Energy Subsidies Simulator by Canton (PAC, Insulation M-01, CECB)
Estimate the 2026 energy subsidies by canton: heat pump, insulation, CECB.
Interactive tool
Indicative rates. Buildings Programme (Programme Bâtiments) amounts change every year and from one canton to another. The 2026 rate for the canton of Vaud has been verified; the others are indicative (per the specifications, based on the cantons' harmonised incentive model). Confirm them on the cantonal portal before work starts.
A Thermal insulation of the envelope (measure M-01, U ≤ 0.20 W/m²K)
B Replacement of a fossil or electric heating system (measures M-02 to M-07)
C Whole-building renovation, CECB Plus and taxation
Estimated subsidies
- Insulation (M-01)
- Heating
- CECB Plus audit
- Whole-building renovation bonus
- Total estimated subsidies
Gross cost and net remaining cost after tax deduction
- Estimated gross cost of the works
- Remaining cost after subsidies (deductible portion)
- Estimated tax saving
- Net remaining cost
Office to contact: . Indicative estimate: the cantonal office's award decision prevails.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="5.13"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
The Buildings Programme in Switzerland: how to combine insulation (M-01) and heat pump subsidies
The cantons' Buildings Programme pays grants for energy renovation: this is the route to the heat pump insulation subsidy vaud valais geneva. The measures can be combined within the limits of each canton's rules: for example insulation of the envelope (M-01), replacement of a fossil or electric heating system by a heat pump or a wood heating system, and connection to district heating. The amount per m2 buildings programme M-01 depends on the canton and the performance achieved. Here is the verified 2026 Vaud scale (Buildings Programme conditions, version 1.1 of January 2026), on which the tool's example is based:
| Measure | Amount |
|---|---|
| M-01 Insulation of the facade, roof, walls and floor against the ground | 40 CHF/m² (U ≤ 0.20); 70 CHF/m² (U ≤ 0.15); 100 CHF/m² (U ≤ 0.15 with photovoltaics) |
| M-05 Air/water heat pump | 5'000 CHF (single dwelling or up to 15 kW), otherwise 400 CHF/kW |
| M-06 Ground/water or water/water heat pump | 20'000 CHF (single dwelling or less than 20 kW), otherwise 4'000 CHF + 800 CHF/kW |
| M-03 Automatic wood heating | 8'500 CHF (less than 20 kW or single dwelling), otherwise 4'500 CHF + 200 CHF/kW |
| M-07 Connection to district heating | 6'000 CHF (less than 20 kW or single dwelling), otherwise 4'800 CHF + 60 CHF/kW |
In Fribourg, the cantonal sheet indicates 60 CHF per m² of insulated envelope (valid from March 2023, to be confirmed). For the other cantons, the specification speaks of 60 to 80 CHF/m² for insulation, 5'000 to 10'000 CHF for an air/water heat pump and 8'000 to 15'000 CHF for a ground/water heat pump: the tool uses the midpoints of these ranges. On the tool's example (240 m² insulated at 40 CHF/m² and an air/water heat pump), the subsidies for the measures reach 14'600 CHF.
Clarification on the text of the standard. The scales change every year and from one canton to another (the canton of Vaud slightly lowered its M-01 scales in 2026). Only the 2026 Vaud scale and the Fribourg amount cited are verified; the other amounts are indicative, with the Vaud amounts for wood and district heating for lack of a scale. Always confirm on the cantonal portal before work starts.
Technical conditions for award: achieve U ≤ 0.20 W/m2K and replace a fossil or electric heating system
For insulation, the U-value of the insulated element must reach 0.20 W/m²K at most, and the specification reminds that the Buildings Programme does not subsidise window replacement alone or elements facing unheated rooms (these elements may benefit from indirect support in comprehensive renovation). The French-speaking cantons add conditions, such as an improvement of at least 0.07 W/m²K in Fribourg. To calculate the insulation thickness required, see the U-value and condensation calculator.
For the replacement electric or oil heating cantonal premium, the heat pump or wood heating system must replace a main heating system running on heating oil, natural gas, or a fixed electric resistance heating system; the new installation must serve as the main heating and cover 100 % of the annual heat requirement with renewable energy. Only electric-motor heat pumps are eligible for a contribution.
When does the CECB Plus report (Cantonal Building Energy Certificate) become mandatory (threshold > 10'000 CHF)?
