In an externally insulated façade, the window can be fitted in three ways: in the plane of the insulation, mid-wall within the load-bearing wall, or at the inner face of the wall. The choice is often made early, for reasons of fixing, weathertightness or appearance, yet it governs the heat loss around the whole perimeter of the windows and the temperature of the inner corner of the reveal.
The “Reveal and window sill” template of the 2D Thermal Bridges studio offers all three positions, in vertical section at the sill or horizontal section at the jamb, with the thickness and type of insulation returned into the reveal. The neighbouring pages cover the aluminium sill and the blind box; this one focuses on choosing and checking the fitting position.
Worked example: three fitting positions compared at the jamb
A 175 mm brick wall with 160 mm of external insulation, a timber-aluminium window, horizontal section at the jamb. Example conditions: θi = 20 °C, internal humidity 50 %, θe = −8 °C. The surface temperatures are example values, to be replaced by those the studio shows for your detail.
| Window position | Insulation return | Cold spot θsi (example) | fRsi = (θsi + 8) / 28 |
|---|---|---|---|
| In the insulation plane | not applicable | 15.9 °C | 23.9 / 28 = 0.85 |
| Mid-wall | 30 mm | 14.2 °C | 22.2 / 28 = 0.79 |
| At the inner face, with return | 30 mm | 13.6 °C | 21.6 / 28 = 0.77 |
| At the inner face, without return | none | 11.8 °C | 19.8 / 28 = 0.71 |
Under these conditions, the 80 % surface humidity threshold corresponds to a surface temperature of about 12.6 °C, hence a critical fRsi factor of (12.6 + 8) / 28 = about 0.74. The first three variants stay above it; fitting at the inner face without an insulation return falls to 0.71, below this threshold.
The insulation return matters almost as much as the position: in this example, a 30 mm return takes inner-face fitting from 0.71 to 0.77. The studio’s “Before / after” comparison also shows the difference in Ψe between two variants, which you multiply by the window perimeter to judge its weight on the façade.
In this example, fitting in the insulation plane gives the warmest corner; fitting at the inner face is only acceptable with an insulation return into the reveal.
3 common mistakes about window position
Choosing the position without the façade installer
The fitting position is often decided by the joiner, the insulation by the façade installer. Without agreement, there is no room for the return or the frame is not covered. Fix the position and the thickness of the return on the detail drawing before ordering the windows.
Checking the sill and forgetting the jamb
The vertical section at the sill says nothing about the jamb, where the insulation return is often thinner. Calculate both sections in the studio: the loss adds up around the whole perimeter, and the cold spot may be at the jamb.
Neglecting frame overlap by the insulation
A return that stops at the edge of the frame leaves a cold edge. Making the insulation overlap part of the outer frame improves the cold spot; check this against the visible frame width and with the window manufacturer.
How to compare window positions in 3 steps
- Open the “Reveal and window sill” template
Choose the section (sill or jamb), the thickness of the wall and the insulation, the frame material, and the thickness and type of the return. Set the window position: in the insulation plane, mid-wall or at the inner face. - Enter the climate and the window perimeter
Enter the temperatures and the internal humidity, then the total length of the jambs, sills and heads concerned as the detail length, to get the annual loss. - Compare in “Before / after”
Keep one variant as the reference and change the position or the return: the studio shows the difference in Ψe, annual loss and cold spot. Print the sheet for the chosen variant or export to CSV.
What the free version does not do for window fitting
The frame and the glazing are equivalent homogeneous blocks: the real geometry of the profile is not modelled, and the window’s Uw value comes from the manufacturer. The calculation covers neither airtightness nor rain-tightness of the joint. The window corners, where jamb and sill meet, are singular points outside the 2D calculation. Nothing is saved.
With Soumissions, the insulation return and the fitting go into the tender items. The ERP tracks the site and the invoicing, and the Portail chantier shares the detail sheet with the architect and the joiner.
Frequently asked questions
Which window position gives the lowest losses?
Generally, fitting in the plane of the insulation, where feasible. The studio lets you check this for your wall and frame: change the position and read Ψe and the cold spot in the comparison tool.
Should fitting at the inner face be avoided?
Not necessarily, especially in renovation or for reasons of appearance. It needs a sufficient insulation return into the reveal; the studio’s fRsi factor shows whether the corner stays above the humidity threshold.
Do the sill, the jamb and the head all need calculating?
Yes, they are three different sections. The window template handles the sill and the jamb; the head with a blind box has its own template and its own page.
Does the studio give the Uw value of my window?
No. The Uw value is read from the manufacturer’s declaration. The studio calculates the thermal bridge at the junction between the window and the wall.