Loading...
About this tool
From oil or gas consumption to heat pump capacity
Sizing a heat pump to replace an old heating system starts by analyzing fuel bills. To avoid factoring in the weather variations of a specific winter, apply your average consumption smoothed over three years. This approach establishes a representative thermal baseline for the building.
The tool opens with a starting case set at 2 200 litres of heating oil per year. You can replace this value immediately with your own operational history, whether using heating oil or natural gas.
The physical principle consists in determining the annual useful energy required to heat the building. The formula used is as follows:
- Annual useful energy = final energy consumed × efficiency of the existing installation
For heating oil, the calculation relies on its net calorific value. For natural gas, the conversion moves from the gross calorific value to the net calorific value in order to isolate the thermal energy actually transmitted to the heat transfer fluid.
Once the annual useful energy is calculated, the capacity required for the future heat pump is obtained by dividing this energy by the equivalent full-load hours of the site:
- Required capacity (kW) = annual useful energy (kWh) ÷ equivalent full-load hours (h)
This estimate serves as a starting point for the installer and engineering office. It allows for an initial pre-sizing before detailed room-by-room calculations.
Existing system efficiency and condensation
Not all the energy contained in the burned fuel ends up in the living spaces. A significant portion of the heat escapes through the chimney, the boiler walls, or during standby phases. The overall efficiency of the existing installation reflects these thermal losses.
In the tool, the default efficiency can be modified to reflect the reality of your boiler room. An old standard boiler exhibits higher combustion and radiation losses than a recent generator. Conversely, a recent condensing boiler displays higher operating efficiency because it recovers the latent heat contained in the flue gases.
The choice of efficiency directly influences the calculated capacity of the future machine:
- An underestimated old efficiency leads to overestimating the actual useful energy, and therefore to planning an oversized heat pump.
- An overestimated efficiency results in undersizing the replacement system, with a risk of insufficient comfort during extreme cold spells.
A costly mistake in the field: quotes are often seen establishing figures by directly converting litres of oil into kilowatt-hours injected into the building, forgetting the losses of the old boiler. This practice leads to installing an oversized electric generator. The appropriate technical step consists in applying a realistic efficiency coefficient according to the generation of the boiler in place.
Equivalent full-load hours: altitude and hot water
Equivalent full-load hours represent the theoretical time during which the machine would have to operate at its nominal capacity to cover all annual thermal requirements. This parameter does not correspond to the actual operating hours of the compressor, which modulates its capacity across the seasons.
The number of equivalent hours depends mainly on two technical criteria:
- Altitude and climate zone of the site: in the lowlands, the milder climate concentrates requirements over a different number of hours compared to mountain areas where the heating season is spread out over time.
- Domestic hot water production: if the heat pump handles hot water in addition to space heating, the annual equivalent hours volume increases to integrate this constant load year-round.
The values initially proposed in the tool are indicative orders of magnitude. You can adjust them directly to match the specificities of the municipality of installation and the project requirements.
A building located on the Swiss Plateau with integrated hot water production does not use the same calculation bases as a chalet located at over one thousand metres of altitude heated solely by radiators. Verifying these parameters prevents sizing that is unsuited to the local climate.
Checking the machine at -7 °C and avoiding oversizing
An air-source heat pump sees its available thermal capacity drop when the outdoor air temperature decreases, precisely when the building's heat losses reach their highest level. The machine's behaviour is therefore checked at the bivalence point, set at -7 °C in the tool.
The compressor's capacity at -7 °C must cover the requested thermal load or be supplemented by an electric backup heater according to the project description. The tool generates a technical alert when the selected machine presents a risk of notable oversizing.
Oversizing a heat pump leads to major drawbacks for the installation:
- Short and repetitive operating cycles in mid-season, causing premature wear of the compressor.
- A drop in the overall seasonal efficiency of the installation.
- An unnecessarily high peak electrical power demand on the local distributor's grid.
For large-volume buildings or multi-family apartment buildings, the alert highlights the potential need to distribute the capacity across multiple machines arranged in cascade. This configuration allows capacity delivery to be adjusted in steps according to climate needs and maintains heating continuity for high heating capacities.
