Protected pedestrian tunnel under scaffolding: width, length and footpath occupation

When the scaffolding takes over the footpath, pedestrians pass underneath or alongside. A well-drawn protected tunnel avoids closing the footpath and reassures local residents.

Open the free studio →

Free, no account: an indicative preliminary design, which does not replace the calculation note signed by an engineer.

A building built or renovated along a street often occupies part of the footpath: scaffold feet, a skip, a fence. Pedestrians, prams and people with reduced mobility must still be able to get through, sheltered from falling objects. The protected pedestrian tunnel, with its roof, meets this need. The page on public land occupation covers the area in m² and its duration; this one details the tunnel itself.

In the Crane and scaffolding studio, the pedestrian tunnel is a starting object 1.5 m wide and 4 m long, which you line up and copy along the façade. It is placed on the map or on the imported plan, next to the public land occupation zone whose area the studio calculates. The requirements (clear width, signage, lighting) are confirmed with the municipality or the roads department that issues the occupation permit.

Worked example: 24 m of façade on a 2.50 m footpath

Façade renovation of a building along a street. Street façade of 24 m, footpath 2.50 m wide fully occupied by the scaffolding and its protection. Starting tunnel elements of the studio: 1.5 m wide, 4 m long.

Pedestrian tunnel and footpath occupation (starting values of the studio)
ElementCalculationResultNote
Length to protectlength of the street façade24.0 mplus any returns
4 m tunnel elements24 / 46 elementsto be lined up without gaps
Clear passage widthstarting element1.50 mto be confirmed by the municipality
Footpath occupation24 × 2.5060.0 m²occupied area
Tunnel area24 × 1.5036.0 m²included in the occupation

The street façade is 24 m long: 24 / 4 = 6 tunnel elements of 4 m, set end to end. The clear passage retained is 1.50 m, a value often required for temporary pedestrian routes; some authorities accept less in exceptional cases, others ask for more: the municipality decides. The footpath occupation is 24 × 2.50 = 60.0 m², of which 24 × 1.50 = 36.0 m² for the tunnel.

The 60 m² of occupation feed the public land occupation file: the dedicated page explains how the duration enters the quantities. The tunnel must also keep a clear entrance and exit, with no step or obstacle, and signage that people with impaired sight can read.

For this façade, 6 tunnel elements of 4 m give a 1.50 m clear passage over 24 m, within an occupation of 60 m² to declare to the municipality.

3 common mistakes with the pedestrian tunnel

Narrowing the width to gain space

A passage of less than 1.50 m hinders prams and wheelchairs. If the width does not fit, the municipality may require pedestrians to be diverted to the other footpath.

Leaving a gap between two elements

An interrupted tunnel exposes pedestrians to falling objects exactly where they do not expect it. The elements are lined up without gaps along the whole length of the scaffolding.

Forgetting the tunnel entrances

A skip, a hoarding or a crane foot set against the tunnel entrance makes it unusable. Check the surroundings at each phase.

How to use it in 3 steps

  1. Draw the public land occupation
    Trace the occupied footpath zone: the studio calculates its area in m².
  2. Line up the tunnel elements
    Place a tunnel element, set its width and length, then copy it along the façade without leaving gaps.
  3. Export the occupation plan
    Export the plan as PDF and the quantities as CSV for the public land occupation permit application.

Open the free studio →

What the free version does not do

The studio draws the tunnel and calculates the areas; it checks neither the strength of the protective roof, nor the lighting, nor the road signage. The width and signage requirements come from the municipality or the roads department; the tunnel must be erected according to the manufacturer's instructions. This plan replaces neither the occupation permit nor the site safety concept.

With Soumissions, the quantities (public land occupation, scaffolding) go into the items of your tender, with the price database and one file per site.

Frequently asked questions

How wide should a site pedestrian tunnel be?

The studio starts from a 1.50 m clear passage, a value often required. The municipality or the roads department sets the applicable width in the permit.

Does the tunnel count in the public land occupation?

Yes, it is part of the occupied area. The studio calculates the total occupation in m² from the zone you draw.

Is a permit needed for a pedestrian tunnel?

Occupying the footpath generally requires a permit from the municipality; the plan exported from the studio supports the application.

Does the studio check the protective roof?

No. The roof and its strength depend on the instructions of the scaffolding or tunnel manufacturer.