − (−7)) ÷ (20 − (−8)) = 7.39 × 27 ÷ 28 = 7.13 kW. At 35 °C, the 8 kW template delivers 7.8 kW: enough (coverage 7.8 ÷ 7.13 = 109%). At 55 °C, the same template delivers only 7.1 kW, below the 7.13 kW required: the studio moves up to the 10 kW template, which delivers 8.8 kW (123%).

Electricity: useful heat ÷ SCOP. 17,000 ÷ 4.75 = 3,579 kWh with underfloor heating, 17,000 ÷ 3.50 = 4,857 kWh with radiators, i.e. 1,278 kWh more every year (+35.7%). The larger unit is also louder: 51 instead of 49 dB(A) night sound power level, to be carried over into the noise assessment.

For the same demand, moving from 35 °C to 55 °C raises the unit by one template, lowers the SCOP from 4.75 to 3.50 and adds about 36% more electricity a year in this example.

3 common mistakes with heat pump emitters

Keeping the radiators without checking their output at low temperature

A radiator sized for a boiler at 70 °C gives noticeably less heat at 55 °C. If the room no longer reaches its temperature, the setpoint goes up and the SCOP drops further. The installer must check the output of the radiators room by room at the new flow temperature.

Choosing the unit by its 35 °C output when the house has radiators

Manufacturers' data sheets often show the output at 35 °C, the most flattering one. In the studio, the 'Radiators (55 °C flow)' choice makes it read the output at 55 °C: that is the output which must cover the required output, otherwise the unit falls short in very cold weather.

Forgetting that the size of the unit also changes the noise

A larger template has a higher sound power level. Changing the emitter or the flow temperature can therefore change the result of the noise assessment: redo the noise calculation at the neighbour's after any change of unit.

Compare the two emitters in the studio in 3 steps

  1. Enter the demand once
    Enter the consumption of oil, gas or electricity (or the floor area and the state of the envelope), hot water and the location. The demand and the required output stay the same for both runs.
  2. Choose the emitter
    In 'Heat emitters', choose 'Underfloor heating (35 °C flow)' and note the template, coverage, SCOP and electricity per year. Then switch to 'Radiators (55 °C flow)' and note the same values.
  3. Compare and carry over
    Compare the two columns and the noise tab: sound power level and rating level at the neighbour's. Print the sheet or export the quantities for the installer.

Open the free studio →

What the studio does not do for emitters

The studio does not size the radiators or the underfloor heating, does not calculate flow rates or hydraulic balancing, and knows only two flow temperatures. The unit templates and SCOP values are generic starting values: the data sheet of the chosen manufacturer is authoritative, and the installer remains responsible for the sizing.

To cost the replacement, Soumissions takes over the quantities and items; the ERP tracks the installation, hours and invoicing; the Portail chantier keeps the data sheets and the noise assessment with the client's file.

Frequently asked questions

Can the radiators be kept with a heat pump?

Often yes, if their output is sufficient at the chosen flow temperature. The studio shows the effect of 55 °C on the unit and the electricity; checking the radiators room by room remains the installer's job.

Why does the studio change the unit when I switch to 55 °C?

Because it reads the template's output at 55 °C. If that output no longer covers the required output at −7 °C, it selects the next template, the smallest one that is sufficient.

Is the SCOP shown the one of my unit?

No, it is a generic value of the template. You can enter the output and SCOP from the manufacturer's data sheet by choosing the 'Free entry' model.

Do I need underfloor heating to install a heat pump?

Not necessarily. The example shows that a lower temperature costs less electricity; lowering the temperature of the existing radiators, where they allow it, goes in the same direction without heavy works.