Existing radiators and supply temperature
Replacing a boiler with a heat pump without modifying the distribution network requires checking the temperature regime of the existing emitters. Fossil fuel boilers traditionally operated with high water regimes, whereas a heat pump achieves its optimal coefficient of performance with moderate supply temperatures.
Before finalising the machine's capacity, several checks on the heating units are necessary:
- Record the surface area and type of existing radiators (cast iron, steel, convectors) in the coldest rooms.
- Check the supply temperature required at the coldest time of winter to heat the habitable volumes.
- Identify rooms where replacing a radiator with a low-temperature model allows the general water regime to be lowered.
A supply temperature that is too high degrades the overall efficiency of the compressor. The installer must ensure that the proposed machine is capable of providing the required thermal level without constantly relying on the electric backup.
This check on the emitters complements the calculation derived from oil consumption to secure the choice of model with the client.
What the free version does not do
The free version operates within your web browser, without registration and without creating an account. The imported plan, drawn positions, your inputs, and the results remain in your browser. The only technical exception: if you search for an address to display a map background, the entered address and displayed map area are requested from swisstopo via the Confederation's public read-only API. Nothing is sent to Art Construction servers.
The tool has no local or remote memory: closing or reloading the tab erases all work. You must export your results before leaving the page. The plan image and printed sheet feature an Art Construction watermark, and the CSV export of the bill of quantities bears mention of the free version.
The tool integrates no price data from the ACIP database: costs must be entered by you. The following technical limits must be taken into account on the construction site:
- Starting values (full-load hours, efficiencies, design temperatures, irradiation) are orders of magnitude to be confirmed and remain modifiable by the user.
- Financial aid scales (Pronovo and cantonal programmes) come from the studio handbook and have not been proofread at the source; verify current conditions, as cantonal applications are generally submitted before work begins.
- Acoustic calculation follows the method of the Noise Circle enforcement aid; it does not replace the noise protection certificate required for the building permit nor the final authority decision. Enter the acoustic capacity indicated on the manufacturer's sheet or on the sound data list of the Swiss Professional Association for Heat Pumps.
To save your variants in the cloud and keep a history per construction site, discover the collaborative Portal. Professionals preparing detailed quotes can transfer their quantities to our Tenders modules and our Pro plans offer to price with the ACIP database and produce watermark-free documents.
Frequently asked questions
How to convert litres of oil into heat pump capacity?
Average annual oil consumption is multiplied by its net calorific value, then by the estimated efficiency of the boiler to obtain the annual useful energy. This value in kilowatt-hours is then divided by the site's equivalent full-load hours, defined according to altitude and domestic hot water production.
Why use consumption smoothed over three years?
Winters exhibit variable climatic severity from one year to the next. Consumption measured over a single mild winter would lead to undersizing the heat pump, while an exceptionally cold year would risk causing oversizing. Smoothing over three years compensates for these seasonal gaps and stabilises the calculation of useful energy.
Is my calculation data kept online?
No. In the free version, all calculations and positions remain stored temporarily in your browser. No files are sent to Art Construction. If you close or reload the page, all data is erased. You should therefore carry out a CSV export or print the summary sheet before leaving the tool.
How does the calculation factor in natural gas?
For natural gas, the calculation applies a conversion from the gross calorific value to the net calorific value to measure the energy actually released as heat. This final energy is then weighted by the efficiency of the gas boiler in place to determine the required capacity in kilowatts.
What to do if the calculated capacity is very high?
Significant thermal capacity may indicate notable thermal envelope losses or a large-volume building. The tool highlights the value of installing multiple machines in cascade rather than a single compressor, to ensure efficient modulation during mid-season periods and avoid repeated short cycles.
Does the module replace the noise certificate for the building permit application?
No. The integrated acoustic calculation follows the principles of the Noise Circle enforcement aid for indicative purposes. It in no way replaces the official noise protection certificate submitted with the building permit application, nor the final assessment rendered by the competent municipal or cantonal authority.
Where to find the exact noise level of the heat pump?
The acoustic capacity level of the outdoor unit must be extracted from the technical documentation provided by the appliance manufacturer or directly retrieved from the sound data list made available by the Swiss Professional Association for Heat Pumps.