2D Thermal Bridges Studio: Psi Value, fRsi Factor and Mold Risk

Choose a junction (balcony, reveal, blind box, wall base, parapet, partition wall, roof, corner) or draw your own: the studio solves 2D heat conduction, calculates Ψ at external and internal dimensions, the fRsi factor and the cold spot, and compares the detail before and after correction.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

How to calculate a linear thermal bridge Ψ by finite elements in the browser

Calculating a linear thermal bridge requires knowing the thermal conduction through an assembly of several materials. Within the browser, the studio uses a four-node rectangular finite element mesh on a non-uniform grid. This method discretizes the cross-section of a construction detail to establish thermal equilibrium.

The operation is performed entirely in your browser, without transferring data to an external server. The solver computes heat conduction in two dimensions for a steady state. At each resolution, the system checks the overall energy balance between incoming and outgoing heat flows. The numerical result appears in a fraction of a second on your screen.

To determine the linear coefficient Ψ, the studio solves the heat equation according to the temperature field imposed at the boundaries. The overall two-dimensional heat flow L2D derives from this resolution. By subtracting the sum of the one-dimensional flows of the unperturbed standard walls, the tool isolates the energy share specific to the junction. The interface displays the mesh, the flow vectors as well as the isotherms spaced two degrees apart.

External and internal dimensions: why Ψe and Ψi are not equal

The numerical value of a thermal bridge depends on the chosen dimensional reference system. In building thermal calculation rules, envelope surfaces are measured either by external dimensions or internal dimensions. This convention directly changes the reference length of the adjacent standard walls.

The fundamental formula applied by the solver is written:

Ψ = L2D − Σ U·l

In this equation, L2D represents the two-dimensional thermal conductance of the complete detail. The term U designates the thermal transmittance coefficient of a standard wall, and l represents its taken length. Since external dimensions encompass the thicknesses of slabs or corner walls, the external length turns out greater than the internal length.

Consequently, the subtracted share Σ U·le is greater than Σ U·li. It frequently happens that the value at external dimensions Ψe becomes negative, notably at an outward corner. The studio never crops a negative value of Ψe, unless you choose to activate the corresponding option. The U values and reference lengths remain visible to allow you to redo the calculation by hand.

Limit value and target value: what the studio compares and what it leaves to your choice

The processing of results demands technical rigor without blind automation. The studio displays no regulatory pass or fail verdict. It proposes starting values taken from the studio booklet for requirements related to SIA 380/1 and SIA 180 standards, but these figures remain modifiable parameters.

The tool compares the calculated value Ψe with the limit value and target value that you enter in the form. The generated text simply indicates whether the obtained value is "less than or equal to" or else "greater than" your entered reference. No organization intervenes to validate this comparison within the tool.

You retain responsibility for adjusting material conductivities according to manufacturer technical data sheets. Eighteen starting materials are integrated, such as reinforced concrete, bricks, wood, graphitized EPS insulation, XPS, stone wool, aerogels or cellular glass. You can also define four starting climate stations, including Geneva, Zurich, La Chaux-de-Fonds and St. Moritz, or manually enter your own outside temperatures and degree-days.

Mold and condensation: the fRsi factor, the dew point and the two calculation passes

Evaluating surface moisture risks requires a clear distinction between the energy balance and the interior hygiene analysis. The studio runs two successive resolutions on the same mesh without altering the geometry. The first resolution evaluates energy with an interior surface thermal resistance of 0.13 m²·K/W. The second resolution analyzes moisture with a resistance increased to 0.25 m²·K/W, while the window frame surface remains fixed at 0.13 m²·K/W.

Nodal temperatures are first calculated between zero and twenty degrees, then rescaled to the actual entered thermal conditions. The tool then determines the surface temperature factor fRsi at the coldest location:

IndicatorParameter taken into accountPhysical consequence
fRsiInterior surface resistance 0.25 m²·K/WMinimum interior surface temperature
Mold riskCritical surface relative humidity enteredCritical isotherm highlighted in red
Dew pointRelative humidity and ambient air temperatureLiquid condensation on the facing

The studio returns a three-level state: temperature above critical threshold, mold risk, or surface condensation. A thermal probe allows reading the flux density under the cursor.

Eight common junctions and a free editor: choosing the right detail

The program integrates eight standard cross-sections configurable to the nearest millimeter to cover sensitive points encountered on the construction site:

  • Reinforced concrete cantilever balcony
  • Window reveal and sill
  • Lintel with slat blind box
  • Wall base on unheated basement
  • Flat roof parapet
  • Slab on wall with interior insulation
  • Connection between facade and pitched roof
  • Outward corner or concrete corner pillar

In addition to these standard geometries, a free rectangular block editor on a 5 mm grid allows you to draw specific assemblies. You can thus combine different layers of masonry, renders or metal frameworks.

