Before pricing an insulation job, the contractor and the designer need to know which U-value the element must reach. In Switzerland, the cantons transpose into their energy legislation the Model of cantonal energy regulations (MoPEC, MuKEn in German). Its 2025 edition distinguishes buildings to be constructed and new elements on one side, and alterations or changes of use on the other. It also distinguishes the element facing the outside (or buried less than 2 m) from the one facing an unheated room (or buried more than 2 m). These element-by-element limit values complement the SIA 380/1 standard and the energy proof required by the canton; they do not replace it.
The Insulation studio calculates the U-value of a wall layer by layer, then compares it with a limit value you choose. Four MoPEC 2025 presets are offered, with their source and reading date: new build against the outside (0.17 W/(m²·K)), new build against an unheated room (0.25), alteration against the outside (0.25) and alteration against an unheated room (0.28). You can also freely enter your canton's value. The result is a numerical comparison, not a certificate.
Worked example: which insulation thickness for each MoPEC limit value
A 200 mm reinforced concrete wall (λ = 2.3 W/(m·K)), 15 mm internal gypsum plaster (λ = 0.51), stone wool insulation (λ = 0.036) and 15 mm mineral render (λ = 0.87). Generic studio values, to be replaced with the manufacturer's. Rsi = 0.13 m²·K/W; Rse = 0.04 against the outside and 0.13 against an unheated room.
| MoPEC 2025 case | Limit U-value (W/(m²·K)) | Rse (m²·K/W) | Minimum thickness calculated | Thickness chosen and U obtained |
|---|---|---|---|---|
| New build, against the outside | 0.17 | 0.04 | 200.8 mm | 210 mm: U = 0.1629 |
| Alteration, against the outside | 0.25 | 0.04 | 133.1 mm | 140 mm: U = 0.2385 |
| New build, against an unheated room | 0.25 | 0.13 | 129.8 mm | 130 mm: U = 0.2497 |
| Alteration, against an unheated room | 0.28 | 0.13 | 114.4 mm | 120 mm: U = 0.2683 |
The layers without insulation give R = 0.015/0.51 + 0.200/2.3 + 0.015/0.87 = 0.0294 + 0.0870 + 0.0172 = 0.1336 m²·K/W. With Rsi + Rse = 0.17, the resistance excluding insulation is 0.3036; against an unheated room (Rse = 0.13), it is 0.3936. For U ≤ 0.17, RT ≥ 1/0.17 = 5.882 is needed, so insulation with R ≥ 5.579 and a thickness of at least 5.579 × 0.036 = 0.2008 m. With 210 mm, R = 5.833, RT = 6.137 and U = 0.1629. The other three rows are calculated the same way.
Moving from alteration (0.25) to new build (0.17) needs 70 mm more insulation on this wall. The thickness chosen is rounded to the boards available, and the λ of the selected product can change the result: an insulant at 0.032 instead of 0.036 reduces the thickness by about 11 %. For an element only just below the limit, like the third row, it is better to keep a margin.
On this wall, 210 mm of stone wool is needed for a new build against the outside, but 140 mm is enough for an alteration: choosing the wrong preset skews the whole tender.
3 frequent mistakes with the MoPEC limit values
Confusing new build and alteration
A new element added to an existing building (extension, added storey) generally follows the values for new elements, not those for alterations. Check the category in the cantonal law before sizing the thickness.
Keeping Rse = 0.04 against an unheated room
Against an unheated cellar or garage, the limit value changes and so does the surface resistance on the room side. Applying the outdoor limit or the wrong resistance oversizes or undersizes the insulation.
Taking the limit for a complete proof
Meeting the U-value of each element exempts you neither from the energy proof required by the canton, nor from treating the thermal bridges required for new buildings. The studio checks the element, not the building.
Three-step guide
- Choose the preset and build the wall
Start from the « Externally insulated façade » preset or an empty wall, then enter the layers from inside to outside with their thickness; replace the generic λ values with those from the data sheets. - Select the applicable limit value
Under « U-value limit value », choose the MoPEC 2025 case (new build or alteration, outside or unheated room) or enter your canton's value with its edition year and source. - Adjust the thickness and print
Increase the insulation until you get « Lower or equal », then print the results sheet or export the CSV for the file and the tender.
What the free version does not do
The studio compares a U-value with the chosen limit; it does not produce an SIA 380/1 building balance, a CECB certificate or a thermal bridge proof. The MoPEC values are presets read at the source, but it is your canton's law that applies: check it, as a canton may have transposed another edition. The U-value calculator in the tools hub also covers the question from the dew point angle; see the related page.
With Soumissions, the chosen thickness goes into the items of your insulation tender, with the cost database and a file per site. The ERP then tracks the job, the hours and the invoicing of your SME.
Frequently asked questions
Which U-value applies to a new wall against the outside?
The studio's MoPEC 2025 preset gives 0.17 W/(m²·K) for a new opaque element against the outside or buried less than 2 m. The value that applies is the one in your canton's law.
Is an alteration less demanding?
Yes, in the studio's presets: 0.25 W/(m²·K) against the outside and 0.28 against an unheated room, instead of 0.17 and 0.25 for new builds. The canton may set other rules.
Does the studio's result count as proof?
No. It compares your U-value with the chosen limit. The energy proof and its forms remain those required by the canton, prepared by the person responsible for the file.
What if the manufacturer's λ is different?
Open the layer's design values and enter the product's λ, ρ, c and μ. The studio recalculates the U-value and the comparison with these values.