Free software · 100% in your browser · no data sent

Reduce heat pump noise: acoustic cover, light well and night mode

Reduce heat pump noise for neighbors: acoustic cover, light well, silent mode. Test options online, free Swiss tool.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

Which measure to choose when the planning value is exceeded

When installing an air-water heat pump in a residential area, nighttime noise levels often cause issues at the property boundary. The planning value set for windows of noise-sensitive rooms in the immediate neighborhood requires absolute strictness as early as the permit application phase. As soon as the assessment level exceeds this limit by a few decibels, the building permit is blocked or neighbors oppose the project. Installers and clients must then find an effective technical fix to lower the perceived acoustic level.

In the field, several solutions exist to correct an overshoot. One immediately thinks of placing an acoustic cover on the outdoor unit, directing the air through an absorbing light well for an indoor machine, or erecting a solid noise barrier between the source and the receiver. Each device has specific implementation requirements and direct repercussions on the aerodynamic pressure losses of the installation.

In our free tool accessible in your browser, you load a critical example case: a heat pump installed in an inner corner of a façade, whose nighttime assessment level exceeds the planning value by about three decibels at the neighbor's property. You can check the cover, the light well, the noise barrier or the time programming. The red circle representing the overshoot zone shrinks directly on your situation plan based on your selections.

The objective is to compare the effect of these variants before committing expenses for metalwork or masonry. Choosing the right measure requires understanding how sound propagates according to the directivity of the appliance and the configuration of the surrounding walls.

Cover, light well, screen: indicative effects

The acoustic attenuation provided by a physical obstacle is never a fixed magical value. A soundproofing cover for an outdoor machine, an absorbing light well for an indoor machine or a noise barrier provide a sound reduction that varies strongly depending on the frequencies emitted by the compressor and the fan. The compressor often generates low-frequency components that are difficult to stop, while air mixing produces a broader spectrum.

In our tool, the effect of these equipment items is offered as an indicative range based on the recommendations of the Swiss Noise Abatement Circle (Cercle Bruit). You choose a realistic value within this range depending on the quality of the equipment considered. For example, a complete acoustic enclosure with absorbing baffles offers a more marked reduction than a simple open-work cladding, but it requires checking the necessary airflow to preserve the proper functioning of the evaporator.

Beware of improvised partition walls. A poorly dimensioned or poorly positioned noise barrier can worsen the situation by creating resonances or allowing the sound wave to bypass via diffraction. If the screen is too low or too short relative to the line of sight between the machine and the neighboring window, effectiveness becomes nil on low frequencies. Our tool also displays an explicit alert if you configure a screen whose geometry risks degrading the acoustic behavior.

For a light well connected to a basement exhaust duct, treating the internal walls with weather-resistant absorbing material is essential. The outlet grille must be oriented away from sensitive openings to maximize the screening effect of the natural ground.

Night silent mode and timer: what really matters

Many manufacturers now integrate a so-called silent mode or night mode function into their controls. This function reduces the rotation speed of the compressor and fan during rest hours, generally between 22:00 and 7:00 in the morning. This reduces noise emission at the source, but it also decreases the maximum heating capacity available at the time when the outdoor temperature is often coldest.

From an acoustic calculation standpoint, a common confusion arises when compiling the file. Night silent mode is not a flat-rate attenuation to be manually deducted from a standard noise level. The execution aid from the Noise Abatement Circle specifies that this acoustic reduction is already integrated into the nighttime sound power level declared by the machine manufacturer. Our studio therefore does not subtract this value a second time if you already use the nighttime data of the device.

The timer completes this time-management device. By blocking any engagement of the heat pump during the night—for example, by compensating with a higher heating setpoint at the end of the day and relying on the building's inertia or a thermal store—nighttime noise emission is canceled. However, this strategy requires verifying that the generator covers the building's thermal losses without resorting to costly electrical boosters.

Always take as a reference the sound power level from the manufacturer's official technical datasheet or the sound data list maintained by the Swiss Professional Association for Heat Pumps. These measured figures provide the only solid basis for your entries.

