Loading...
About this tool
Checking Heat Pump Noise at the Neighbor's: Noise Directive and OPB Method
When planning an outdoor air/water heat pump in Switzerland, positioning the outdoor unit is a critical part of the building permit application file. The Ordinance on Protection against Noise (OPB) requires limiting noise emissions in the neighborhood. Municipal and cantonal authorities demand acoustic justification before issuing the building permit. Our tool applies the method from the Noise Directive implementation aid to evaluate acoustic impact at sensitive rooms of neighboring plots.
Practically speaking, the tool loads a scaled map to position elements. You can import a PDF file, load a calibrated image in two clicks on a known dimension, or use the swisstopo public read-only API to display the aerial photo and land registry based on the construction site address. You then place the outdoor unit of the heat pump as well as the windows of the concerned neighbors. For each receiving window, you indicate the height above ground as well as the noise sensitivity degree (degree I to IV) defined by the municipality's zoning plan.
The studio then calculates the geometric acoustic propagation and determines the average level in the middle of the open window of the living room. The obtained values are compared against OPB planning values. For a single-family house, the evaluation focuses on neighboring windows. For an apartment building, the building's own windows represent valid reception points that the studio allows to position and verify. The tool displays a clear verdict: below value, margin less than 3 dB, or exceeds value.
From Sound Power Level to Night Evaluation Level: Formulas, Directivity and Margin
The acoustic calculation necessarily starts from the machine's sound power level, denoted Lw. This parameter comes from the manufacturer's technical datasheet or the sound data list established by the Swiss Professional Association for Heat Pumps. The studio then calculates the evaluation level Lr according to the implementation aid formula: Lr = Leq + K1 + K2 + K3 + 10·log(t/t0). The equivalent level Leq takes into account the geometric distance between the source and the window, as well as the acoustic directivity of the assembly.
Directivity directly depends on the location of the outdoor unit on the plot. The studio automatically infers ground and facade effects based on position:
- Free propagation: unit installed three meters or more from any reflective facade.
- Against a facade: unit placed against an exterior wall, concentrating acoustic energy into a half-space.
- Inside corner: machine placed in a building corner, causing reverberation that increases sound pressure forward.
Corrections K1 (noise shape), K2 (tonality) and K3 (impulsivity) are applied for the planning phase. If multiple machines operate in cascade, the module adds a logarithmic term of 10·log(N). As a reference, the example published by the Noise Directive in its implementation aid features a heat pump displaying 57 dB(A) of nighttime sound power placed against a facade, with a window located 14 meters away in sensitivity degree II (night planning value set at 45 dB(A)). The studio faithfully reproduces this example's result with a calculated evaluation level of 41 dB(A).
On the plan, two zones are displayed in real-time around the machine: the red critical circle where the planning value is reached, and the orange circle signaling a margin of less than 3 dB. When you move the outdoor unit on screen, these zones adjust immediately. You can also test the impact of corrective measures: soundproofing cover, acoustic light well, noise barrier, timer forbidding forced nighttime operation, or activation of the machine's nighttime silence mode (already included in manufacturer datasheets, hence without double deduction).
Sizing the Heat Pump Without Oversizing: Consumption, Area and Bivalency Point
Rigorous thermal sizing avoids short cycles that prematurely wear out the compressor and degrade seasonal efficiency. The studio offers two distinct methods to establish heating power requirements. The first method relies on historical consumption data for heating oil, natural gas, or electricity. Useful energy is obtained by multiplying this final energy by the old system's efficiency, then dividing the result by the site's equivalent full-load operating hours. This number depends on the climate zone, altitude, and share dedicated to domestic hot water.
The second method relies on the energy reference area (ERA) and the building envelope's insulation quality. If the results obtained by these two approaches diverge by more than a quarter, the studio immediately displays an alert inviting you to re-examine the baseline data. You then select the chosen technology: outdoor air/water, indoor air/water, or ground/water geothermal heat pump. Fifteen generic templates from 5 to 40 kW allow quick comparisons, but you can manually enter powers and COPs from your equipment documentation.
The software checks the power delivered by the appliance at the outdoor reference temperature of -7 °C against the building's thermal demand. If installed power excessively exceeds required load, oversizing is explicitly flagged. For geothermal installations with vertical probes, the calculation determines the heat extracted from the ground based on the COP at the B0/W35 point. Total drilling length is calculated and rounded up to the nearest multiple of five meters, taking into account subsurface geological conductivity (molasse, dry limestone, water-saturated gravel or clay), with each parameter remaining user-modifiable.
Coupling Heat Pump and Solar: Self-Consumption, One-Off Remuneration and Cantonal Subsidies
Joint installation of a photovoltaic system and a heat pump optimizes coverage of the compressor's electrical needs and hot water production. In the project's third tab, you determine roofing potential either by directly entering target peak power, or by specifying available area, converted into 450 Wp photovoltaic modules. Annual production is calculated based on local irradiation from the reference meteorological station, panel inclination, and orientation.
The studio evaluates the self-consumption rate according to connected equipment. Activating smart communicating regulation of the SG-Ready type allows forcing domestic hot water tank charging or heating during midday solar production peaks. Adding a stationary battery further increases this share of locally consumed energy. Self-consumption results are displayed in real-time in the upper summary banner.
The financial section integrates existing support mechanisms:
- The one-off remuneration for small or large photovoltaic installations managed by Pronovo, taking into account the inclination bonus for facade-integrated installations.
- Cantonal subsidies dedicated to replacing fossil heating with a heat pump.
- Any municipal aid entered manually.
- The estimated tax savings calculated based on the entered investment amount.
All aid bases integrated into the studio constitute modifiable starting values. You must verify applicable scales with official services before submitting any administrative application file.