The CECB Plus obligation energy audit subsidy applies from 10'000 CHF of financial contribution: the CECB Plus certificate, issued by an accredited expert, must then be provided (before the start of the works or with the application depending on the canton), and the CECB must be updated after the works. This condition is confirmed for Vaud, Fribourg, Valais and Neuchâtel. On the tool's example, the subsidies for the measures reach 14'600 CHF: the CECB Plus is therefore mandatory. The audit itself is subsidised at about 1'000 to 1'500 CHF according to the specification.
The knock-out rule: why you must never start the site before the award promise
To file subsidy application before start of works, the order must be respected: application, award decision, then works. An application filed after the start of the works is generally refused by cantonal programmes, and the right to the subsidy is then lost in full. On the tool's example, starting too early loses 15'850 CHF and raises the remaining cost from 69'150 CHF to 85'000 CHF. A few practical pointers:
- File the application with the quote and, if the CECB Plus is required, with the certificate.
- Wait for the written award decision before signing the contractor agreement or ordering the materials.
- Report in writing to the cantonal office any change to the project that alters the amount (Vaud: before the start of works).
- Keep the invoices and the declaration of completion for payment of the subsidy.
This rule applies to each measure: for example, the application for the envelope efficiency bonus (IP-14 in Vaud) must be filed at the same time as measure M-01 and before the start of works.
Combining cantonal subsidies and the tax deduction for energy-saving works from your taxable income
Investments intended to save energy in an existing building are treated as maintenance costs and are deductible from taxable income (art. 32 para. 2 LIFD and the ordinance on property-related costs, RS 642.116). The important rule for combining: if the measure is subsidised, only the costs you bear yourself are deductible (art. 1 para. 2 of the ordinance). On the tool's example, the works of 85'000 CHF, less 15'850 CHF of subsidies, leave 69'150 CHF deductible; at a marginal tax rate of 25 % (assumption), the tax saving is 17'288 CHF and the net remaining cost 51'863 CHF.
If the deduction cannot be fully used in the year of the works, the balance can be carried forward to the following two tax periods (art. 4 of the ordinance), but the taxpayer then cannot claim the flat-rate deduction during those periods. The cantons apply their own harmonised tax law: check with your tax authority. The tool uses the deduction of the costs not covered by the subsidy; it assumes eligible measures in an existing building.
Frequently Asked Questions on Energy Subsidies, the CECB Plus and the Tax Deduction (FAQ)
1. What is the insulation subsidy per m² (measure M-01)?
The amount depends on the canton and the performance of the insulation. In Vaud, according to the 2026 conditions of the Buildings Programme, measure M-01 pays 40 CHF/m² for a U-value of 0.20 W/m²K at most, 70 CHF/m² for 0.15 and 100 CHF/m² with a photovoltaic installation. In Fribourg, the cantonal sheet indicates 60 CHF per m² of insulated envelope (valid from March 2023, to be confirmed). For the other cantons, the specification speaks of 60 to 80 CHF/m²: the tool uses 70 CHF/m² and says so. With 240 m² insulated at 40 CHF/m², the Vaud subsidy is 9'600 CHF.
Scales fall or change every year: confirm them on the cantonal portal (leprogrammebatiments.ch) before ordering the works.
2. Is the CECB Plus mandatory to obtain a subsidy?
A CECB Plus is required from 10'000 CHF of financial contribution in the cantons consulted (Vaud, Fribourg, Valais, Neuchâtel). On the tool's example, the subsidies for the measures reach 14'600 CHF: the CECB Plus is therefore mandatory. It must be provided before the start of the works or with the application depending on the canton, and the CECB must be updated after the works. The audit itself is subsidised at about 1'000 to 1'500 CHF according to the specification.
The threshold and the amount of the audit vary by canton and measure: check them in the cantonal sheet.
3. Are energy-saving works tax-deductible?
Yes, for measures in an existing building: the ordinance on property-related costs (RS 642.116) treats investments intended to save energy as maintenance costs. If the measure is subsidised, only the costs you bear yourself are deductible: the tool uses 69'150 CHF (85'000 CHF of works less the subsidies), that is a tax saving of about 17'288 CHF at a marginal rate of 25 %, and a net remaining cost of 51'863 CHF. The balance that cannot be deducted during the year can be carried forward to the following two tax periods.
The marginal rate of 25 % is an assumption: it depends on your income and your municipality. If you start the works before the award, the subsidy is lost (15'850 CHF in the example) and the deductible share rises by the same amount.
Indicative information based on the Buildings Programme conditions and the ordinance RS 642.116; it replaces neither the decision of the cantonal energy office nor the advice of a tax specialist.