Changing location or machine rather than stacking measures

The costly mistake in the field consists of trying to fix a heat pump installed in the worst possible location with expensive accessories. We often see installations planned in inner corners formed by two concrete walls, oriented directly toward the neighbor's living room or bedroom located just a few meters away. Multiple reflections against hard walls amplify the sound level emitted outward, increasing the directivity index.

Before ordering a custom acoustic cover or erecting a massive fence, the technical move that avoids error is to study the overall layout on the plot. Moving the machine by two or three meters, installing it along a flat façade without a reverberation angle, or turning the air exhaust toward a non-sensitive area (such as an access courtyard or a clearance without windows) often allows gaining the missing decibels without spending a franc on passive soundproofing.

Another option is to compare models on the market. Between two heat pumps of equivalent thermal power, the base sound power level can vary noticeably. Choosing an intrinsically quieter machine right from the tender avoids subsequent disputes and often dispenses with installing cumbersome devices that complicate periodic maintenance and degrade the aesthetics of outdoor surroundings.

Using the tool helps anticipate these configurations by directly observing the influence of distance and reflective walls on the noise assessment circle around the machine.

What the free version does not do

The free version of Art Construction operates entirely within your Web browser, without registration or account creation. Your imported plans, the positioning of the heat pump, your acoustic entries and propagation circles remain stored locally on your workstation. Nothing is sent to Art Construction servers. The only exception concerns address searches to set a background map: in this specific case, the entered text and requested area query the Confederation's public swisstopo API in read-only mode.

This online tool has no memory of your manipulations. If you close your tab or reload the page, your settings are erased. Remember to export your results before leaving the interface. On the free version, the visualized plan and printed sheet feature an Art Construction watermark, and the export of quantities in CSV format mentions the free version.

In addition, this version does not integrate prices from the ACIP database. You must enter your landscaping work amounts yourself. The subsidy scales presented (Pronovo and cantonal programs) are initial indicative values to be systematically verified with the competent services, as aid applications generally must be submitted before the first pickaxe strikes the construction site.

The calculation applies the simplified method of the Noise Abatement Circle execution aid. It does not constitute the formal attestation required for the building permit application and does not prejudge the decision of the cantonal or municipal authority.

If you wish to keep your files in a cloud space with history management, collaborate with multiple people on the same data, link quantities to the ACIP price database and generate watermark-free documents reflecting your corporate image, you can discover our paid solutions in tenders, explore the enterprise features of our ERP or find all your technical tracking on the Portail.

Frequently asked questions

Does night silent mode reduce the efficiency of my heating?

Yes, silent mode limits compressor and fan speed to reduce noise. This restriction lowers the machine's instantaneous thermal power. During periods of severe cold, it must be verified that the building does not experience an undesirable indoor temperature drop.

Can an acoustic cover cause the heat pump to fail?

An unsuitable acoustic enclosure creates significant air pressure losses. If the evaporator lacks airflow, efficiency drops and the machine may go into safety mode due to freezing or overheating. Equipment designed for the manufacturer's nominal flow rate must be used.

Can I install a noise barrier very close to the machine?

Placing a screen too close to the outdoor unit risks sending the expelled air back toward the intake, causing a harmful thermal short circuit. In addition, a poorly dimensioned wall generates resonances that can worsen low frequencies. Our online tool alerts you to these geometric risks.

Is my acoustic project data saved on your servers?

No. Everything works in your Internet browser without an account or registration. Your entries remain local. Only coordinate searches query the Confederation's swisstopo API in read-only mode. Closing the tab deletes all your data without retention.

Does the calculation provided by the tool replace the official permit application form?

No. The online calculation applies the Noise Abatement Circle execution aid method to guide you in choosing measures. It does not replace the formal noise protection attestation to be attached to the building permit file nor the authority's decision.

Where can I find the exact sound power level of my device?

This information is mandatory on the manufacturer's detailed technical datasheet or in the sound data catalog published by the Swiss Professional Association for Heat Pumps. Daytime and specific nighttime values should be noted.

How can I save my soundproofing take-off to return to it later?

In the free version, no saving is possible; you must export your work before closing the page. To store your projects on a secure cloud, manage multiple variants and transfer your data to costing, use the management functions of the Portail.