Table of contents
The 3 Major Site Risks
- Financial / Margin: A site shutdown ordered during an inspection for uncontrolled dust emissions generates standby costs in the range of 3 500 to 12 000 CHF per working day depending on team size, as well as remediation of contaminated areas at the contractor's expense in accordance with standard SIA 118.
- Legal / Parity / SUVA: Non-compliance with dust capture regulations exposes the employer to penalties under art. 82 LAA and art. 3 OPA concerning the prevention of occupational illnesses, while wilful endangerment falls under art. 229 CP in the event of breaches of the recognised rules of construction.
- Administrative / Acceptance: The spread of quartz dust or mineral fibres into adjacent premises or service ducts can jeopardise joint inspection of the work under standard SIA 118 and lead to formal refusal of acceptance records by the site management.
This technical guide is intended for site managers, general contractors and foremen operating in Switzerland who need to size their on-tool and air extraction systems in accordance with the requirements of the Swiss National Accident Insurance Fund. The distinction between a class M industrial dust extractor and a class H filtration unit fitted with a terminal high-efficiency particulate air filter rests on the intrinsic toxicity of inhalable particles and on occupational exposure limit values defined in the SUVA exposure limits tables. While class M represents the mandatory minimum standard for mineral crystalline silica dust generated by concrete cutting, grinding or core drilling, class H is required whenever work involves asbestos-containing materials or highly pathogenic moulds pursuant to art. 33 OTConst on air quality.
The rigorous application of preventive measures is part of the work planning mandated by art. 3 OTConst, requiring the contractor to assess all necessary measures prior to signing the construction contract. During an unannounced site inspection, inspectors review the entire dust control chain: compliance of the machine certificate under the Swiss Machinery Ordinance, presence of an automatic filter-cleaning system to prevent primary filter blinding, minimum air velocity inside the suction hose, and sealed dust disposal methods. When interventions involve flocking, thermal insulation or asbestos-containing tile adhesives, art. 32 OTConst and art. 82 OTConst impose specific containment protocols, restricting dust-emitting tasks to recognized specialist contractors.
Technical and regulatory criteria for selecting dust extraction equipment
Selecting between a class M mobile dust extractor and a class H unit is not a matter of convenience on site, but a strict compliance requirement driven by the mineral or fibrous nature of the dust generated. Pursuant to art. 82 LAA, the employer must, to prevent occupational accidents and illnesses, apply all measures whose necessity has been proven by experience, which are feasible according to current state of the art, and which are appropriate to the prevailing conditions. Workplace planning requires evaluating the expected aerosol concentration and the potential presence of respirable crystalline silica originating from concrete or mortars.
Under art. 3 OPA, the employer must take all protective measures and precautions that satisfy the provisions of the ordinance, other applicable occupational safety rules, and recognised occupational health and safety standards. Art. 33 OTConst specifies that ambient air at workstations must contain between 19 and 21 % oxygen by volume and that limit values for hazardous substances must not be exceeded. Hazardous substances must be evacuated to the open air, filtered, or diluted by mechanical ventilation, and air quality must be checked on a regular basis. If these technical or organizational measures are insufficient, personal respiratory protective equipment must be used.
Mandatory specifications for class M extractors
Class M is mandatory on Swiss construction sites for quartz, brick, plaster and hardwood dust. These units must feature a certified very low maximum permeability rate and include an integrated audible or visual warning signal that alerts workers whenever the airflow drops below a critical threshold. This automatic monitoring ensures a constant extraction velocity within the hose connected to the power tool, preventing fine particulate matter from dispersing into the breathing zone of masons or plasterers.
The filtration system must be supported by automatic filter cleaning via reverse air pulses or electromagnetic shaking without opening the container. Without this active mechanism, filter pores quickly become clogged by fine dust from smoothing compounds or core drilling, causing suction pressure to collapse within minutes and rendering extraction useless. The collection bag must ensure dust-free disposal so that operators are not exposed to dust when changing bags.
Required specifications for class H and asbestos abatement
Whenever building materials contain asbestos fibres, a class H unit equipped with high-efficiency terminal filtration is the only permissible configuration. Under art. 32 OTConst, if the presence of particularly hazardous substances such as asbestos or PCBs is suspected, the employer must take the required identification measures and inform workers of the survey results. If such a substance is discovered unexpectedly, work must be suspended immediately and the client or its representative notified.
