Loading...
About this tool
What is an insulation studio combining thermal, moisture, acoustics, and fire safety used for?
On a construction site, modifying a wall composition to improve thermal performance often upsets other criteria. Replacing facade insulation can reduce energy losses, but alter water vapor diffusion or degrade airborne sound performance. Site managers, plasterer-painters, facade installers, and carpenters must juggle multiple physical constraints before ordering supplies.
The Insulation Studio brings these calculations together in one place to analyze a complete assembly. You have six presets to start immediately: externally insulated facade, internally insulated facade, box-in-a-box for partitions, pitched roof between rafters, unheated basement ceiling, and floor for impact sound.
The layer builder allows you to add, reorder, or delete each material using the keyboard or drag-and-drop. You adjust thickness, assign a precise role to each layer, and view a scaled section with hatching associated with each material family. Calculations run entirely within your web browser without creating an account. Nothing is sent to a server and no data is stored in your browser's memory.
The studio compares your results to the limit values entered for the project. MoPEC 2025 and Building Programme presets were retrieved at the source on November 17, 2026. The tool simply indicates whether your result is less than or equal to, or greater than the entered threshold, without ever issuing a regulatory compliance judgment. You retain control over all physical parameters to adapt the simulation to the realities of the execution file.
Externally insulated facade: U-value, anchors, and reaction to fire
Rendered external thermal insulation protects the load-bearing structure from external thermal amplitudes. To determine the U-value, the tool applies surface thermal resistance values Rsi and Rse adapted to the direction of horizontal heat flow. The thermal calculation also incorporates the correction relating to mechanical fixings. Each metal anchor penetrating the insulation material creates a localized thermal bridge. By entering the anchor's point thermal coefficient, or its cross-section and conductivity, the tool corrects the overall U-value of the wall.
Regarding fire safety, the behavior of insulation materials varies according to building height. The studio offers an indicative table by height category: low, medium, or high. This editable table lists the presence of potential fire barrier strips according to the chosen materials. These values constitute working benchmarks that the site manager can readjust according to the instructions of the safety engineer or competent cantonal authority.
For composite layers, particularly boxes with timber studs or metal profiles, the studio implements the combined method of standard EN ISO 6946. The calculation weights the surface area between the framing and the insulation to avoid underestimating actual heat transfer through load-bearing elements.
The costly mistake in the field: neglecting the thermal effect of anchors during initial calculation. On large facade surfaces, the multiplication of metal fixings without thermal breaks increases the final U-value of the wall. The action that avoids this error is to enter the manufacturer's point thermal bridge coefficient during the design phase to adjust the insulation thickness before supplying the construction site.
Internally insulated facade: dew point and twelve-month condensation
Insulating a facade from the inside presents a high hygrometric risk in winter. Existing masonry remains cold, shifting the condensation zone to the interface between the load-bearing wall and the new insulation layer. Without rigorous water vapor management, liquid moisture accumulates behind the lining and degrades materials.
The studio applies the Glaser method defined in standard EN ISO 13788 to simulate wall behavior over twelve consecutive months. The tool generates the Glaser diagram for the selected month, calculates the amount of accumulated water month by month, and evaluates summer drying conditions. Initial climate data are provided as examples and remain editable by the user. The studio also calculates the surface temperature factor to assess the risk of mold growth on interior facings.
When a smart vapor retarder data sheet indicates a variable diffusion resistance value, the studio takes this specific behavior into account according to ambient relative humidity. You can thus simulate opening up to vapor diffusion during the warm period to check the moisture evacuation capacity towards the interior.
The costly mistake in the field: installing internal dry lining without checking the dew point position or summer drying potential. Walls are often seen where liquid water remains trapped during warm months, leading to the rotting of secondary elements. The action that avoids this error is to check on the Glaser diagram that the amount condensed in winter evaporates completely during the summer period.
Box-in-a-box: resonance, acoustic bridges, and impact sound
To address noise nuisance between rooms, the studio applies mass law for single walls and the mass-spring-mass principle for acoustic linings. The air gap or fibrous insulation placed between the heavy wall and the facing board acts as a shock absorber. The model calculates the system's resonance frequency and displays the expected acoustic gain or penalty. A visual alert warns the user when the calculated resonance frequency exceeds 160 Hz, a zone where the lining degrades sound insulation compared to the bare wall.
On slabs, step noise treatment is analyzed via the slab preset with floating screed. The tool allows comparison of indices obtained with requirements entered by the user, referencing the framework of SIA 181 standard. Acoustic setting constants integrated into the tool remain editable parameters. They provide a technical order of magnitude but do not replace an acoustic measurement performed in situ by an acoustician.
The costly mistake in the field: the appearance of execution acoustic bridges that ruin the theoretical performance of the box-in-a-box system. Forgetting a resilient strip under a perimeter track, installing back-to-back electrical boxes in a partition wall, or using rigid metal ties creates direct solid-borne transmissions. The action that avoids this error is to check the decoupling options in the studio and systematically monitor on the construction site the continuous presence of edge strips before pouring the screed or closing the panels.
Roof and basement ceiling: summer phase shift and limit value
In converted attics, summer comfort depends directly on thermal phase shift and heat wave damping. The studio calculates these quantities using the periodic transfer matrix from standard EN ISO 13786. Phase shift expresses the number of hours required for external heat to cross the pitched roof assembly between rafters. By modifying the density and specific heat of the insulation, you immediately visualize the shift of the temperature peak towards night, when natural ventilation evacuates heat.
