The Buildings Programme (Programme Bâtiments) of the Confederation and the cantons supports the thermal insulation of the envelope of existing buildings: façade, roof, walls and floors against the ground. The contribution depends on common technical criteria and on conditions set by each canton, which handles the applications and the amounts. For the contractor, the technical point is simple to state: the insulated element must reach a maximum U-value and improve by a minimum margin. The administrative point is just as strict: the application is filed with the canton before works start.
The Insulation studio offers two presets read on the Buildings Programme website: insulation of the façade, roof and walls (U ≤ 0.20 W/(m²·K)) and walls and floors buried more than 2 m deep (U ≤ 0.25), with an improvement of at least 0.07 W/(m²·K). It compares the calculated U-value of the new wall with this threshold and gives the net area to enter in the application. It files nothing and does not calculate the amount: for the conditions in each canton, see the simulator in the tools hub.
Worked example: what thickness to get below 0.20 W/(m²·K)
Renovation of an old façade: 15 mm plaster (λ = 0.51), 300 mm solid brick (λ = 0.8), 20 mm render (λ = 0.87), insulated externally with glass wool of λ = 0.035 (example value, to be taken from the product data sheet). Rsi = 0.13 and Rse = 0.04 m²·K/W.
| Insulation thickness | RT (m²·K/W) | U-value (W/(m²·K)) | Criterion U ≤ 0.20 |
|---|---|---|---|
| 0 mm (existing state) | 0.597 | 1.674 | not met |
| 120 mm | 4.026 | 0.248 | not met |
| 140 mm | 4.597 | 0.218 | not met |
| 150 mm | 4.883 | 0.205 | borderline, not met |
| 160 mm | 5.169 | 0.193 | met |
Without insulation, RT = 0.13 + 0.0294 + 0.3750 + 0.0230 + 0.04 = 0.5974 m²·K/W, i.e. U = 1.674. With 160 mm, the insulation adds 0.160/0.035 = 4.571: RT = 5.169 and U = 0.193. With 150 mm, U = 0.2048 exceeds 0.20. Some cantons round the U-value to two decimals: do not count on this tolerance unless you have read it in their conditions.
The improvement is 1.674 − 0.193 = 1.481 W/(m²·K), well above the 0.07 required. This improvement criterion matters for an element that is already insulated: a roof at U = 0.24 brought down to 0.19 gains only 0.05 and does not meet this condition. The amount per square metre and any bonuses are set by the canton.
On this façade, 160 mm of glass wool at 0.035 gives U = 0.193 and meets the technical criterion; 150 mm stays just above the threshold.
3 common mistakes that cost the subsidy
Starting works before the decision
The application is filed before works start, on the portal or with the canton’s energy department. An early material order or scaffolding put up too soon can be enough for the file to be refused.
Calculating with the generic λ
The threshold is checked with the declared λ of the product actually installed. A less efficient product, swapped during the works, can push the U-value above 0.20.
Forgetting the minimum improvement
On an element that is already partly insulated, the final U-value can pass the threshold without the difference reaching 0.07 W/(m²·K). Calculate both states, before and after.
How to use it in 3 steps
- Describe the existing state
Enter the current wall layer by layer and note its U-value: it is used to justify the minimum improvement. - Choose the Buildings Programme preset
Select “Buildings Programme: insulation of the façade, roof and walls” or the preset for buried elements, then add insulation until you get “Lower or equal”. - Prepare the file
Enter the net area to be insulated, print the results sheet and attach it, with the technical data sheets, to the application filed before works start.
What the free version does not do
The studio checks the technical U-value criterion; it calculates neither the amount of the contribution nor the cantonal bonuses, and files no application. The conditions vary by canton and by year: read them again before signing. To estimate contributions by canton, see the subsidies simulator in the tools hub.
With Soumissions, the chosen insulation becomes a priced tender with the price database, with the area taken from the studio; the ERP then tracks the site and the invoicing of your SME.
Frequently asked questions
What U-value is needed for a subsidy?
The studio preset uses U ≤ 0.20 W/(m²·K) for the façade, roof and walls, and 0.25 for walls and floors buried more than 2 m deep. Check the current conditions of your canton.
When should the application be filed?
Before works start, with the canton. Works started before filing are generally not supported.
Does the studio calculate the amount?
No. It checks the U-value criterion and gives the net area. The amount per square metre and the bonuses are set by each canton.
Can an element that is already insulated be supported?
Only if its final U-value goes below the threshold and improves by at least 0.07 W/(m²·K), according to the studio preset. Calculate the state before and after.