Free software · 100% in your browser · no data sent

SIA 180: checking surface humidity and reading the summer comfort of a wall

A wall can meet the U-value and still grow mould: SIA 180 looks at the temperature of the internal surface, not just at heat losses.

Open the free studio →

Free, no account: your walls and your calculations stay in your browser.

The SIA 180 standard deals with thermal protection, moisture protection and indoor climate. For the company that insulates or renovates, two questions come up: will the internal surface stay warm enough to avoid mould in winter, and will the room stay bearable in summer? The first point is judged with the surface temperature factor fRsi = (θsi − θe)/(θi − θe), compared with a minimum that depends on the humidity of the indoor air. The second depends mostly on glazing, solar protection and night ventilation, far more than on the opaque wall.

The Humidity tab of the Insulation studio compares the wall's fRsi with the useful minimum, month by month, with the climate and indoor conditions entered, and flags possible surface condensation. For summer, the studio gives the wall's time lag and decrement factor: they show how the heat wave passes through the wall or roof, without calculating the room's overheating. Thermal bridges, which create the coldest points, are handled in the 2D studio.

Worked example: fRsi of an old wall before and after insulation

Old wall: 15 mm gypsum plaster (λ = 0.51), 300 mm solid brick (λ = 0.8), 20 mm render (λ = 0.87), then a variant with 120 mm of stone wool (λ = 0.036) on the outside. Hand calculation in the plain zone, with Rsi = 0.25 for humidity, θi = 20 °C and θe = −10 °C (example values) and a critical surface humidity of 80 %.

Surface temperature factor obtained and minimum required according to indoor humidity
SituationfRsi factorTemperature (°C)Reading
Uninsulated wall (U = 1.674)0.652θsi = 9.6cold surface
Wall + 120 mm stone wool (U = 0.254)0.938θsi = 18.2warm surface
Minimum with 40 % indoor humidity0.642critical θ = 9.3just met without insulation
Minimum with 50 % indoor humidity0.754critical θ = 12.6not met without insulation
Minimum with 60 % indoor humidity0.848critical θ = 15.4met with insulation

Layers: 0.015/0.51 + 0.300/0.8 + 0.020/0.87 = 0.0294 + 0.3750 + 0.0230 = 0.4274 m²·K/W. With Rsi = 0.25 and Rse = 0.04, RT = 0.7174 and fRsi = 1 − 0.25/0.7174 = 0.652, i.e. θsi = −10 + 0.652 × 30 = 9.6 °C. With 120 mm of insulation (R = 3.333), RT = 4.051 and fRsi = 0.938, i.e. 18.2 °C. The U-value, calculated with Rsi = 0.13, drops from 1.674 to 0.254 W/(m²·K).

At 20 °C, the saturation pressure is about 2,337 Pa. With 50 % humidity, the vapour pressure is 1,168 Pa; the surface reaches 80 % humidity when its saturation pressure falls to 1,168/0.8 = 1,461 Pa, i.e. 12.6 °C, hence fRsi,min = (12.6 + 10)/30 = 0.754. The bare wall (0.652) is no longer enough from 50 % humidity: a kitchen or a poorly ventilated bedroom will grow mould in its corners.

Uninsulated, this wall only holds in dry air; with 120 mm of external insulation, its fRsi of 0.938 exceeds the minimum even at 60 % humidity.

3 frequent mistakes on humidity and summer comfort

Replacing the windows without looking at the walls

New airtight windows raise indoor humidity if ventilation does not keep up. An old wall that passed at 40 % may no longer pass at 50 %: check the fRsi with the actual humidity expected.

Judging the plain wall and forgetting the corners

The plain zone of a wall gives the best fRsi. Corners, lintels and slab edges are colder: the full check of cold points is done with a two-dimensional thermal bridge calculation.

Relying on the time lag against overheating

A good roof time lag delays the heat, but a room overheats first through glazing without external solar protection and without night ventilation. The opaque wall is only part of the answer.

Three-step guide

  1. Build the wall and set the indoor climate
    Choose a preset (for example « Internally insulated façade »), enter the layers, then set the indoor temperature and humidity of the real room.
  2. Read the Humidity tab
    The studio compares the fRsi with the useful minimum and flags possible surface condensation in some months; test several indoor humidities to see the margin.
  3. Look at summer and print
    Note the time lag and the decrement factor, then print the results sheet; for cold points, move on to the 2D thermal bridge studio.

Open the free studio →

What the free version does not do

The studio calculates neither the overheating of a room, nor solar gains, nor ventilation; it does not check the SIA 180 summer requirements for a room. Its humidity check covers the plain wall by vapour diffusion, without capillarity. For a wall corner that grows mould, see the page on corner mould in the 2D studio; for a quick U-value and dew point calculation, see the calculator in the tools hub.

With Soumissions, the chosen solution becomes tender items priced with the cost database; the ERP then tracks the job and its invoicing.

Frequently asked questions

What is the fRsi factor?

It is the ratio (θsi − θe)/(θi − θe): 1 means a surface at room temperature, 0 a surface at outdoor temperature. The higher it is, the lower the risk of moisture on the surface.

Why Rsi = 0.25 for humidity?

A higher surface resistance is used to represent corners and furniture that hinder heat exchange. The 2D studio also uses 0.25 for its humidity pass.

Which indoor humidity should I enter?

That of the real room. A well-ventilated living room often stays around 40 to 50 %; a bathroom or a poorly ventilated bedroom can go higher. Test several values.

Does the studio calculate summer overheating?

No. It gives the wall's time lag and damping. Overheating depends mostly on glazing, solar protection and ventilation, to be studied separately.