Free software · 100% in your browser · no data sent

Ψe, Ψi and L2D: understanding the linear coefficient and its negative values

The same junction gives two Ψ values, one of them sometimes negative: it all depends on the reference lengths used for the plain elements.

Open the free studio →

Free, no account: your walls and your calculations stay in your browser.

A two-dimensional thermal bridge calculation first gives an overall value, the coupling coefficient L2D: the heat passing through the whole section, per metre of length and per degree of temperature difference. The Ψ coefficient is simply what remains of L2D once the losses of the plain elements, calculated with their U-value, have been taken out. Since these losses depend on the reference lengths, measured on external or internal dimensions, the same junction gives two Ψ values.

The 2D Thermal Bridges studio shows L2D, Ψe on external dimensions and Ψi on internal dimensions, and the “Adjoining elements” tab gives the U-value and the lengths of each element so that the calculation can be redone by hand. For the solver itself and its plain-wall test case, and for reading the fRsi factor, see the linked pages: here, you learn to read and report the right Ψ value.

Worked example: an external corner read on external and internal dimensions

An external wall corner in horizontal section: 10 mm plaster, 175 mm brick, 160 mm insulation, 10 mm render, i.e. 355 mm thick. U of the plain wall: 1 / 5.604 = 0.1784 W/(m²K) (example values). Each leg of the section measures 1.000 m on the inside and 1.355 m on the outside. Suppose the studio shows L2D = 0.43 W/(m·K).

Ψ = L2D − Σ U·l by measuring convention (example values)
QuantityExternal dimensionsInternal dimensions
L2D (read in the studio, example)0.43 W/(m·K)0.43 W/(m·K)
Total reference length2 × 1.355 = 2.710 m2 × 1.000 = 2.000 m
Σ U·l of the plain elements0.1784 × 2.710 = 0.4830.1784 × 2.000 = 0.357
Ψ = L2D − Σ U·lΨe = −0.053 W/(m·K)Ψi = +0.073 W/(m·K)

On external dimensions, the plain elements count 2.710 m of wall, i.e. 0.483 W/(m·K): more than the 0.43 W/(m·K) actually transmitted by the section. The remainder is therefore negative, Ψe = 0.43 − 0.483 = −0.053 W/(m·K). On internal dimensions, the elements count only 2.000 m, i.e. 0.357 W/(m·K), and Ψi = 0.43 − 0.357 = +0.073 W/(m·K).

Both conventions give the same total loss if they are applied consistently: the difference between Ψi and Ψe, 0.073 − (−0.053) = 0.126 W/(m·K), is exactly the extra wall counted on external dimensions, 0.1784 × 0.710 = 0.127 W/(m·K) allowing for rounding.

A negative Ψe is not an error: it corrects the external areas counted twice in the plain elements, and it is reported as it is in a balance based on external dimensions.

3 common mistakes when reporting a Ψ value

Mixing measuring conventions

Reporting a Ψi in a balance whose areas are measured on external dimensions counts part of the losses twice. The measuring convention is set by the calculation method of your energy statement; check it in SIA 380/1 and the cantonal form, then keep it for every detail.

Setting negative Ψe values to zero

Clipping a negative Ψe to zero overestimates the building’s losses. The studio only clips if you tick the option; unless your energy statement says otherwise, keep the negative value.

Comparing a Ψ calculated with other element lengths

A Ψ depends on the U-values and lengths of the adjoining elements used. A catalogue value calculated for another insulation thickness or other lengths cannot be compared without care: read the “Adjoining elements” tab again.

How to read Ψe, Ψi and L2D in 3 steps

  1. Calculate the detail in the studio
    Choose the template, set the geometry and materials and run the calculation. The map shows L2D, Ψe and Ψi, as well as the fRsi factor at the cold spot.
  2. Open the “Adjoining elements” tab
    Note for each plain element its U-value and its reference length on external and internal dimensions. Redo Ψ = L2D − Σ U·l by hand to check the value you are going to report.
  3. Report the value of the right convention
    Report Ψe if your balance measures the envelope on external dimensions, Ψi if it measures it on internal dimensions. Print the sheet or export to CSV with both values to keep a record of the choice.

Open the free studio →

What the free version does not do for reading Ψ

The studio calculates linear thermal bridges in two dimensions; singular points, the point coefficients χ, are not handled. The solver is checked against analytical solutions, but the reference cases of EN ISO 10211 have not been rerun. Conductivities and temperatures are starting values to be checked. The result supports a decision; it does not replace a building physicist’s signed report. Nothing is saved.

With Soumissions, the quantities of the corrective solution go into the tender items. The ERP tracks the site and the invoicing, and the Portail chantier files the calculation sheets by site for the architect and the client.

Frequently asked questions

Why does the studio give two Ψ values?

Because Ψ depends on the reference lengths of the plain elements. On external dimensions, the elements are longer, their calculated loss larger and Ψe smaller; on internal dimensions, the reverse. Both are correct within their convention.

Does a negative Ψ mean the junction gains heat?

No. It means the plain-element calculation on external dimensions already overestimates the loss, and the junction corrects this overestimate. The building’s total loss remains positive.

What is the L2D coefficient?

It is the heat passing through the whole calculated section, in watts per metre of length and per kelvin of difference between inside and outside. It contains the plain elements and the junction; Ψ is obtained by taking out the elements.

Which value goes into an energy statement?

The one matching the measuring convention of your calculation method. Check it in SIA 380/1 and in the cantonal form; if in doubt, report both values with their convention and ask the person responsible for the statement.