Free software · 100% in your browser · no data sent

Impact sound under SIA 181: floating screed, resilient layer and perimeter strip

The same slab can give 39 dB or 50 dB of impact sound: the chosen resilient layer and a well-fitted perimeter strip make all the difference.

Open the free studio →

Free, no account: your walls and your calculations stay in your browser.

Footsteps, a chair dragged across the floor, a dropped object: impact sound is the first complaint between neighbours in a condominium. The SIA 181 standard limits it with a standardised impact sound level (L’nT,w, with its adaptation term) measured in the neighbouring flat, which must not exceed the required value for the requirement level. The main lever is the floating screed: a heavy screed laid on a resilient layer, fully decoupled from the slab and the walls.

The “Separating floor (condominium, impact sound)” preset of the Insulation studio estimates the level of the bare slab Ln,eq,0,w = 164 − 35·log10(m’ of the slab), the resonance of the floating screed f0 = 160·√(s’/m’ of the screed), the reduction ΔLw = 30·log10(500/f0) and the resulting L’n,w. A forgotten perimeter strip adds a deduction. You enter the requirement in decibels; the studio does not pre-fill any value from the standard and its results are indicative.

Worked example: a 200 mm slab and four resilient layers

200 mm reinforced concrete slab (ρ = 2 400 kg/m³, i.e. m’ = 480 kg/m²) and 60 mm cement screed (ρ = 2 000, i.e. m’ = 120 kg/m²). Resilient layers with a dynamic stiffness s’ between 7 and 30 MN/m³, example values to be taken from the product data sheet. Formulas as shown by the studio, without flanking transmission (K = 0).

Estimated L’n,w according to the dynamic stiffness of the resilient layer (bare slab: 70.2 dB)
Stiffness s’ (MN/m³)Resonance f0 (Hz)Reduction ΔLw (dB)Estimated L’n,w (dB)With forgotten perimeter strip (dB)
738.633.436.847.8
1046.231.039.150.1
2065.326.543.654.6
3080.023.946.357.3

Bare slab: 164 − 35 × log10(480) = 164 − 35 × 2.681 = 70.2 dB. With s’ = 10 MN/m³: f0 = 160 × √(10/120) = 160 × 0.2887 = 46.2 Hz; ΔLw = 30 × log10(500/46.2) = 30 × 1.034 = 31.0 dB; L’n,w = 70.2 − 31.0 = 39.1 dB. The softer the resilient layer (low s’), the lower the resonance and the greater the reduction.

If the screed touches the walls because the perimeter strip was trimmed off or forgotten, the studio adds 11 dB, in the middle of its deduction range of 8 to 14 dB: the floor with s’ = 10 goes from 39.1 to 50.1 dB. The right product is useless if the decoupling fails on site; it is often the tiler or the skirting fitter who restores the contact.

On this slab, a resilient layer of 10 MN/m³ gives about 39 dB; the same screed without a perimeter strip goes back up to 50 dB, i.e. 11 dB lost through one installation detail.

3 common mistakes with impact sound

Trimming the perimeter strip too early

The perimeter strip is cut only after the floor finish and the skirting are laid. Cut before, it lets the tiles or the adhesive bridge the screed and the wall.

Leaving sound bridges in the screed

A pipe set into both the screed and the slab, a door threshold poured in one piece or rubble under the resilient layer transmit impacts directly. Check the resilient layer before pouring.

Choosing the resilient layer by thickness

What counts is the dynamic stiffness s’, not the thickness or the thermal insulation. Two products of the same thickness can differ by several decibels.

How to use it in 3 steps

  1. Load the separating floor
    Choose the “Separating floor (condominium, impact sound)” preset: screed, resilient layer, load-bearing slab and finish are laid in order.
  2. Enter the real masses and the resilient layer
    Adjust the thickness and density of the slab and the screed, then the dynamic stiffness s’ of the resilient layer stated by the manufacturer.
  3. Compare with the requirement
    Enter the SIA 181 value required by your project file, test the forgotten perimeter strip, then print the results sheet for the site meeting.

Open the free studio →

What the free version does not do

The studio gives an indicative element L’n,w using formulas from the literature and adjustable constants; it does not calculate the standardised L’nT,w between two flats or transmission through the walls, and only an on-site measurement is authoritative. To check a required value in decibels, see also the SIA 181 acoustic checker in the tools hub.

With Soumissions, the floating screed becomes tender items priced with the price database; the ERP then tracks the site, the hours and the invoicing.

Frequently asked questions

Is a lower L’n,w better?

Yes. Impact sound is a transmitted level: the requirement sets a maximum value. Conversely, for airborne sound, the requirement sets a minimum value.

Is a soft floor covering enough?

A carpet reduces impacts, but the occupant can replace it. A floating screed on a resilient layer remains the lasting solution between flats.

How much is the perimeter strip deduction?

The studio applies 11 dB, the middle of its 8 to 14 dB range. It is an order of magnitude to show what is at stake, not a measured value.

Do I need a thicker resilient layer?

Not necessarily. First choose a low dynamic stiffness s’; thickness matters for flatness, loads and any thermal insulation.