Each calculation node allows observing the impact of a constructive modification. A comparator examines the initial state against the corrected variant. This comparator quantifies the difference on the Ψe value, the fRsi factor, the surface temperature as well as the annual energy loss expressed in kWh based on the detail length and introduced degree-days.

Errors that cost dearly in the field: blind box, forgotten thermal break, interrupted insulation

On the construction site, lack of coordination between trades leads to frequent defects. The case of the slat blind box perfectly illustrates this break: to house the mechanism within the lintel thickness without modifying the ceiling height, the facade insulation thickness is reduced to a few undoubled centimeters. The interior temperature then drops along the lintel, causing mold to appear behind the curtains.

A similar situation occurs when pouring a balcony slab without a structural thermal break. If the reinforcement passes through the insulating layer without an appropriate cut-off element, the external slab acts as a continuous cooling fin. Inside, the angle between the floor and the facade drops below the dew point.

The action that prevents these defects consists in checking envelope continuity before ordering joinery and concrete formwork. Modeling the actual thickness of the blind box or the insulating reinforcement basket allows correcting the insulation return path on the lintel or installing high-density insulation lining before finishing work begins.

Liability of the contractor and designer in case of mold

In Switzerland, the appearance of mold or condensation on a new or renovated structure triggers the analysis of contractual responsibilities. The legal regime falls under the Code of Obligations (CO) as well as the clauses of SIA 118 standard when integrated into the construction contract. A poorly managed thermal bridge causing early dew point formation can constitute a defect in the work.

The contractor subject to SIA 118 standard has a duty to notify and warn the client and site management. If they notice a manifest flaw on the execution drawings, such as missing insulation under a metal window sill or complete interruption of thermal lining, they must report it in writing before execution. Failing this, their liability may be sought alongside that of the designer.

The studio provides technical assistance to visualize cold zones, but its results never replace the expertise of a building physicist nor the formal decision of the competent authority. The entered limit values must be subjected to rigorous control against the project's reference texts.

What the free version does not do, and upgrading to Tenders, ERP or Portal

The free studio runs exclusively in your browser. Nothing is sent to a server and nothing is saved in a remote database or in your browser's local memory. If you close the window or reload the tab, all geometric data and calculations are erased immediately. Paper printing of the sheet features an Art Construction watermark and CSV exports mention the free version.

Moreover, this free version contains no unit price, no description nor any ACIP base code. The generated takeoff provides only raw physical quantities without financial evaluation. To integrate the detail into a complete commercial offer, you can turn toward our professional solutions.

Upgrading to paid software Tenders, ERP or the Portal allows saving your studies per construction site with tracking of successive versions on the cloud. These tools integrate automated costing with the ACIP price database processed on server, export of customized reports in your company colors without watermark, as well as collaborative teamwork.

Frequently asked questions

How does the studio treat the temperature of an unheated room?

An unheated room is automatically assimilated to the outside: the studio requests no temperature for it, and the ground is not modeled. This simple assumption is displayed among the calculation limits; it increases the losses of a wall base on a basement and is read as an order of magnitude.

Why can the calculated Ψe value be negative?

Ψe uses external dimensions to measure standard walls. When external development exceeds the actual thermal heat loss surface, the subtraction Σ U·le overcompensates the overall 2D flow. This result is mathematically exact and is not truncated, unless you check the manual cropping option.

Are the results validated against EN ISO 10211 standard?

The finite element numerical solver has been compared to basic analytical solutions and verified against an independent solver. However, the test cases from the annex of EN ISO 10211 standard have not been re-run, and no external organization has granted validation to this tool.

Does the studio validate SIA 380/1 standard requirements?

No. The studio issues no certificate or acceptance verdict. It compares the obtained Ψe value with the target and limit values that you personally enter, then signals whether the result is lower, equal or higher than your input benchmark.

How are windows and blind boxes taken into account?

Window joinery is introduced in the form of an equivalent homogeneous frame and glazing. The blind box is represented by an equivalent air cavity associated with its insulating lining, without modeling detailed airflow infiltrations or box air permeability.

Do my calculations remain memorized if I leave the web page?

No. The tool operates 100% in your browser without persistent session memory. No data is sent or saved on our servers. Refreshing or closing the page erases all your cross-section and settings.

What data is exported in the free CSV file?

The CSV export includes the chosen example and junction, date, entered temperatures and humidity, L2D, Ψe, Ψi, minimum surface temperature, fRsi and its threshold, critical temperature, annual loss, adjacent walls (U value and lengths) and corrective solutions takeoff. The file bears the mention of Art Construction free version.