Class H units intended for asbestos removal or remediation work must be engineered with fully hermetic motor housings. Exhaust air passes through a certified absolute filter stage capable of trapping microscopic fibres invisible to the naked eye. In addition, under art. 82 OTConst, works that release substantial amounts of health-hazardous asbestos fibres into the air may only be carried out by asbestos abatement contractors recognized by SUVA. Air extractors deployed in this context require strict decontamination procedures and the use of dedicated disposal bags with heat seals or double airtight ties.
Comparative overview of site air filtration equipment
| Equipment category | Key technical requirements | Typical use on Swiss construction sites | Key checkpoints during an inspection |
|---|---|---|---|
| Class M mobile dust extractor | Integrated airflow monitoring alarm, automatic filter cleaning, mineral dust filtration | Brick wall chasing, cement screed grinding, concrete sawing, general structural work clean-up | Operation of acoustic low-pressure alarm, seal integrity of collection bag in the tank |
| Class H mobile dust extractor | Certified high-efficiency absolute terminal filter, airtight casing, critical filter-clogging alarm | Remediation of asbestos-containing elements, bituminous adhesive removal, renovation involving fibres | Up-to-date filter certificate, zero air leakage around motor housing seals |
| Negative air machine / Air scrubber | Maintains negative pressure in containment zones, multi-stage pre-filtration and suitable terminal filter | Interior renovation in occupied buildings, drilling service ducts in rental properties | Negative pressure differential measurement in containment, fouling level of primary filter stages |
| On-tool dust extraction shroud | Enclosing shroud adapted to blade or core drill bit, direct extraction port to antistatic hose | Dry core drilling, concrete slab surfacing, sand-lime masonry cutting | Shroud kept continuously fitted during operation, absence of unsealed air bypasses |
| Stationary air treatment unit | Forced mechanical ventilation, continuous fresh air volume flow with ducted extraction | Underground construction, deep building excavations, enclosed utility galleries | Oxygen content compliance under art. 33 OTConst, effective dilution of atmospheric contaminants |
Frequent procurement errors and operating costs
A common mistake consists of purchasing class L workshop extractors for masonry sawing or grinding operations. Class L lacks an airflow warning alarm, and its filter cartridges let an excessive amount of fine quartz dust pass through. During an inspection by SUVA or a joint parity commission, unsuitable equipment leads to an immediate shutdown of the dust-generating task until the installation is brought into compliance, generating team waiting costs in the range of 1 200 to 4 500 CHF per half-day.
The second recurring failure concerns the absence of programmable automatic filter cleaning. Using a standard filter when grinding gypsum plaster or fresh concrete clogs the membrane in less than fifteen minutes. The operator inadvertently reduces dust extraction flow by more than 70 %, dispersing mineral aerosols throughout the room. Beyond premature wear on the vacuum motor—costing roughly 400 to 900 CHF to replace—this habit reduces visibility and exposes personnel to dust levels incompatible with occupational health requirements.
The third error involves the disposal of waste from contaminated materials. Emptying a collection drum in the open air or using standard, unsealed refuse bags releases a dense cloud of respirable dust across the site storage area. Calling in a specialist decontamination firm to clean and vacuum contaminated common areas represents an unforeseen expense of 2 500 to 8 000 CHF, strictly excluded from fee accounts and entirely chargeable to the defaulting contractor.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The following scenarios are illustrative examples designed to guide practical methodological choices on site and do not represent actual projects.
Scenario 1: Floor surfacing in the canton of Vaud
On an office building conversion site in Lausanne, a finishing work contractor deploys a team of 4 workers to machine-grind 450 m² of old cement screeds. The work planning prepared under art. 3 OTConst—which requires work to be planned so that the risk of occupational accident, occupational illness, or harm to health is kept as low as possible—strictly ruled out dry grinding without continuous vacuum extraction.
The contractor deployed two class M dust extractors connected directly to the floor grinders using dust hoods with perimeter brushes. The units feature continuous electromagnetic filter cleaning and antistatic hoses. The competent safety officer appointed under art. 5 OTConst verifies the acoustic clogging alarm every morning and ensures the use of sealed, reinforced synthetic disposal bags. Ambient air monitoring confirms that airborne dust remains below critical mineral dust thresholds, avoiding the need for permanent heavy respiratory masks inside the surfacing area.
Scenario 2: Housing estate renovation in the canton of Geneva
In Carouge, a refurbishment project across 12 occupied apartments requires chasing walls in old masonry to run plumbing and electrical services. Two electricians carry out the cutting work. Preliminary risk detection revealed traces of asbestos in skirting board levelling mortars on two floors, triggering the strict application of art. 32 OTConst.