Construction Site Pitfalls and Frequent Errors Before the Permit
The costly mistake in the field concerns imprecise positioning of the outdoor unit relative to wall reflections. Building permit application files are often seen where the installer calculates acoustic distance in a straight line without accounting for an inside corner or the proximity of a concrete shared wall. A machine declared in free field while located less than two meters from a reflective facade generates a real emission level higher than initial calculations. If the neighbor has the sound level measured after commissioning, exceeding the OPB planning value may force the craftsman to install a soundproofing cover at their own expense or move the concrete pad.
The action that avoids this disappointment consists of rigorously reporting distances to neighboring walls and building angles on the site plan. If the machine is located in an area where the acoustic margin is less than 3 dB, a constructive measure should be planned from the outset, such as an acoustic screen or choosing an appliance with a lower sound power level, rather than relying on a tolerance during inspection.
Another frequent pitfall lies in forgetting geothermal drilling constraints. Installing a probe without consulting the cantonal underground drilling restriction cadastre exposes the project to outright refusal of water permits. Similarly, underestimating the dry nature of limestone terrain compared to an alluvial aquifer leads to a probe that is too short, causing thermal exhaustion of the subsurface in late winter and probe freezing.
Contractor Responsibility and Limits of a Pre-Sizing Calculation
This online studio provides rapid decision support and preliminary feasibility control. The presented results do not constitute a heating engineer's calculation note or a definitive acoustic expertise. Default quantities (equivalent operating hours, boiler efficiencies, surface thermal loads, machine templates, outdoor design temperatures, and regional sunshine) represent working orders of magnitude. These parameters must be adjusted based on actual building surveys.
Regarding sound, corrections K2 (tonality) and K3 (impulsivity) integrated into the studio are those conventionally employed during the design phase. Depending on site configuration and the built environment, an on-site acoustic analysis by a specialist may be required by the competent authority. The provided calculation does not replace the official noise protection certificate required for the building permit application, nor the formal decision of the municipal or cantonal authority.
Similarly, calculated subsidy amounts confer no rights. Support programs evolve regularly; cantonal heating replacement aid application files must imperatively be submitted and accepted before effective work begins on the construction site. Art Construction is an independent publisher from SIA, CRB and suva, and issues no authoritative verdicts or official opinions.
What the Free Version Does Not Do and How to Price the Project
The free version of the studio runs entirely within your web browser, without account creation or registration. Your entries, appliance positions, areas, and results remain stored locally on your workstation. Nothing is sent to Art Construction. The only exception concerns address querying for the cadastral background, transmitted directly to the swisstopo public read-only API. The application has no server memory: if you close or reload the page, all data is erased. Remember to generate your exports before leaving the tab.
In this online-accessible version, the plan image with the acoustic radar and the printed summary sheet feature an Art Construction watermark. The CSV export summarizing bill of quantities items (boiler removal, thermal unit, concrete base, cover, drilling, buffer tank, photovoltaic plant, inverter, battery, and connections) also mentions the free version. Furthermore, no prices are automatically injected: investment amounts must be entered by you.
To go further in commercial and technical management of your business, our professional solutions take over:
- Permanent backup of your projects on the cloud with study version management.
- Automated pricing of bills of quantities with the price base.
- Editing reports and application files without watermarks, personalized with your company logo and contact details.
- Multi-user collaboration via Team mode.
To integrate this data directly into your company quotes, discover our tenders modules, view our software offers on our Pro offers, or log in directly to the Art Construction portal.
Frequently asked questions
Is the studio's acoustic calculation accepted for the building permit?
The studio scrupulously applies Noise Directive implementation aid formulas to verify emission relative to OPB planning values. This pre-sizing helps you validate positioning on plan. However, it does not replace the official acoustic certificate form required by your municipality or canton, nor the final evaluation of the competent authority which remains solely responsible for decisions.
Where can I find the sound power level of my heat pump?
This information is mandatory on the appliance manufacturer's technical datasheet or energy label. You can also consult the sound data list published by the Swiss Professional Association for Heat Pumps (FWS). Make sure to note the nighttime sound power level Lw, and not the sound pressure level Lp at a given distance.
How do I choose the noise sensitivity degree for the neighbor?
The noise sensitivity degree (degree I to IV) is set by the zoning plan of the municipality where the neighboring plot is located. Purely residential zones generally fall under sensitivity degree II, while mixed zones (housing and commercial activities) are classified as degree III. Consult the municipal zoning plan to enter the correct planning value.
Is my construction site data stored on your servers?
No. In the free version, all calculations, drawings, and coordinates remain exclusively in your web browser's temporary memory. Nothing is sent or saved at Art Construction. The only external communication is the read-only call to the swisstopo API for displaying the cadastral map. When you close the tab, all entered data disappears permanently.
How is the drilling length calculated for the geothermal probe?
The tool first determines the thermal power to extract from the subsurface by deducting the compressor's electrical share via the machine's COP at the B0/W35 point. It then divides this power by the specific ground thermal extraction rate (defined according to whether the soil consists of molasse, dry limestone, water-bearing gravel, or clay), then rounds the depth up to the nearest multiple of five meters.
Is the Pronovo and cantonal subsidy calculation contractual?
No. Aid scales integrated into the tool are indicative starting parameters and have not undergone external legal validation. You must obligatorily verify applicable rates and regulations with Pronovo and your canton's energy department. As a reminder, cantonal aid applications must be validated before dismantling or installation work begins.
Why does an alert appear between energy demand and ERA area?
The studio continuously compares power derived from historical consumption (oil, gas, electricity) with that derived from the energy reference area and insulation standard. If the gap between these two approaches exceeds 25%, the tool alerts you. This often signals an unusual setpoint temperature, a building partially unoccupied in the past, or an underestimation of envelope heat losses.