Loading...
About this tool
Why Have a Public Land Occupation Plan
Placing a rubble skip, erecting scaffolding or installing a crane base requires occupying the street, road or pavement. As soon as your installations cross the private plot boundary, the local authority requires a complete file. This file allows technical services to assess the inconvenience caused to local residents, car traffic and the movement of people with reduced mobility.
On the construction site, a simple freehand sketch is not enough. The building police services require a clear view showing the parcel boundaries, the dimensions of the planned installations and the passages reserved for users. A file without a precise plan leads to back-and-forth with the administration, requests for additional information and delays in starting structural work or façade renovation.
This studio allows you to directly prepare your footprint document. The tool opens with a typical example: a street-side plot, an occupation zone on the pavement, a pedestrian tunnel, a skip and site fences distributed on either side. You move and redraw each element to reproduce the exact configuration of your construction site.
The application runs entirely within your web browser. It is free, accessible without registration and without account creation. Nothing is sent or saved on an external server: closing the tab erases all your work. Only the swisstopo map is subject to a read-only technical call to their servers if you choose to locate a specific address.
Drawing the Footprint and Reading its Area in Square Metres
To start your drawing, you can load the swisstopo map background at the exact scale or import a PDF plan provided by the architect or surveyor. The tool automatically measures distances to plot boundaries for the selected object on the screen, which allows you to check the layout relative to private property.
The public land occupation zone takes the form of a polygon that you draw point by point on the background plan. The studio applies the shoelace formula in real time to determine the exact area bounded by your layout. The value in square metres is displayed directly on the drawing as well as in the side control panel.
The costly mistake on site concerns the scale of the base document. We often see site managers import a vector or scanned PDF file and draw the footprint without checking the real dimensions. If the base plan is not calibrated, the final area is wrong. The right reflex consists of using the calibration tool on a known dimension of the plan, such as a façade width or a road width measured on site, before placing the first point of the polygon.
The studio compares dimensions and clearances to editable guide values. It simply indicates whether a criterion is "met" or "not met". It does not provide any regulatory verdict, as each municipality applies its own urban planning directives. Art Construction is independent of SIA, CRB and CFST, and does not issue any certificate.
Square Metres per Day: How Duration Enters the Measurement
Municipalities charge for the use of the street in the form of a tax or temporary usage fee. To estimate this site installation expense, the ground area alone is not enough: the duration of occupation is the second determining factor. Scaffolding in place for several months does not generate the same costs as a skip rented for a few days of demolition.
In the studio, the provisional duration of the construction site in weeks is an editable parameter in the project settings. The measurement module calculates the overall footprint in the form of a cumulative total in square metres per day. The calculation multiplies the ground area of the polygon by seven days a week, then by the total number of weeks scheduled for the concerned work phase.
This quantitative result appears in the summary measurement table. The studio does not give any amount in francs or any unit price, as scales vary greatly depending on municipal regulations and the location of the structure. You thus have a net quantity to integrate into your internal financial calculations or into the site installation positions of your tender.
To plan your phases, you can adjust the duration according to the schedule of trades. A reduction in the footprint during the transition from structural work to finishing work results in an immediate drop in the cumulative occupation volume in square metres per day.
Pedestrian Access, Skip and Fences on the Pavement
Occupying a pavement requires maintaining safe passage for users around the danger zone. The studio includes ready-to-use configurable objects: pedestrian tunnels with protective roofing, removable skips, mobile fence panels and lane separators.
The pedestrian tunnel has an editable starting width. You can widen or narrow this passage depending on the space available between your site fence and the road curb. This dimension must systematically be confirmed with the competent municipal services, notably to check clearance requirements related to pushchairs or wheelchairs.
Site fences are positioned along the limits of your footprint polygon. They delineate the area forbidden to the public and materialize the maneuvering space for truck unloading or crane access. The waste skip must be placed in such a way as to allow skip trucks to turn without blocking the visibility of intersections.
Once the plan is completed, the studio exports an image in PNG format comprising the graphic layout, the installation checklist and the surface measurement table. This document can be attached directly to your letter or to the official application file for authorization addressed to the municipal administration.
What the Free Version Does Not Do
The free online studio was designed for the rapid preparation of footprint plans on a workstation. To keep this tool accessible without constraints, certain usage limits apply. The tool operates in your browser's temporary memory: it does not save any files online. If you reload the page or close your browser, the entire layout is lost.
The studio contains no official cantonal or municipal forms, and transmits no requests to the authorities. It knows neither the price per square metre nor your municipality's police regulations. It produces technical assistance for graphic preparation, but in no way replaces the final decision nor the granting of the public land occupation permit by the administration.
The accuracy of the calculation depends on the fidelity of your drawing and proper initial calibration on the imported plans. In addition, the free version incorporates no reference prices, no cost databases and no custom templates in your company's colours. The image exported in the free version includes a default watermark.
Switching to Tenders
For general contractors, trade masters and architectural offices managing several files simultaneously, upgrading to the paid version of this studio is done via the Tenders software. No other paid software is concerned by this extension.
In the Tenders environment, you can save your project to the cloud, keep the history of successive versions and resume a footprint file at any time to modify it according to the comments of the municipal services. The Team mode allows collaborative work between the office quantity surveyor and the site manager on the ground.
The quote transmitted from the studio to project management is a draft without a price. In Tenders, you directly link the calculated quantities, including the footprint volume in square metres per day, to the ACIP price base to establish your offers and precisely price site installation costs. You also benefit from a high-resolution plan export without watermark, customized with your company header.
Frequently asked questions
Remain my construction site data confidential in the free version?
Yes. The studio operates entirely within your browser. No file is sent or saved on a server. When you close your work tab, all entered data is erased. The only external connection occurs if you search for an address on the swisstopo map, in the form of a simple read request.
How is the pavement footprint area calculated?
The studio uses the shoelace mathematical formula applied to the coordinates of the vertices of the polygon you draw. For the result in square metres to be exact on a plan imported in PDF, you must first calibrate the scale from a known dimension on the document.
Does the studio apply my municipality's rates for occupation?
No. The studio knows neither municipal rates, nor local regulations, nor usage taxes. It calculates physical quantities in square metres and in square metres per day. You must apply the rates indicated by your municipality's regulation to obtain the fee amount.
Does the exported plan constitute an official construction site authorization?
No. The produced PNG plan is a graphic aid to be attached to your technical file. It does not replace the formal authorization issued by the building police or the municipal road service, which remain solely competent to validate or refuse the installation of your equipment.
How is the square metres per day value calculated in the measurement?
The calculation takes the ground area of the footprint polygon in square metres, multiplies it by seven days a week, then by the provisional duration of the construction site expressed in weeks. This duration parameter is freely editable in the project configuration panel.
Does the width of the pedestrian tunnel comply with legal requirements?
The pedestrian tunnel offered in the studio is configured with an editable starting width. The studio compares this dimension to a guide value and indicates "met" or "not met". You must imperatively have this width confirmed by the responsible municipal service before assembly.
What does the connection with the Tenders software allow?
The connection to Tenders allows you to save your plans on the cloud, edit successive versions, export plans without watermark with your company logo and transfer quantities to the ACIP price base to establish your site installation quotes.