The external corner of a building is a geometric thermal bridge: the outer surface that gives off heat is larger than the inner surface that receives it. When the external insulation wraps round the corner without a break, the effect stays small. Things change when a concrete pillar or column is embedded in the masonry, or when a partial renovation leaves a corner or a pillar without insulation: the inside corner cools down, and that is where mould appears behind a wardrobe.
The “External corner and pillar” template of the 2D Thermal Bridges studio draws a horizontal section of the corner, with or without external insulation, and a concrete pillar of adjustable width. The finite element solver calculates the temperature field, the linear coefficient based on external dimensions Ψe and on internal dimensions Ψi, the L2D value and the temperature factor fRsi at the coldest point. To place this template among the other junctions, see the catalogue of the eight common thermal bridges; this page covers only the corner and the pillar.
Worked example: four corner variants compared with the mould threshold
A block of flats in 175 mm brick masonry with 160 mm of rendered external insulation. Example conditions: θi = 20 °C, internal relative humidity 50 %, θe = −8 °C (example design temperature, to be replaced by the one for your location). The surface temperatures of the corner are example values, to be replaced by those the studio shows for your detail.
| Variant | Cold spot θsi (example) | fRsi = (θsi − θe) / (θi − θe) | Example threshold 0.74 |
|---|---|---|---|
| Corner insulated continuously (160 mm) | 17.6 °C | 25.6 / 28 = 0.91 | above |
| Concrete pillar, continuous external insulation | 16.9 °C | 24.9 / 28 = 0.89 | above |
| Uninsulated masonry corner | 13.1 °C | 21.1 / 28 = 0.75 | borderline |
| Concrete pillar left uninsulated (partial renovation) | 11.2 °C | 19.2 / 28 = 0.69 | below |
The threshold follows from the humidity. At 20 °C, the saturation pressure is about 2 337 Pa; at 50 % relative humidity, the vapour pressure is about 1 168 Pa. For the surface humidity to stay below 80 %, the surface must have a saturation pressure of at least 1 168 / 0.80 = 1 460 Pa, i.e. a temperature of about 12.6 °C. The critical factor is then (12.6 + 8) / (20 + 8) = 20.6 / 28 = about 0.74.
Each variant is compared with this threshold: 0.91 and 0.89 leave a margin, 0.75 is borderline, 0.69 indicates a corner where mould is likely with furniture against the wall. The studio performs the same calculation in its humidity pass, with an internal surface resistance of 0.25 m²K/W representing a furnished corner, and shows the threshold based on your own temperatures and humidities.
A concrete pillar is harmless if it is wrapped by the external insulation; left bare in a partial renovation, it takes the corner below the mould threshold of this example.
3 common mistakes at façade corners and pillars
Stopping the insulation at the corner or at the pillar
Scaffolding moved, a work-package boundary or a projecting pillar, and the insulation stops a few centimetres short of the corner. This uninsulated strip concentrates the heat flow over the full height of the building: the inside corner cools down storey by storey.
Reading a negative Ψe as a calculation error
On external dimensions, a well-insulated external corner often gives a slightly negative Ψe: the external areas counted for the plain walls already overestimate the loss. This is not a software fault but a correction to keep in the balance.
Checking energy and forgetting corner humidity
A pillar can add few losses in kWh and still create a cold corner. Check the fRsi factor in the humidity pass, with the actual humidity of the room: a poorly ventilated bedroom or a bathroom needs more margin than a living room.
How to model a corner or a pillar in 2D in 3 steps
- Choose the “External corner and pillar” template
Open the studio, choose the template in horizontal section, then set the wall thickness, its material, the thickness and type of external insulation and the width of the concrete pillar. Replace the starting conductivities with the manufacturer’s values if you know them. - Enter the site and the indoor climate
Enter the internal temperature, the external design temperature for your location, the internal relative humidity and the critical surface humidity. The studio scales the temperature field to these values. - Read Ψe, Ψi, the cold spot and compare
Read the cold spot, the fRsi factor and its threshold on the map, then Ψe and Ψi. In the “Before / after” tab, compare the bare and the insulated corner, or the pillar with and without insulation, before printing the sheet or exporting to CSV.
What the free version does not do for corners and pillars
The calculation is two-dimensional and steady-state: a corner where three surfaces meet (two walls and a slab) is a singular point that the studio does not handle. The external temperatures and thresholds offered are starting values to be checked. The result helps you decide; it replaces neither a building physicist’s signed report nor a specialist’s opinion where mould is already present. Nothing is saved: closing the tab clears the detail.
With Soumissions, the insulation of the corner or the pillar goes into the items of your tender. The ERP tracks the site, the hours and the invoicing, and the Portail chantier files the calculation sheets by site to share them with the architect.
Frequently asked questions
Does an externally insulated external corner count as a thermal bridge?
It is a geometric thermal bridge. With continuous insulation its effect is small, and Ψe on external dimensions is often negative. A cantonal checklist referring to SIA 380/1 allows this type of corner to be neglected; check the rule that applies to your energy statement.
Why does my concrete pillar cause mould when the wall is sound?
Concrete conducts heat about five times better than ordinary brick. Without insulation in front of it, it cools the inner surface at the pillar and in the corner. The studio’s fRsi factor shows whether the surface temperature drops below the humidity threshold.
What external temperature should I enter for the humidity check?
The design temperature for your location, which is more severe than the January average. The studio offers starting values that must be checked; the fRsi threshold depends on this temperature and on the internal humidity.
Does the studio calculate a steel column or a wall anchor?
No. The template handles a concrete pillar in horizontal section. A point element such as an anchor or a bracket needs a three-dimensional calculation, outside the scope of the studio.