Loading...
About this tool
Eight Junctions Concentrating Losses and Mold
On a thermal insulation construction site in western Switzerland, linear heat losses and condensation risks concentrate on a few recurring assembly details. This studio provides a selector of eight common junctions modeled in cross-section, with dimensions modifiable in millimeters. These are not static extracts from a federal office catalogue, but parametric templates solved using finite elements.
The engine calculates two-dimensional thermal conduction on a four-node rectangular mesh. Two successive passes run across the grid: an energy pass with an interior surface resistance of 0.13 m²·K/W, then a humidity pass with 0.25 m²·K/W (the window frame retaining 0.13 m²·K/W). The external linear coefficient Ψe, internal coefficient Ψi, surface temperature factor fRsi, and dew point temperature are determined in a fraction of second.
The tool compares the calculated value of Ψe against the reference thresholds you enter. It indicates whether the obtained value is 'less than or equal to' or 'greater than' the target. A three-level verdict signals whether the cold spot remains above the critical temperature, presents a mold risk, or causes surface condensation.
Balcony, Window, and Blind: The Most Frequent Details
The first three junctions cover classic facade openings and projections: the cantilevered balcony slab, the embrasure with window sill, and the lintel with slat blind box.
For the balcony, the comparator contrasts the continuous slab with the thermal break detail (80 mm or 120 mm high performance): it displays Ψe, fRsi, surface temperature, and annual loss. The takeoff gives the length of thermal break to order.
On the embrasure, you choose the section (sill or jamb), the window position in the wall, and the insulation return; the frame and glazing are treated as a homogeneous equivalent assembly. The lintel with blind box represents the box by an equivalent air layer, with an insulating lining that you can remove for comparison.
Wall Base, Parapet, and Roof: The Envelope Edge
Edge connections delimit the heated volume facing the ground, flat roofs, and attics. The catalogue offers three templates for these transitions:
- wall base on unheated basement: the lower slab meets the facade masonry; the unheated space is treated as exterior and the ground is not modeled; you can test a load-bearing insulation block at the masonry base, insulation under the slab, and perimeter insulation;
- flat roof parapet: slab, roof insulation, and concrete upstand, bare or insulated on three sides;
- facade and pitched roof: section along a chevron axis, without slope, with wall plate, chevron, and over-rafter insulation.
The classic mistake on the parapet consists of interrupting the insulation under the coping: the isotherms show heat escaping through the wall head and the cold spot appearing on the top floor ceiling.
Interior Insulation, Corner, and Pillar: Renovation and Masonry
In old building rehabilitation, interior insulation poses specific difficulties regarding intermediate floor transitions. The interior insulation slab template represents the concrete slab crossing the interior insulation. The comparator allows testing an insulation return strip under the ceiling and along the floor and reading how it shifts the cold spot.
The protruding corner template analyzes the concentration of geometric fluxes on a building edge or around a reinforced concrete load-bearing pillar. The user can substitute clay brick, old masonry, or concrete with one of the eighteen integrated materials (graphite EPS, mineral wool, XPS, PIR, aerogel, cellular glass). Each conductivity remains modifiable according to the manufacturer's declared value.
On these walls, the linear coefficient Ψe may appear negative due to the external measurement convention. The studio keeps the real value without arbitrary clipping, while leaving a checkbox if you wish to neutralize negative values.
Free Editor: When No Template Fits
When the construction site geometry deviates from the eight standard profiles, the free editor allows assembling rectangular blocks on a 5 mm grid. You assign each block a material (or entered conductivity), place the environments (interior, exterior, unheated room) which set the boundary conditions, and indicate adjacent common walls with their lengths at exterior and interior dimensions.
The solver recalculates upon each modification; the probe displays the temperature and flux density under the cursor, and a pin locates the coldest point of the interior faces. A material face touching no environment is adiabatic, which allows tracing section plans.
From Calculation to File: Quantities, Report, and Pricing in Pro Version
Use of this studio is free, without registration and without account creation. All calculations run within your web browser: no file is transmitted to a remote server and no data is stored in the local memory of the workstation. Closing the tab clears the study. You can print a summary sheet featuring the cross-section view, thermal map, and physical quantities with an Art Construction watermark, or export values in CSV format.
This 2D calculator constitutes a design aid tool. It does not replace the expertise of a building physicist nor the formal decision of the permit-issuing authority. In Switzerland, the prevention of construction defects is incumbent upon builders according to the Code of Obligations (CO) and the rules of the SIA 118 standard when agreed upon. The professional who notes a condensation risk during execution plan review must inform the site management.
To integrate these junctions into your project management, discover our professional tools on our company portal. The Pro version allows saving your variants on a centralized cloud construction site, loading existing files, and collaborating with others. It unlocks the export of watermark-free reports in your colors and directly links measured lengths to our tender pricing module. To move from thermal takeoff to detailed quote with the ACIP price base, check out the management options on our subscription offers.
Frequently asked questions
Do the eight junctions correspond to official SIA details?
No. Art Construction is independent of SIA and CRB. The eight templates are configurable geometric configurations calculated by the studio's 2D solver. The limit and target values proposed by default are taken from the studio booklet for SIA 380/1 standard and mold risk, but you must check and adapt each value according to your project's contractual requirements.
How does the studio signal mold risk?
The engine performs a humidity pass with an interior surface resistance of 0.25 m²·K/W. It determines the minimum surface temperature, dew point, and critical mold temperature at the indicated relative humidity. The tool displays a clear status: risk-free temperature, appearance of mold risk, or direct liquid condensation.
Are my files and sections sent to a server?
No. In this free version, all meshing and thermal resolution take place exclusively within your web browser. No coordinates or dimensions are sent to a remote server, and nothing is kept in your browser's memory. If you close or reload the page, your data is entirely erased.
Why does the Ψe value sometimes appear negative?
The calculation applies the formula Ψe = L2D − Σ U·l by measuring walls by their external dimensions. On certain connections like protruding corners or roofs, the developed external surface is greater than the internal surface, which can lead to a real flux lower than the sum of common walls. The studio does not clip this figure unless you check the dedicated option.
Does the solver handle point thermal bridges like fixations?
No. The solver operates in steady-state two-dimensional conditions. It models continuous linear sections perpendicular to the section plane. Singular three-dimensional points, such as the junction of three walls or through-fixing anchors, require other analysis methods and are not supported by this studio.
Can the results be used as official insulation justification?
The studio provides technical decision support during the development of construction details. It has not been validated by a third-party body and does not replace a building physicist's report or formal control authority validation. In Swiss law, design responsibility falls under the rules of the Code of Obligations (CO).
What functions does the paid version bring for thermal bridges?
The Pro version allows saving your sections in the ERP, working together on the same construction site, and generating complete PDF reports without watermarks with your contact details. It also allows automatically associating thermal break or insulation lengths calculated by the studio with the server-side ACIP price base to price your tenders.