An air/water heat pump can be installed outside, as a single block, or inside, in a basement or plant room, with the air drawn in and discharged through ducts that often end in light wells. This choice changes the noise level at the neighbour's, the space to be reserved in the building and the associated works.
The heat pump, noise and solar studio offers both types: 'Outdoor air/water heat pump (monobloc)' and 'Indoor air/water heat pump (ducted, light well)', each with its own templates (output, SCOP, sound power level, dimensions and weight). For an indoor unit, the noise radar offers the 'light well' measure instead of the enclosure. The detailed effects of enclosures, light wells and silent mode are covered on the dedicated page; here the two types are compared for the same demand.
Worked example: a house at altitude, two types of unit
House at about 950 m altitude, condensing oil boiler, 2,500 litres a year, hot water produced separately, underfloor heating at 35 °C, design temperature of −10 °C. Exhaust outlet or unit in front of the facade, neighbouring window at 10 m. Generic studio templates, to be replaced by the manufacturer's data sheet.
| Quantity | Outdoor monobloc | Indoor ducted | Difference |
|---|---|---|---|
| Output at 35 °C | 9.7 kW (108%) | 9.8 kW (109%) | equivalent |
| SCOP at 35 °C | 4.70 | 4.45 | −0.25 |
| Electricity per year | 4,894 kWh | 5,169 kWh | +275 kWh |
| Night LWA | 51 dB(A) | 46 dB(A) | −5 dB |
| Night Lr at 10 m (facade) | 38.0 dB(A) | 33.0 dB(A) | −5 dB |
| Lr with a measure (enclosure or light well of 3 dB) | 35.0 dB(A) | 30.0 dB(A) | same gain |
| Size and weight | 1.30 × 0.54 × 1.20 m, 190 kg | 0.90 × 0.75 × 1.65 m, 240 kg | indoor space |
Useful heat: 2,500 litres × 10 kWh × 0.92 = 23,000 kWh. Above 800 m and without hot water, the studio counts 2,300 equivalent hours: 23,000 ÷ 2,300 = 10.0 kW on average, converted to −7 °C: 10.0 × 27 ÷ 30 = 9.0 kW. Both 10 kW templates are sufficient. Electricity: 23,000 ÷ 4.70 = 4,894 kWh for the monobloc, 23,000 ÷ 4.45 = 5,169 kWh for the indoor unit.
Noise, studio formula: Leq = LWA − 11 + 6 (facade) − 20 × log10(10) − measures; Lr = Leq + 10 + 2 at night. Monobloc: 51 − 11 + 6 − 20 = 26, Lr = 38.0 dB(A). Indoor: 46 − 11 + 6 − 20 = 21, Lr = 33.0 dB(A). A 3 dB measure takes 3 dB off both. Both remain below 45 dB(A), the night planning value for sensitivity level II.
For the same demand, the indoor ducted unit gives 5 dB less at the neighbour's here, at the cost of a slightly lower SCOP, a plant room and ducts to plan for.
3 common mistakes when choosing an indoor or outdoor heat pump
Forgetting the space and openings of an indoor unit
An indoor unit needs a large enough room, a slab that carries its weight, two air passages to the outside and condensate drainage. These works must be planned from the start; the studio does not calculate them.
Placing the exhaust outlet right below the neighbour's window
With an indoor unit, the noise comes out through the outlets: it is their position that matters for the neighbour, not that of the unit. In the radar, place the exhaust point where the duct comes out.
Comparing units without looking at the SCOP
A quieter unit may have a slightly lower SCOP: over 15 to 20 years, the difference in electricity adds up. Compare noise and electricity on the same sheet before choosing.
Compare the two types in the studio in 3 steps
- Enter the demand and the emitters
Enter the consumption or the floor area, hot water, the location and the emitters. The studio calculates the required output, the same for both types. - Change the unit type
Choose 'Outdoor air/water heat pump (monobloc)' and note the template, SCOP and noise level at the neighbour's; then 'Indoor air/water heat pump (ducted, light well)' and note the same values. - Place the unit or outlet and print
In the radar, place the point the noise comes from (the unit outside, or the exhaust outlet) and the neighbouring windows, try an enclosure or a light well, then print the sheet.
What the studio does not do for a ducted unit
The studio does not calculate the ducts, their pressure losses, the noise inside the building, the plant room or the condensate. The templates are generic: the manufacturer's data sheet is authoritative. The acoustic result is an estimate; the official noise assessment is signed by the applicant or the installer.
Soumissions costs the installation and the associated works from the quantities; the ERP tracks the site and invoicing; the Portail chantier keeps the sheet and the assessment with the client's file.
Frequently asked questions
Is an indoor heat pump always quieter?
Not always. The studio's generic templates are quieter, but it is the noise coming out of the outlets that counts, and their position. Compare with the manufacturers' data sheets.
Does the studio calculate the air ducts?
No. It does not handle the diameter, length or pressure losses of the ducts: the installer and the manufacturer size them.
Is a noise assessment needed for an indoor unit?
An air/water heat pump discharges air outside: its outdoor noise generally has to be assessed too. The exact rule and the form should be checked with the municipality or the canton.
Which measure does the studio offer for an indoor unit?
The light well, with an adjustable indicative effect, instead of the enclosure offered for outdoor units. The real effect depends on the model and the execution.