Loading...
About this tool
Why couple the heat pump and solar power
In Romandy, the joint installation of an electric heat generator and a rooftop solar system follows a simple logic: use the energy produced on-site to reduce draws from the distribution grid. Heat pump photovoltaic coupling makes it possible to directly power the compressor and technical auxiliaries during periods of sunshine.
From a physical standpoint, photovoltaic production peaks in the middle of the day and during the summer months. Conversely, heating needs to maintain indoor temperatures occur mainly in winter and at night. This seasonal mismatch limits direct solar input for room heating during cold snaps. On the other hand, domestic hot water production remains constant year-round, creating a regular baseline of consumption during sunny hours.
Solar heat pump self-consumption therefore aims to synchronize the machine's operating cycles with the load curve of the solar collectors. Once the installation is modeled, the flows become transparent: the share of electricity injected into the grid drops in favor of direct on-site use. For both the installer and the client, the objective is to adjust storage volumes and panel capacity to make the most of kilowatt-hours without unnecessarily increasing the initial investment.
Total electrical demand: household, heat pump, vehicle
To assess the building's energy balance, the calculation groups all electricity expenditure items together. The first item concerns household needs, which include lighting, household appliances, mechanical ventilation, and standby devices. This baseline consumption often shows two peaks, in the morning and early evening.
The second item is the heat pump. Its electricity demand is obtained by dividing the useful thermal energy required for heating and domestic hot water by the seasonal coefficient of performance (SCOP). The lower the emitter temperature regime, for example with underfloor heating, the higher the SCOP, which reduces the electricity consumption needed for heat production. Radiators requiring a higher supply temperature lead to increased use of the compressor.
An electric vehicle may add to this equation. Recharging it can double the building's annual electricity consumption, but it offers interesting flexibility if charging takes place during the day when the roof is producing power. The sum of these three components determines the overall load curve. Solar production, injected energy, the self-consumption rate, and the autonomy rate are then displayed with the details for each item. When rooftop production exceeds the building's instantaneous demand, the base self-consumption rate mechanically decreases as the surplus goes to the public grid.
Self-consumption rate: base, SG-Ready control, and battery
This page opens a representative combined case: a heat pump of about 9 kW, a 12 kWp photovoltaic installation, a 10 kWh battery, and an SG-Ready control system. In this configuration, the self-consumption rate breaks down into several measurable tiers.
The first tier is the base rate, obtained without active management. It corresponds to the fortuitous meeting between the house's routine consumption and the solar generator's production. When the collectors produce more than the building consumes, the surplus is fed back into the distribution grid.
The second tier brings in the heat pump SG-Ready protocol. This communication standard allows the inverter to indicate to the heat pump that solar surplus is available. The regulation then forces the machine to operate around noon to store energy in thermal form. This storage is achieved by targeted overheating of the domestic hot water tank and the heating buffer tank. This increase in the thermal setpoint brings a direct bonus to the overall self-consumption rate.
The third tier integrates electrochemical storage. The accumulator stores residual electricity that could not be converted into useful heat. The gain provided by this equipment increases with its capacity relative to the peak power of the solar modules. However, building physics imposes a limit: total self-consumption energy remains capped at a share of the overall demand, because the battery can only restitute what the equipment actually consumes during the night or cloudy spells.
Sizing the battery without oversizing it
Integrating a photovoltaic self-consumption battery in Switzerland must involve thoughtful sizing. Oversized storage heavily increases equipment expenditure without providing a proportional energy gain. Indeed, in winter, the lack of sunshine prevents the full recharge of a large capacity. Conversely, during the warmer season, the battery stays full from early afternoon, letting the summer surplus flow back to the grid.
The costly mistake in the field is choosing a battery capacity disconnected from the roof's power and the household's nighttime needs. We often see installations where the battery achieves only a fraction of its possible annual cycles, due to a lack of available solar energy to charge it six months a year. The action that avoids this mistake is checking the ratio between the usable storage capacity and the installed peak power, while examining the building's consumption outside daylight hours.
