Between two flats in a condominium (PPE), between a terraced house and its neighbour or on an exposed façade, the SIA 181 standard sets requirements for protection against airborne sound. They are expressed as quantities measured between rooms: a weighted standardised level difference (D’nT,w, with its adaptation term) that depends on the wall, but also on the volume of the receiving room, the separating area and flanking transmission. The requirement level (minimum, enhanced for condominiums and terraced houses, or special by agreement) is set in the contract and the project file.
The Insulation studio estimates the apparent sound reduction index R’w of the element. For a solid wall it applies the mass law R’w = 20·log10(m’) + 4, valid from 100 kg/m². For a lining it calculates the stiffness of the cavity, the resonance frequency f0 of the mass-spring-mass system and the resulting gain or loss. It also applies deductions for a forgotten perimeter strip or for back-to-back electrical boxes. You enter the required value: the studio does not pre-fill any value from the standard.
Worked example: a calcium silicate wall and three ways to line it
Separating wall in 175 mm calcium silicate brick (ρ = 1 800 kg/m³, i.e. m’ = 315 kg/m²). Lining of two 12.5 mm plasterboards (ρ = 900, i.e. m’ = 22.5 kg/m²) on an independent stud frame with the cavity filled with fibrous absorber, or boards bonded onto rigid insulation. Formulas and constants as shown by the studio, indicative results.
| Variant | Stiffness s’ (MN/m³) | Resonance f0 (Hz) | Gain or loss (dB) | Estimated R’w (dB) |
|---|---|---|---|---|
| Bare wall (mass law) | – | – | – | 54.0 |
| Lining, 30 mm cavity with absorber | 3.70 | 66.8 | +15.3 | 69.3 |
| Lining, 60 mm cavity with absorber | 1.85 | 47.2 | +20.2 | 70 (studio ceiling) |
| Boards bonded onto rigid insulation | 30 | 190.2 | −3.3 | 50.6 |
Bare wall: 20 × log10(315) + 4 = 20 × 2.498 + 4 = 54.0 dB. 30 mm cavity with absorber: s’ = 0.111/0.03 = 3.70 MN/m³; f0 = 1/(2π) × √(3.70·10⁶ × (1/315 + 1/22.5)) = 0.1592 × √(3.70·10⁶ × 0.04762) = 66.8 Hz. The studio interpolates its gain between 22 dB at 40 Hz and 12 dB at 80 Hz: 22 − 10 × 26.8/40 = 15.3 dB, giving 69.3 dB. With 60 mm, f0 falls to 47.2 Hz and the result of 74.2 dB is capped at 70 dB, because flanking transmission is not calculated.
Bonded onto rigid insulation with a stiffness of 30 MN/m³, the same boards resonate at 190.2 Hz, right in the audible range: the studio interpolates between −2 dB at 160 Hz and −6 dB at 250 Hz, i.e. −3.3 dB, and the wall loses insulation (50.6 dB). A forgotten perimeter strip or back-to-back electrical boxes add deductions to the lining result. These element values are then compared, with caution, with the D’nT,w requirement of the project.
An independent stud frame with 30 mm of absorber adds about 15 dB to this wall, whereas boards bonded onto rigid insulation make it lose 3 dB.
3 common mistakes in airborne sound insulation
Bonding the lining onto rigid insulation
A lining fixed with adhesive dabs or onto rigid insulation resonates above 160 Hz and amplifies noise. The studio flags it: prefer an independent stud frame and a cavity filled with fibrous absorber.
Forgetting the perimeter strip
A board that touches the slab or the adjoining walls creates a sound bridge along its whole perimeter. The resilient perimeter strip is a site detail that costs little and weighs heavily on the result.
Fitting boxes back to back
Two sockets on either side of the same wall pierce it at the same spot. Offset the boxes and fill the openings: the studio applies a deduction when this defect is declared.
How to use it in 3 steps
- Choose the acoustic preset
Start from “Box in a box” or “Façade insulated on the inside”: the Acoustics tab is only calculated for these presets and for the separating floor. - Describe the wall and the lining
Enter the load-bearing wall, the cavity, the absorber and the board, then declare the possible defects (perimeter strip, boxes) to see their effect. - Enter the requirement and compare
Choose the SIA 181 requirement level and enter the value required by your project file: the studio shows the margin or the shortfall, as an indicative result.
What the free version does not do
The studio gives an element R’w from formulas in the literature, with adjustable calibration constants not checked against the standard; it calculates neither flanking transmission nor the D’nT,w between two rooms, and only an on-site measurement is authoritative. For the principle of the decoupled lining wall, see the “Box in a box” page; to check a requirement in decibels or the noise of a heat pump, see the SIA 181 acoustic checker in the tools hub.
With Soumissions, the chosen lining becomes tender items priced with the price database; the ERP then tracks the site, the hours and the invoicing.
Frequently asked questions
What is the difference between R’w and D’nT,w?
R’w describes the wall as built. D’nT,w describes the actual insulation between two rooms: it takes account of the volume of the receiving room, the shared area and transmission through the adjoining walls.
Why does the mass law stop at 100 kg/m²?
Below that, a lightweight wall vibrates differently and the simple formula becomes very uncertain. The studio shows a warning when the load-bearing wall weighs less than 100 kg/m².
What resonance frequency should I aim for?
A low resonance, around 50 to 80 Hz, keeps the audible range above the point where the lining starts to insulate. Above 160 Hz, the lining can make the insulation worse.
Does the studio know the SIA 181 requirements?
It offers the minimum, enhanced and special levels, but you enter the value in decibels. It depends on the noise sensitivity and the type of rooms and must be taken from the standard.