Between-rafter insulated roof: U-value, summer phase shift and condensation

Calculate the U-value of your between-rafter roof and summer phase shift. Free online construction site tool in the browser, no account needed.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

Between-rafter insulation: what the studio calculates for a pitched roof

Insulating converted attic spaces requires special attention to the composition of the layers. This page opens the Insulation Studio directly on the pitched roof between-rafters preset. The starting configuration presents a typical cross-section, ordered from the inside out: plasterboard, variable vapor control layer, wood fibre insulation placed between the roof rafters, and then a water vapour permeable under-roof membrane. You can modify each material, adjust thicknesses and enter your own technical values.

The tool calculates the roof's U-value, its total thickness and its surface mass. A KBOB ecological assessment is also offered for components that correspond to inventory data from the KBOB list. For insulation selection, a Swiss product catalogue is integrated as a static file updated weekly. Characteristics come from manufacturers' declarations of performance and show only thicknesses actually produced on the market. In the absence of this file, generic materials remain accessible for testing the composition.

The framing layer: rafters, surface share and combined method

In a pitched roof, the timber framing runs through the thickness of the main insulation. The studio handles this heterogeneous layer using the combined method. You enter the thermal conductivity of the rafter wood as well as the relative surface share occupied by the rafters. In framing practice, this share is usually between five and fifteen hundredths of the total roof surface.

The studio calculates and displays the upper thermal resistance limit, the lower limit, and their ratio. If the pieces of wood are too conductive or if the entered data falls outside the application scope of the combined method, an explicit warning appears on screen. Similarly, if you define several successive layers incorporating framing, the studio displays an alert: only the first framing layer is subject to this analytical treatment, while subsequent ones cannot be combined simultaneously in this calculation mode.

Roof U-value: upward heat flow and entered limit value

For a pitched roof, heat loss occurs mainly from bottom to top. The U-value calculation therefore incorporates the internal and external surface thermal resistances associated with an upward heat flow. This overall thermal transmittance coefficient depends on the addition of the resistances of the different layers, including the equivalent resistance of the between-rafter span calculated using the combined method.

The obtained result is compared against a limit value that you choose to apply. The studio offers presets derived from the requirements of the MuKEn 2025 (MoPEC 2025) and the Buildings Programme, recorded at the source on 17 November 2026, or allows you to freely enter a target value. The tool simply indicates whether the calculated U-value is less than or equal to, or greater than this reference. It does not use approving wording: the check remains a simple arithmetic comparison.

Summer phase shift and damping: attic comfort

Under roof slopes, summer overheating represents a real risk for inhabited rooms. The studio calculates the summer phase shift expressed in hours as well as the damping factor of the external heat wave. This calculation is based on a periodic transfer matrix established over a twenty-four-hour cycle. For each roof layer, the density and specific heat capacity remain fully editable, allowing the observation of the effect of dense materials compared to lighter insulants.

When the calculated transfer time exceeds the duration of a complete daily cycle, the studio displays a warning stating that the phase shift exceeds twenty-four hours. This physical data helps the carpenter or trade master to dose the envelope's inertia, in order to shift the arrival of the heat peak towards nighttime hours favorable to the natural ventilation of the attic.

Vapor control layer, under-roof and wood: twelve-month condensation

The durability of the timber framing depends on moisture management through the assemblies. The studio applies the Glaser method to simulate hygrothermal behaviour over the twelve months of the year. You can display the vapour pressure diagram for the selected month, observe the accumulated liquid water quantities and check potential drying during the summer period. Initial climatic conditions correspond to a modifiable example and do not constitute a specific weather station record.

The behaviour of the variable vapour control layer is taken into consideration by applying the water vapour permeability curve indicated in its technical documentation. The studio generates a visual alert as soon as interstitial condensation reaches a putrescible material, such as rafter wood or plant fibre insulation boards. This warning helps fine-tune the choice of vapour control layer and under-roof.

What the free version does not do for a roof

The free version works without registration and without a user account. The program runs entirely within your browser: no files are sent to a server, nothing is stored in your browser's memory, and reloading or closing your tab immediately deletes all data. Printed sheets feature a watermark in the name of Art Construction and CSV exports display the mention of the free version. In addition, this version does not provide any unit prices: only the prices you enter yourself in the measurement count.

This module also presents technical limitations to be taken into account before any execution decision:

  • The calculation is carried out in a single dimension and under steady-state conditions: it models neither three-dimensional calculations nor linear thermal bridges specific to ridge, verge, valley or eaves junctions.
  • Hygrometry evaluates only transfer by vapour diffusion on a single potential condensation plane, without considering capillary absorption, drying by capillarity or air infiltrations due to installation defects.
  • The bill of quantities automatically proposed by the tool for this preset takes up the typical items of interior lining (framings, plasterboard, airtightness) and must be checked item by item to match the actual work of a roof.
  • The quantities assigned to generic materials provide indicative orders of magnitude; entering actual characteristics from manufacturer data sheets is essential for each project.
  • The software does not replace any normative document. In the field of building thermal physics and moisture, the reference technical text for professionals remains SIA 180, to be consulted in its force edition.
  • Numerical results represent an aid to technical study and replace neither the intervention of a specialized engineer, nor physical laboratory tests, nor the decision of administrative services.

Switch to Tenders or the ERP to keep the roof by construction site

The free version allows you to test the physics of the roof assembly; to continue studying from one construction site to another, you need to be able to keep it. With Tenders and the ERP, you can save the roof by construction site, in the ERP, with successive versions, and resume the study at any time.

The insulation report prints as a PDF with your company letterhead, without a watermark, and the unit prices entered in the measurement are saved with the project. To discover these functions, consult Tenders or the ERP.

Frequently asked questions

How to enter the surface share occupied by the rafters?

In the framing layer panel, you enter the proportion occupied by the wood as a decimal. For conventional framing, this share is generally between 0.05 and 0.15 of the total roof surface. This value is used to weight the thermal conductivity of the wood and that of the insulation according to the combined method.

Where do the data from the Swiss product catalogue come from?

Catalogue information comes from a static file updated weekly. This file compiles technical values published on performance declaration sheets provided by manufacturers. In addition, the catalogue offers only insulation thicknesses actually produced for the Swiss market.

Why does an alert appear on plant fibre insulation?

The Glaser method calculates the potential appearance of condensation month by month. If liquid water appears in contact with a putrescible material, such as rafter wood or bio-based insulation, the studio triggers a warning indicating the risk of biological deterioration at that precise location on the roof.

Does the studio validate the legal requirements of my roof?

No. Art Construction is independent of SIA and CRB. The studio does not issue any approval or certification opinion. It simply compares the obtained result to the target value you entered, specifying whether the calculated coefficient is less than or equal to, or greater than this limit.

What happens if I reload the browser page?

The calculation runs entirely within the browser without storage on a remote server. If you close or reload your tab, all entered layers, thicknesses and custom settings are erased without the possibility of recovery in the free version.

Why doesn't the condensation calculation take air leaks into account?

The Glaser analytical model evaluates only moisture transfer through continuous water vapour diffusion through assemblies. It does not take into consideration moisture transport caused by parasite air infiltrations related to airtightness defects of the vapour control layer.

What does the paid version allow for a roof?

The free version generates measurement items without any prices, and you can enter your own unit prices there. The paid version, in Tenders and ERP, saves the roof by construction site with all its versions, and produces a report without a watermark with your company letterhead.