Heras fencing or solid hoarding and 4 m or 6 m truck gates: choosing and measuring

The fence is the first thing put up and the last taken down. Well chosen and well measured, it protects the public, the neighbours and the equipment without hindering the trucks.

Open the free studio →

Free, no account: an indicative preliminary design, which does not replace the calculation note signed by an engineer.

A site is closed off to keep the public out and protect the equipment. Two families share the market: the mobile Heras-type mesh fence, quick to put up and move, and the solid timber hoarding, which screens the site, stops part of the dust and suits the surroundings of a school or a shopping street. The gates must let trucks through without risky manoeuvres. The pages on the detached house and on public land occupation show the fence within a complete plan; this one details the choice and the quantities.

In the Crane and scaffolding studio, the Heras fence and the hoarding are traced point by point: the studio adds up the length of each trace and carries it to the quantities. The 4 m and 6 m truck gates are placed in the openings. The element lengths used here (3.5 m for a Heras panel, 2 m for a hoarding element) are starting values to confirm with the hire company.

Worked example: 132 m of fence with a 4 m gate

Site plot of about 39 × 29 m, fenced on the whole perimeter except a 4 m opening for the gate. The back of the plot, 39 m along the neighbours' gardens, gets a solid hoarding at their request; the rest is Heras fencing. Example element lengths: 3.5 m (Heras), 2 m (hoarding).

Traced lengths and elements to order (example values)
SectionLengthTypeElements
Street side, left of the gate17.5 mHeras5
Right side29.0 mHeras9
Back of the plot, neighbours' side39.0 mHoarding20
Left side29.0 mHeras9
Street side, right of the gate17.5 mHeras5
Truck gate4.0 m4 m gate1

The trace measures 17.5 + 29 + 39 + 29 + 17.5 = 132 m, plus the 4 m gate opening. For the Heras sections, each section is rounded up: 17.5 / 3.5 = 5 panels, 29 / 3.5 = 8.3 rounded up to 9; in total 5 + 9 + 9 + 5 = 28 panels for 93 m. The 39 m of hoarding need 39 / 2 = 19.5 elements, rounded up to 20.

A 4 m gate is enough for a truck entering in a straight line; if trucks have to turn in from a narrow street, the 6 m gate avoids scraping the posts. The turning radius depends on the vehicle: check it with the truck area object or the access road, and keep the access clear when the gate is open.

This 132 m perimeter is closed with 28 Heras panels, 20 hoarding elements on the neighbours' side and a 4 m gate, to be widened to 6 m if trucks must turn at the entrance.

3 common mistakes with fences and gates

Dividing the total length in one go

Rounding up section by section gives one extra panel at each corner. Dividing the 93 m of Heras in one go (26.6 rounded up to 27) leaves one panel short on site.

Choosing a gate that is too narrow

A 4 m gate is tight for a truck that has to turn at the entrance. Torn-out posts and manoeuvres on the footpath cost more than 2 extra metres of gate.

Fencing without thinking of the fire brigade

A closed fence can cut off the aerial ladder area or a fire hydrant. Check each phase with the fire brigade objects of the studio.

How to use it in 3 steps

  1. Trace the fence
    Trace the Heras fence and the hoarding point by point along the plot; the studio measures each trace.
  2. Place the gates
    Place a 4 m or 6 m gate in the opening and check truck access with the truck area or the access road.
  3. Export the quantities
    The Quantities tab gives the length of mobile fencing; export it as CSV for the hire company or for your tender.

Open the free studio →

What the free version does not do

The studio measures the lengths; it calculates neither the number of bases, nor the ballast of the panels against the wind, nor the strength of a hoarding. The element lengths are starting values to confirm with the hire company, and the fence is erected according to its instructions. This plan replaces neither the site safety concept nor the requirements of the municipality for a fence on public land.

With Soumissions, the mobile fencing and the gates go into the items of your tender, with the price database and one file per site.

Frequently asked questions

Heras fencing or solid hoarding: which to choose?

Heras fencing is quick to put up and move; a solid hoarding screens the site and suits the area near a school, a shopping street or sensitive neighbours. Many sites combine the two.

How should fence panels be counted?

Divide each section by the length of one panel and round up to the next whole number, section by section.

What gate width do trucks need?

The studio offers 4 m and 6 m. The choice depends on the entry angle and the vehicle: a truck turning in from a narrow street generally needs the wider gate.

Does the studio calculate wind ballast?

No. Ballast and bases depend on the hire company's instructions; the studio gives the length to fence.