Regulatory and acoustic aspects must also be taken into account when positioning the heat pump. Noise calculation follows the method of the Noise Circle execution aid. This indicative calculation replaces neither the noise protection certificate submitted with the building permit application nor the formal decision of the municipal or cantonal authority. To obtain a consistent result, the acoustic power level to be entered in the parameters must come from the manufacturer's data sheet or the sound data list established by the Swiss Professional Association for Heat Pumps.
What the free version does not do
This online tool works for free, without registration and without account creation. All operations run directly in your web browser: the imported plan, positions, entered data, and calculated balances never leave your workstation. The only exception concerns the display of a map background: if you type an address to locate a parcel, the searched address and the corresponding map extract are requested from swisstopo servers via the Confederation's public read-only API. No data is transmitted to Art Construction.
The browser retains no memory: nothing is saved on a remote server. If you close your window or reload the page, all entered data is erased. Remember to export your quantities before leaving. The plan image and printed sheet bear an Art Construction watermark, and the quantity CSV file mentions the use of the free version. Furthermore, no price data from the ACIP database is integrated: unit costs must be entered manually by you.
Pre-filled starting values (full-load equivalent hours, inverter yields, specific building loads, standard machine templates, outdoor design temperature, and weather station solar irradiation) are indicative orders of magnitude that you must confirm and adapt according to the project. Similarly, subsidy scales for Pronovo and cantonal building programs come from the studio notebook and have not been proofread at the source: it is your responsibility to check the regulations in force. As a reminder, cantonal aid applications are generally filed before breaking ground.
To go further on your construction sites, the paid Portail and ERP solutions allow centralized backup with version control, collaborative teamwork, and immediate reloading of files. You can switch your quantities to the Tenders modules to value your quantities with the ACIP price base, or generate a commercial quote without a watermark from the Pro quote page.
Frequently asked questions
Are my project data transmitted or stored?
Your data stays in your browser. No project or quantity take-off is sent to Art Construction. Address searches query the public swisstopo API to display the read-only map. When you close or refresh your tab, the data is erased. You must export your summary document before leaving the page.
Are the displayed subsidy scales contractual?
The aid scales for Pronovo and cantonal programs indicated in the tool are modifiable starting values. They come from the studio notebook and have not been verified against the official source. You must check the current amounts with your canton or the Confederation. Applications must be submitted before work begins.
Does the acoustic calculation replace the certificate for the building permit?
The acoustic module applies the principles of the Noise Circle execution aid for indicative purposes. It does not replace the official noise protection certificate required with the building permit application, nor the opinion of the competent authority. You must use the acoustic power from the manufacturer's sheet or the Swiss Professional Association for Heat Pumps.
How does the heat pump receive the overheating command?
The signal relies on the SG-Ready standard. The photovoltaic inverter or an energy manager transmits a command to the heat pump terminals when solar production exceeds a chosen threshold. The regulation then temporarily raises the temperature setpoint of the hot water and buffer tank to store energy there in thermal form.
Why does my self-consumption rate decrease with a very powerful roof?
The self-consumption rate measures the fraction of produced electricity that is consumed on-site. If you increase the surface area of photovoltaic panels without changing the building's electrical needs, the volume of surpluses grows faster than direct consumption. The share of electricity injected into the grid becomes predominant, which drives down the self-consumed percentage.
Where do the unit prices used in the calculations come from?
The free version contains no prices or tariff data from the Swiss ACIP database. All amounts and installation costs must be entered manually by the user. To automatically integrate construction industry reference prices, you must use Art Construction's paid costing software.
How to retrieve a clean costing for the client?
In the free online tool, exports carry an Art Construction watermark and CSV files mention the free version. Professionals wishing to edit reports free of any markings, integrate their own company header, and link quantities to a complete quote can subscribe to the range's paid solutions.