Insulation Thickness Calculator (U-Value MoPEC) & Condensation Risk (SIA 180)
Size the insulation thickness according to the required U-value (MoPEC) and check the condensation risk.
Interactive tool
A Your wall
5 Conditions for the SIA 180 assessment
U-value and insulation thickness
- Calculated U-value
- Total thermal resistance R
- Minimum thickness for U = 0,20 W/m²K (Buildings Programme)
- Minimum thickness for U = 0,17 W/m²K (new build, SIA 380/1)
Surface resistances Rsi + Rse = 0,13 + 0,04 = 0,17 m²K/W; R insulation = thickness / λ; U = 1 / R total. Buildings Programme: U ≤ 0,20 W/m²K (facades, roofs, walls to the outside) and U ≤ 0,25 against an unheated room; the MoPEC values (0,17 new build) are those of the specifications.
Condensation assessment (SIA 180)
- Interior corner surface temperature (Rsi = 0,25)
- Temperature factor fRsi
- Dew point (Magnus formula)
Tsi = Ti − U × 0,25 × (Ti − Te); fRsi = (Tsi − Te) / (Ti − Te), to be at least 0,75; surface condensation appears if Tsi is below the dew point. Calculation of a homogeneous wall: thermal bridges require a detailed calculation. With internal insulation, the sd value of the vapour barrier is decisive.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="5.5"] in the content of a page on the site.
📄 Files and templates linked to this tool (free)
- PDFXLSX Insulation Charts U-Value (SIA 380/1) & Dew Point (SIA 180) The insulation thickness to install according to its lambda value, and the dew-point check. See the file, its mini-tool and the pack →
- XLSXPDF KBOB Life-Cycle Assessment & Carbon Summary by CFC (SIA 2032) Compare materials by CO2 emissions, embodied energy and UBP points. See the file, its mini-tool and the pack →
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
Mandatory limit U values in Switzerland: Standard SIA 380/1, MoPEC and Buildings Programme (0,20 W/m2K)
The maximum U value for facade and roof SIA 380/1 MoPEC sets the heat loss tolerated for an element of the building envelope: the lower the U value, the better the wall insulates. For new build, the tool's specifications cite 0,17 W/m²K for elements facing the outside (facades, roofs) and 0,25 for elements facing an unheated room; these values from the cantons' model energy provisions (MoPEC) were not verified in the text of the model. For renovation, the Buildings Programme pays its thermal insulation subsidy U <= 0.20: a U value of at most 0,20 W/m²K for facades, roofs and walls to the outside, and of at most 0,25 against an unheated room or against the ground beyond 2 m depth.
| Item | New build (MoPEC, specifications) | Renovation and subsidy |
|---|---|---|
| Façade / external wall to air | ≤ 0,17 W/m²K | ≤ 0,20 W/m²K |
| Flat or pitched roof to the outside | ≤ 0,17 W/m²K | ≤ 0,20 W/m²K |
| Slab or wall against unheated room / basement | ≤ 0,25 W/m²K | ≤ 0,25 W/m²K |
The French-speaking cantons generally add conditions to the subsidy: an initial U value above 0,20 and an improvement of at least 0,07 W/m²K, with a detailed calculation of the build-up. Check your canton's directives before ordering the works.
What insulation thickness (EPS, stone wool, PUR, wood fibre) to reach U ≤ 0,20 W/m2K?
The insulation thickness stone wool EPS for U 0.20 is calculated as follows: e = λ × (1/U − 0,17 − R of the substrate), with 0,17 m²K/W of surface resistances (Rsi + Rse). On a reinforced concrete wall of 20 cm (R = 0,09), 166 mm of stone wool (λ = 0,035) is needed for U = 0,20; the tool gives the minimum thickness in millimetres and the commercial thickness (rounded up to the next ten). With 180 mm of graphite EPS on concrete, the U value is 0,165 W/m²K: the wall even meets the new-build threshold of 0,17.
| Insulation | λ (W/mK) | Reinforced concrete 20 cm (R = 0,09) | Clay brick 17.5 cm (R = 0,50) | Old stone wall 50 cm (R = 0,35) | Timber frame (R = 0,20) | U = 0,17 on concrete |
|---|---|---|---|---|---|---|
| Graphite expanded polystyrene EPS | 0,031 | 147 mm | 135 mm | 139 mm | 144 mm | 175 mm |
| Standard white EPS | 0,038 | 181 mm | 165 mm | 171 mm | 176 mm | 214 mm |
| Stone wool | 0,035 | 166 mm | 152 mm | 157 mm | 163 mm | 197 mm |
| Ecological wood fibre | 0,040 | 190 mm | 174 mm | 180 mm | 186 mm | 225 mm |
| High-performance polyurethane PUR/PIR | 0,023 | 110 mm | 100 mm | 104 mm | 107 mm | 130 mm |
| Vacuum panel VIP / aerogel | 0,015 | 72 mm | 65 mm | 68 mm | 70 mm | 85 mm |
Standard SIA 180: calculating the dew point and avoiding mould after insulating or replacing windows
The dew point calculation mould SIA 180 answers a simple question: does the inner surface of the wall stay warm enough for the humidity of the air not to condense on it? The surface temperature of a corner is calculated Tsi = Ti − U × 0,25 × (Ti − Te), with 0,25 m²K/W as the critical surface resistance. At 20 °C and 50 % humidity, the dew point is 9,3 °C (Magnus formula). The wall in the example (U = 0,165) reaches 18,8 °C at -8 °C outside: no condensation.