For unheated basement ceilings, the direction of thermal flow points downwards. Surface transmission coefficients Rsi and Rse are adjusted to integrate this specific physical situation. The studio calculates the resulting U-value of the insulated slab and positions it against the limit value entered by the user. You can compare this result with your project requirements from cantonal repositories or subsidy scales.
The modules also integrate the KBOB environmental balance for material layers associated with the KBOB list. The studio displays embodied energy, greenhouse gas emissions, and ecological impact points of the studied wall. The user thus has clear environmental indicators to compare various construction variants during technical file development.
The costly mistake in the field: sizing a roof solely on winter U-value by choosing very low bulk density insulation. In summer, the heat wave quickly crosses the roof, making the attic uninhabitable without mechanical cooling. The action that avoids this error is to simultaneously check the U-value and hourly phase shift in the studio to select a material providing sufficient inertia under the rafters.
Swiss product catalog and bill of quantities
The Insulation Studio integrates a Swiss market product catalog, read from a static file updated weekly. This catalog gathers products with their characteristics from manufacturer performance declaration data sheets: thermal conductivity, vapor diffusion resistance factor, and density. To avoid specification errors on site, only thicknesses actually manufactured and marketed are selectable for each product.
In parallel, a library of generic materials allows quick building of principle variants. Values associated with generic materials constitute indicative orders of magnitude. For actual execution or tender placement, the technical data sheets of selected suppliers must serve as the calculation basis.
Based on wall geometry, the studio generates a bill of quantities for required materials. For an externally insulated facade, the bill details insulation panel surface, mortar consumption, reinforcing mesh, anchors, and stop profiles. For internal lining or partitions, it evaluates linear meters of studs, hangers, resilient strips, wool rolls, vapor retarder sheets, plasterboards, and screw counts. All unit consumptions per square meter remain editable by the user.
This bill of quantities is generated without any price: you can enter your own unit prices, and the total is then calculated in your browser. The CSV export from the free version includes a note indicating its origin, and the technical sheet printout bears an Art Construction watermark.
What the free version does not do
The free version of the Insulation Studio is a preliminary analysis tool operating in one dimension under steady-state conditions. It does not handle linear thermal bridges at floor or partition junctions, nor complex two- or three-dimensional thermal modeling. For these specific situations, a specialized study remains required.
On the hygrometric side, the Glaser method analyzes only water vapor diffusion through a single condensation plane. The model does not calculate capillary absorption phenomena, liquid moisture transport by suction, or the drying of masonry saturated with driving rain. The analysis handles only one section at a time; angle or facade base details must be examined separately.
Furthermore, no cantonal construction rules are automatically injected into the calculations. MoPEC constitutes a harmonization model that each canton transposes according to its own energy laws. It is up to the user to enter the limit values of their intervention location. Similarly, acoustic parameters and fire table requirements are editable data. The studio constitutes technical sizing assistance and does not replace calculations from an engineering office or official laboratory testing.
Use of the free version is registration-free. As soon as you close your browser tab, your entries are not saved. To learn more about access to professional modules, see our dedicated page on tenders and ERP.
Switching to Tenders or ERP
For trade contractors, plasterers, façade specialists, and general contractors who want to keep their insulation studies from one construction site to another, switching to the paid version links the dimensioning to the construction site file. With Tenders and the ERP, you save your wall assemblies directly to a cloud-hosted construction site file, with complete archiving of the history of successive versions.
You can reopen a study at any time, with the unit prices you entered in the bill of quantities, and pick up right where you left off. The technical assumptions and insulation bills of quantities thus remain attached to the same project.
Finally, exporting technical sheets and insulation reports occurs without any watermark. The report is generated in your company's colors and prints as a PDF from the browser, to be attached to your tenders or handed over to site management.
Dimensioning remains immediately accessible online for your routine checks. When the project requires contractual tracking, cloud backup takes over to preserve each version of your study.
Frequently asked questions
Are my insulation calculations saved when I close my browser?
No. In the free version, the studio operates 100% within your browser. No information is transmitted to a server or stored in your browser's local memory. When you close your tab or reload the page, your calculation data is erased.
Does the studio automatically apply my canton's energy laws?
No. The studio does not load any cantonal limitation period automatically. MoPEC serves as a reference model that each canton adapts into its own legislation. The user must manually enter the limit value corresponding to the competent authority's requirements for their project.
How does the studio account for mechanical fixings of external insulation?
The studio adjusts the overall U-value of the wall when you enter the anchor's point thermal bridge coefficient, or its cross-section and thermal conductivity. This mathematical correction measures the impact of metal heat loss passing through the insulation layer.
Why does an acoustic alert appear above 160 Hz?
In a mass-spring-mass system, if the resonance frequency lies above 160 Hz, the lining degrades the wall's acoustic insulation within the audible range. The studio flags this unfavorable resonance to invite you to modify the thickness or mass of the facing.
Does the printed document prove the legal compliance of a wall?
No. The resulting output is decision support for execution sizing. It does not replace a calculation note drawn up by a specialized engineer, a site insulation test, or the formal decision issued by the building inspection authority.
Where do the technical data in the Swiss material catalog come from?
Values come from a static file updated weekly, incorporating performance declaration data sheets from Swiss manufacturers. Only thicknesses actually manufactured appear there. In the absence of a file, the tool's generic materials remain usable with their editable values.
What does the paid version of the insulation studio contain?
The paid version, in Tenders and in the ERP, saves your insulation projects by construction site, with all their versions, and allows you to reopen them at any time. It also produces a report without a watermark, in your company's letterhead, to be printed as a PDF. It contains no price database: the prices in the bill of quantities are those you enter yourself.