Loading...
About this tool
Why location matters more than machine power
On a renovation construction site or new build, the question of air/water heat pump noise comes up very quickly. General contractors, architects, and installers often focus on manufacturer data and appliance power. Yet, the exact location where you place the outdoor unit completely changes the acoustic situation in relation to the neighbors' windows.
A well-chosen machine placed in the wrong spot can trigger complaints from the very first nights of heating. Building walls act as reflectors. As soon as the appliance is close to a wall, acoustic energy no longer radiates in all directions. It concentrates in the remaining space, increasing the perceived sound pressure at the property line or against neighboring rest rooms.
Choosing the location comes before ordering equipment. Moving the machine a few meters on the site plan immediately changes the exposure of the opposing facade. Working on placement avoids having to look for emergency solutions during construction work.
Free propagation, facade, re-entrant corner: three directivities
To evaluate the acoustic impact of an outdoor unit, three scenarios occur on the field. The tool opens an L-shaped building with the machine placed in the re-entrant corner and allows direct comparison of these three directivity situations:
- Free propagation: the appliance is placed three meters or more from the facade, according to the Cicerono Bruit form guidelines. Sound diffuses without immediate reflection by building walls.
- On a flat facade: the unit is placed against a straight wall. The surface reflects the sound wave forward, increasing noise levels directed toward the neighboring plot.
- In a re-entrant corner: the unit is framed by two vertical walls forming a corner. Both surfaces reflect acoustic emissions, concentrating energy in a narrow zone.
The tool deduces directivity from the position of the machine relative to the building you draw. This immediate reading helps check if the appliance is too close to masonry before finalizing pipe routing and the concrete base.
The critical distance and the red circle around the machine
The critical distance corresponds to the distance from which the night evaluation level reaches the planning value of the sensitivity degree set for the zone. It is given for each of the three studied directivities. In the tool, this zone appears as a red circle drawn around the machine.
This radius materializes the space within which the night planning value is exceeded. If a neighboring bedroom window is within this red perimeter, the chosen layout poses a problem. The layout helps identify at a glance whether the planned location is viable compared to direct neighbors.
Noise calculation follows the method from the Cercle Bruit execution aid. You must enter the acoustic power level of the equipment, from the manufacturer's technical sheet or the Swiss Professional Association for Heat Pumps sound data list. The visual result helps pin down the technical file well before running technical pipes.
Upper floor window and buildable limit of a neighboring plot
The distance between the outdoor unit and the reception point is not just a flat measurement on a cadastral plan. A bedroom window located on the first floor or in the attic is further away from the machine than a ground floor window, because the sound wave path forms a diagonal in space.
The tool incorporates this height difference with the receiving window. Taking the actual height of the glass bay into account shortens the critical radius projected onto the ground plan. This refines evaluation without overestimating the footprint of the critical circle.
On an unbuilt but buildable neighboring plot, the property boundary requires the same vigilance. Even without an existing building, the project must anticipate future placement of sensitive rooms according to the local zoning plan. Testing multiple locations on the master plan secures placement for years to come.
Correcting the location before thinking about technical measures
On the construction site, installations are often planned in a recessed facade corner to hide the outdoor unit from view. This is the classic mistake: the corner acts as an acoustic horn, reflects sound toward the neighboring plot, and creates tension upon commissioning. To fix the issue afterward, clients must then consider heavy casings or costly acoustic screens that complicate maintenance.
The right reflex is to virtually move the machine during the preliminary project phase:
- Move the unit away from re-entrant corners to switch to a simple facade, or better, free propagation three meters from walls.
- Orient exhaust grilles away from rest windows of adjacent homes.
- Use natural terrain masks or facade setbacks without windows.
Modifying layout on plan takes minutes and costs nothing in supplies, whereas installing an acoustic screen after pouring the base increases construction costs.
What the free version does not do
The layout tool works for free, without registration or account creation. You work directly in your web browser: the imported plan, drawn positions, entries, and results stay in your browser. There is one exception: if you search an address to display a map background, the searched address and displayed map area are requested from swisstopo (Confederation public API, read-only). Nothing is sent to Art Construction servers.
The free application has no memory. Nothing is saved on a server: closing or reloading the tab erases all your work. You must export documents before leaving the page. The plan image and printed sheet carry an Art Construction watermark, while the CSV takeoff export bears the free version notice. Additionally, no pricing data from the ACIP database is integrated: you enter unit costs yourself. Financial aid scales are modifiable starting values you must check.
Starting values (full load equivalent hours, yields, specific loads, templates, sizing temperature, and irradiation) are indicative orders of magnitude to adjust. Pronovo and cantonal scales come from the studio notebook and have not been proofread at the source; cantonal applications are generally submitted before work begins. Calculation does not replace the noise protection certificate required for the building permit, nor the formal authority decision. Art Construction is independent of SIA, CRB, and CFST.
To keep your files and archive successive versions on a cloud site, you can switch to the Portal or ERP. You can also prepare complete offers without watermark using the Tenders module, or discover the full formula on the Pro Offer page.
Frequently asked questions
Where can I find the official noise level of the heat pump?
You will find the acoustic power level on the manufacturer's technical sheet or in the Swiss Professional Association for Heat Pumps data table. This value must be entered into the form to calculate critical distance.
What distance separates free propagation from a facade installation?
According to the Cercle Bruit form method, a machine installed three meters or more from a facade is considered in free propagation. Below this distance, the rear wall begins to reflect acoustic waves forward.
Is my construction site data saved online?
No. In the free version, no entry is saved on a server. Everything stays in your browser. Closing the tab erases your calculations, so you must print the sheet or export your plans before leaving the tool.
Does the displayed calculation replace the building permit certificate?
No. Calculation follows the Cercle Bruit method to guide you in placement, but it replaces neither the acoustic protection certificate required when submitting the permit application, nor the examination by communal or cantonal authorities.
How does a window height modify the red circle?
Sound travels an oblique distance to reach an upper floor window. The tool takes this vertical drop into account, reducing the radius of the critical circle projected horizontally on your site plan.
Where do map backgrounds used in the browser come from?
If you search an address, the map is called directly from the swisstopo service via the Confederation's public read-only API. Your appliance positions and layouts remain confined within your browser.
Why avoid placing the heat pump in a re-entrant corner?
In a re-entrant corner, the two vertical walls concentrate sound energy like a funnel toward the outside. The critical night distance increases significantly compared to simple facade placement or open terrain.