For areas free of hazardous pollutants, a dual-blade wall chaser is coupled with a certified class M extractor. In rooms containing asbestos residues, work is paused and handed over to a certified asbestos removal contractor using mobile class H extractors fitted with HEPA terminal filters and negative pressure air scrubbers. This strict protocol prevents fibre migration into adjacent living quarters, protects workers, and guarantees full compliance during inspections by labour authorities.
Scenario 3: Concrete excavation and core drilling in the Canton of Valais
In Sion, a team of 3 masons performs large-diameter core drilling and underpinning work in the basement of a commercial building. Due to the confined space of the lower level and the absence of cross ventilation, the employer applies art. 33 OTConst by installing mechanical ventilation combined with class M dust extractors connected directly to the diamond core bits and rotary hammers.
The equipment includes a multi-dust filtration system with differential pressure sensors. The construction site protocol requires the immediate stoppage of the tool as soon as the airflow drops below the warning threshold, protecting the masons from respirable quartz concentrations. Thanks to these technical measures, air quality monitoring confirms continuous compliance of air hygiene parameters with applicable federal regulations.
Free construction site calculators
Thirty-five trade calculators: site installations, waste, concrete, screeds, insulation, scaffolding. No sign-up required.
Frequently asked questions
Is a class L dust extractor sufficient for cutting concrete on a Swiss construction site?
No. Concrete releases crystalline quartz whose respirable dust poses a major respiratory hazard. SUVA requires at least class M, equipped with airflow monitoring and airtight disposal bags. A class L unit allows too many fine particles to pass through and exposes the contractor to a warning during an inspection. The investment for a compliant vacuum cleaner amounts to an illustrative figure of around 850 CHF.
Can a class M vacuum fitted with a HEPA filter be used for asbestos remediation?
No, art. 82 OTConst restricts work that releases significant amounts of fibres to recognised specialised firms. Even outside this scope, asbestos requires certified class H equipment featuring a dust-free disposal system. Retrofitting a class M unit offers no guarantee of overall airtightness. Hiring a certified class H extractor costs an illustrative amount of around 140 CHF per day.
What does a SUVA inspector check regarding air velocity in the extraction hose?
The inspector checks for the presence of an audible or visual alarm. Under safety regulations, this device warns the operator as soon as the air speed drops below the effective extraction threshold. The employer must be able to demonstrate that this sensor works correctly during grinding or wall-chasing operations to comply with the general prevention rules set out in art. 82 LAA.
What filter maintenance obligations apply under Swiss regulations?
The employer applies art. 3 OPA to ensure protective equipment remains in perfect working order. Filter cartridges must be replaced while wearing suitable respiratory protection, without shaking the contaminated elements. Saturated bags must be disposed of in sealed, airtight containers. For an inventory of three machines, the average annual cost of consumables represents an expense of around 600 CHF.
How should you respond if suspect materials are discovered during drilling without a prior diagnostic survey?
In the event of an unexpected discovery of a hazardous substance, art. 32 OTConst requires work to be stopped immediately and the client or its representative to be informed. Any renovation construction site dating from before 1990 requires this precaution. The employer arranges for testing by a certified laboratory before resuming drilling with a suitable class H dust extractor, thereby preventing workers from being exposed to fibres.
Can the contractor bill the cost of a class M dust extractor to the client?
Under art. 364 CO, the contractor provides the necessary equipment, machinery and tools at its own expense, unless trade custom or the contract specifies otherwise. Dust extraction units are part of the standard plant of a general contractor or a trade contractor. However, if specific containment measures are agreed in the works contract for a particular construction site, their compensation is set out in a detailed bill item of around 1200 CHF.
Making a strict distinction between class M for common mineral dusts and class H for work involving asbestos protects workers' health and shields the firm from work stoppages ordered by the authorities. To equip your teams and make your work methods safe in compliance with Swiss directives, consult our professional guides and tools:
- Industrial Dust Extraction and Air Cleaning on Swiss Sites: Dust Classes L, M and H (SUVA)
- Regulatory Swiss Construction Site Vacuum Cleaner Selector (Class L, M or H / HEPA H14) Based on Dust & SUVA OELs
- Power-Tool Triggered Dust Extractors with Automatic Filter Cleaning: Working Without Suction Loss on Wall Chasers and Concrete Grinders
- Mobile Negative Air Units: Containing Dust in Occupied Renovation Sites