The junction between the façade and the pitched roof combines three difficulties: the timber wall plate laid on the wall, the rafters that cross it to form the eaves, and two different trades, the façade installer and the carpenter, each fitting their own insulation. If the façade insulation stops below the wall plate and the roof insulation starts above it, a strip of timber and masonry is left where the heat escapes, along the whole length of the façade.
The “Façade and pitched roof” template of the 2D Thermal Bridges studio draws the eaves in a section along a rafter: wall, façade insulation, wall plate, rafter, insulation over the rafters and roof overhang. The section is squared off, without a pitch. The studio calculates Ψe, Ψi, L2D and the fRsi factor at the cold spot of the ceiling. For the U-value of the roof insulated between rafters itself, see the Insulation studio page on roofs insulated between rafters: only the junction is covered here.
Worked example: U-values of the two elements and reading Ψ
A house with a pitched roof insulated over the rafters. Wall: 10 mm plaster, 175 mm perforated brick, 160 mm insulation, 10 mm render. Roof: 15 mm plasterboard, 200 mm wood fibre boards over the rafters, 20 mm wood fibre sarking board. The conductivities are example values, to be replaced by the manufacturer’s.
| Element | Calculation of the total resistance RT | RT (m²K/W) | U = 1 / RT (W/(m²K)) |
|---|---|---|---|
| Wall (Rsi 0.13; Rse 0.04) | 0.13 + 0.01/0.40 + 0.175/0.44 + 0.16/0.032 + 0.01/0.87 + 0.04 | 5.604 | 0.178 |
| Roof (Rsi 0.10; Rse 0.04) | 0.10 + 0.015/0.25 + 0.20/0.040 + 0.020/0.045 + 0.04 | 5.644 | 0.177 |
| Junction, example L2D reading | value assumed to be shown by the studio | – | L2D = 0.62 W/(m·K) |
| Ψe = L2D − Σ U·l (external dimensions) | 0.62 − (0.178 × 1.50 + 0.177 × 1.20) | – | Ψe = 0.14 W/(m·K) |
For the wall: 0.13 + 0.025 + 0.398 + 5.000 + 0.011 + 0.04 = 5.604 m²K/W, so U = 1 / 5.604 = 0.178 W/(m²K). For the roof: 0.10 + 0.060 + 5.000 + 0.444 + 0.04 = 5.644 m²K/W, so U = 0.177 W/(m²K). The surface resistances are the usual values for a wall (horizontal flow) and a roof (upward flow).
Suppose the studio shows L2D = 0.62 W/(m·K) for this junction, with reference lengths of 1.50 m for the wall and 1.20 m for the roof on external dimensions. The plain elements account for 0.178 × 1.50 + 0.177 × 1.20 = 0.267 + 0.212 = 0.479 W/(m·K); the remainder, 0.62 − 0.479 = 0.14 W/(m·K), is the loss specific to the junction. The studio’s “Adjoining elements” tab shows these U-values and lengths so that you can redo the calculation by hand.
Ψ is not a property of the eaves alone: it is what remains of L2D once the losses of the plain elements have been taken out, using the reference lengths of the chosen convention.
3 common mistakes at the façade-to-roof junction
Leaving an uninsulated strip below the wall plate
The façade installer stops the insulation below the wall plate, the carpenter lays theirs on the rafters: in between, the wall head and the wall plate are left bare. Decide before the works who carries the insulation up to the roof board, and check it before the sarking membrane is laid.
Counting the overhang as a heated area
The roof overhang lies outside the envelope: it must not be included in the roof area for the plain elements. The reference lengths in the “Adjoining elements” tab stop at the envelope; use the same ones in your energy balance.
Forgetting airtightness at the foot of the roof
The joint between the roof vapour retarder and the internal plaster of the wall is a common air leakage point. The 2D calculation covers conduction only: a leaky joint brings moist air into the roof, which the temperature map does not show.
How to model the façade-to-roof junction in 3 steps
- Choose the “Façade and pitched roof” template
Set the thickness of the wall and its insulation, the thickness and type of roof insulation, the rafter depth and the roof overhang. Replace the starting conductivities with the manufacturer’s values. - Enter the climate and the length of the junction
Enter the internal and external temperatures, the humidity, the length of the façade concerned and the heating degree-days for your location: the studio derives the annual loss of the junction. - Compare and check the ceiling
In “Before / after”, compare façade insulation stopped below the wall plate with insulation carried up to the roof. Check the cold spot and the fRsi factor at the ceiling corner, then print the sheet or export to CSV.
What the free version does not do for the eaves
The section is taken along a rafter and without a pitch: the effect of rafters spaced apart, the ventilation of the sarking and air leakage are not calculated. Conductivities, temperatures and degree-days are starting values to be checked. The result supports a decision; it is not a signed energy statement. Nothing is saved.
With Soumissions, the junction insulation goes into the items of the façade or roofing tender. The ERP tracks the hours and the invoicing, and the Portail chantier keeps the detail sheet with the site for coordination between the façade installer and the carpenter.
Frequently asked questions
Why does the studio section have no pitch?
The template squares off the junction to calculate it on a rectangular grid. The result gives the order of magnitude of the thermal bridge and lets you compare variants; for a very steep roof, a detailed calculation by a specialist is still needed.
Should the roof overhang be insulated?
No, the overhang is outside the envelope. What matters is the continuity of the insulation between the wall and the roof at the wall plate; the overhang mainly protects the façade from rain.
How does the studio get from L2D to Ψ?
It subtracts from L2D the sum of the U-values of the plain elements multiplied by their reference lengths: Ψ = L2D − Σ U·l. It does so on external (Ψe) and internal (Ψi) dimensions and shows the lengths so that you can check.
Does the studio check the ventilation of the sarking?
No. It calculates conduction in the section. The ventilated gap under the roof covering, its air inlet at the eaves and its outlet at the ridge fall under the roofing rules.