After replacing windows or partial insulation, the risk shifts: airtight windows reduce air renewal and increase humidity, while neighbouring walls stay cold. As an example, an almost bare wall (20 mm of EPS) has a U of 1,272, a Tsi of 11,1 °C and an fRsi of 0,68: risk of condensation. With 60 mm of EPS and 70 % humidity, the dew point rises to 14,4 °C for a Tsi of 16,2 °C.
The critical surface temperature factor (fRsi) and the vapour barrier rule (sd value) with internal insulation
The temperature factor fRsi = (Tsi − Te) / (Ti − Te) measures the share of the temperature difference that «arrives» at the inner surface: 1 would be a perfectly insulated wall. The tool considers the wall compliant from 0,75, borderline between 0,70 and 0,75, non-compliant below that or if Tsi falls below the dew point. In the example, fRsi = 0,96.
With internal insulation, the water vapour from the room can condense against the cold wall, behind the insulation. A vapour barrier with a sufficient sd value, laid on the warm side and carefully sealed, limits this risk; the insulation thickness and the choice of system must be validated by a moisture calculation (Glaser method or simulation). The tool does not calculate the sd value: it depends on the product.
The fRsi threshold of 0,75 and the surface resistance of 0,25 m²K/W are the values from the specifications, according to standard SIA 180; they were not re-read in the text of the standard. The calculation is that of a homogeneous wall: thermal bridges (balconies, lintels, corners) require a detailed calculation.
Technical comparison of the thermal conductivities (Lambda λ) of insulation materials used in Switzerland
The thermal conductivity coefficient lambda of Swiss insulation measures the heat that passes through one metre of insulation for a difference of one kelvin: the lower it is, the better the insulation performs. Here are the tool's insulation materials and the thickness needed on a concrete wall to reach U = 0,20 W/m²K, ranked from best to least performing:
| Insulation | λ (W/mK) | Thickness for U = 0,20 (concrete) | Thickness for U = 0,17 (concrete) |
|---|---|---|---|
| Vacuum panel VIP / aerogel | 0,015 | 72 mm | 85 mm |
| High-performance polyurethane PUR/PIR | 0,023 | 110 mm | 130 mm |
| Graphite expanded polystyrene EPS | 0,031 | 147 mm | 175 mm |
| Stone wool | 0,035 | 166 mm | 197 mm |
| Standard white EPS | 0,038 | 181 mm | 214 mm |
| Ecological wood fibre | 0,040 | 190 mm | 225 mm |
The choice does not depend on λ alone: fire resistance, vapour permeability, embodied energy, price and available space also count. A vacuum panel or a PUR/PIR reduces the thickness needed, useful when roof overhangs or window sills are limited. For the decision to renovate a condominium or rental building, see the condominium (PPE) renovation and rent increase simulator.
Frequently Asked Questions about Insulation, U Value and Condensation (FAQ)
1. What insulation thickness is needed to reach a U value of 0,20 W/m²K?
The thickness depends on the insulation and the substrate: e = λ × (1/U − 0,17 − R of the substrate). On a reinforced concrete wall of 20 cm (R = 0,09), at least 147 mm of graphite EPS (λ = 0,031), 166 mm of stone wool (λ = 0,035), 190 mm of wood fibre (λ = 0,040), 110 mm of PUR/PIR (λ = 0,023) or 72 mm of vacuum panel (λ = 0,015) is needed. With 180 mm of graphite EPS, the U value is 0,165 W/m²K.
The Buildings Programme requires U ≤ 0,20 W/m²K for facades, roofs and walls to the outside and U ≤ 0,25 against an unheated room; the specifications cite 0,17 W/m²K for new build (MoPEC), a value not verified in the text of the model.
2. How do you calculate the dew point and the risk of mould according to standard SIA 180?
The inner surface temperature of a corner is calculated Tsi = Ti − U × 0,25 × (Ti − Te), with 0,25 m²K/W as the critical surface resistance. The temperature factor fRsi = (Tsi − Te) / (Ti − Te) must reach 0,75, and Tsi must stay above the dew point given by the Magnus formula. At 20 °C and 50 % humidity, the dew point is 9,3 °C. The wall in the example (U = 0,165) has a Tsi of 18,8 °C and an fRsi of 0,96: compliant.
Conversely, an almost bare wall (20 mm of EPS) has a U value of 1,27 and an fRsi of 0,68: risk of condensation. The calculation is that of a homogeneous wall; thermal bridges and corners require a detailed calculation.
3. What is the difference in lambda between the insulation materials used in Switzerland?
The lower the thermal conductivity λ, the more effective the insulation at equal thickness: vacuum panel 0,015 W/mK, PUR/PIR 0,023, graphite EPS 0,031, stone wool 0,035, white EPS 0,038 and wood fibre 0,040. At 180 mm on concrete, the U value is 0,165 with graphite EPS and 0,185 with stone wool.
The choice does not depend on λ alone: fire resistance, vapour permeability (sd value), embodied energy, price and available space count. A better-performing insulation reduces the thickness needed, useful in renovation when roof overhangs or window sills are limited.
Indicative information prepared from standards SIA 380/1 and SIA 180, MoPEC and the Buildings Programme; it does not replace a building physics calculation or your canton's directives.
