About this tool
What a studio combining site layout, crane and scaffolding is used for
Organizing a construction site layout requires anticipating the coexistence of lifting equipment, temporary structures, logistical flows, and emergency access. Too often, the construction site layout plan, facade scaffolding elevation, and crane working radius are handled on separate documents. This fragmentation hides spatial conflicts that only appear once teams are on the ground.
The studio brings these elements together in a single working tool accessible in your browser, for free and without creating an account. You have two complementary views of the same project: a top view to position all site installations and a dimensioned elevation view to design the facade scaffolding with its cross-section.
On the plan view, you position your equipment to scale. You can visualize the footprint of storage areas, the crane jib trajectory, welfare facilities, sorting skips, and emergency vehicle paths. On the elevation view, you adjust bays, floor levels, brackets, and fall protection systems.
The studio includes a nine-line checklist that evaluates the elements of the drawing. Each line indicates whether the criterion is met, not met, or not applicable, compared to editable baseline values. Alerts appear numbered on the plan and remain clickable to correct the layout. You can then export an image of the plan with its checklist as well as a complete statement of calculated quantities.
The swisstopo background map or your PDF plan: an exact scale
To position installations without metric errors, the accuracy of the background plan is crucial. The studio offers two methods to start your drawing to scale.
The first method relies on the public API of swisstopo, the Confederation's mapping service. By entering an address, locality, or parcel number in Switzerland, the studio loads the corresponding national map or aerial photo in read-only mode, with the optional display of parcel boundaries. The exact scale is derived directly from the latitude and zoom level, without requiring manual calibration. Your drawing data stays in your browser: only the image tile request goes to swisstopo. If the external mapping service is unavailable, you can still work on a neutral background.
The second method allows you to directly import a PDF file or an image from an architect's or engineer's office. This document remains confined to your browser's local memory. Since the studio does not read the scale written in the title blocks, you must perform a manual calibration. Two clicks on the ends of a known dimension are enough to define the working metric scale.
Once the background is set, you draw the main zones: parcel perimeter, building footprint, public domain footprint, storage areas, or no-fly zones. A complete palette provides vector objects: wire mesh fences, closed hoardings, heavy goods vehicle gates, pedestrian protection tunnels, temporary electrical boxes, fire hydrants, and mortar silos. Each object can be moved, rotated, duplicated, or deleted. Layers can be hidden or locked, and a snap feature makes alignment to vertices or the grid easier.
The crane on the plan: reach, permitted load, pads, and power lines
Choosing where to place a crane determines how the structural work unfolds. The studio offers eight starting models, ranging from the mini spider crane to the large tower crane. These models contain initial illustrative data that you must replace with the technical specifications from your equipment manufacturer.
On the plan, the crane shows the maximum jib reach circle, the counter-jib radius, and the minimum reach under the mast. Lifting capacity is calculated along the arm based on a theoretical constant moment curve. When you move the cursor or place a load on the plan, the studio displays the maximum permitted load at that distance and compares it to the planned weight. This theoretical curve does not replace the load chart provided by the manufacturer.
For supports, the studio evaluates the maximum reaction exerted on each outrigger or blocking pad based on the entered mass and overturning moment. By selecting the nature of the ground (asphalt, backfill, or manually entered value), the software calculates the minimum surface area of load-distribution plates to be placed under the jacks.
The studio also highlights immediate environmental constraints:
- The minimum clearance distance from overhead power lines or railways, based on indicative values to be validated by the relevant network operator.
- The free passage of the counter-jib relative to neighboring facades and obstacles.
- The encroachment of parcel boundaries by the jib during veering (vane mode) or lifting maneuvers.
- Incursion into strictly prohibited fly zones.
- Interferences and overlap zones between the jibs of multiple active cranes on the construction site.
Since the tool works on a top-down plan without a three-dimensional model, the entered element heights do not automatically erase flyover alerts. The analysis of these intersections must be carefully examined by site managers.
Firefighter access: width, turns, and obstacles
Maintaining a traffic corridor for emergency services is an obligation on construction sites. Poorly anticipated routing can end up blocked by the unforeseen unloading of a skip or the setup of a concrete mixer truck.
The studio allows you to draw the path of the fire access road by checking the clear width, available headroom under a portal or scaffolding, as well as ground slope. Turns are drawn using tangent arcs. The software calculates the outer radius of each curve and automatically adapts the required lane width, as a tight turn requires extra clearance to allow the rear axles of emergency trucks to pass.
If an object placed on the plan encroaches on this reserved area (waste skip, fence, scaffolding base, or crane stabilizer), the studio immediately flags the obstacle on the drawing and in the checklist. You can also position the setup area for an aerial ladder as well as the necessary clearance perimeter around an existing fire hydrant.
The clearance, radius, and buffer dimensions provided by default are indicative values taken from the studio's manual. They must be validated by the local fire prevention authority.
Facade scaffolding: bays, levels, stairs, and retaining wall
Sizing facade scaffolding relies on the geometry of the facades and the nature of the work to be performed. You can define the length of the structure by drawing it on the plan view or entering it manually, then determine the number of modular bays and floor levels.
The studio calculates the take-off area according to the usual logic of SIA standard 118/222, meaning by measuring the structure from the base ground up to one meter above the highest working platform. You choose the payload class according to the European standard applicable to facade scaffolding (classes 3, 4, or 5) and determine the walkway passage width.
Interior layout and edge protection follow precise benchmarks, notably those of the Construction Work Ordinance (CWO):
- Facade scaffolding is required as soon as the potential fall height exceeds three meters.
- When the free distance between the working platform and the finished wall exceeds thirty centimeters, the studio flags the need to install interior widening brackets or a complete interior guardrail.
- A stair tower separate from hatch ladders must be installed as soon as the top platform reaches a height of five meters, and at a rate of one tower per fifty linear meters of facade.
- For roofing work, a roofer's retaining wall must be provided. Its top rail must exceed the edge of the highest working area by at least eighty centimeters (or by at least one meter if the guardrail is placed less than sixty centimeters from the edge). The studio compares your input to this editable threshold.
These elements are directly reported on the cross-section and elevation generated in the software, which facilitates the transmission of instructions to the assembly team.
Wind anchors and post bases: what the studio checks
The stability of scaffolding depends on its ability to transmit horizontal wind loads and vertical loads to the ground. The studio includes a module for checking the preliminary sizing of these mechanical connections.
For horizontal forces, the force acting on each anchor is calculated from the user-entered dynamic wind pressure, the facade permeability coefficient, the type of cladding chosen (bare tubes, dust nets, or tight solid tarpaulins), and the attachment grid spacing. The studio does not deduce wind pressure based on geographic location: it is your responsibility to enter the value derived from SIA standard 261.
The studio compares the calculated force to the declared resistance of the anchoring substrate (reinforced concrete, perforated brick masonry, or timber framing). When the allowable force is exceeded with the standard grid:
- The studio automatically suggests tightening the anchor grid on the posts.
- If this grid reduction is not enough, it recommends doubling the attachment points per node.
- If resistance remains insufficient, the system displays a message indicating the necessary recourse to chemical anchors and destructive or non-destructive pull-out tests on the construction site.
For vertical forces, the load path calculates the cumulative force at the base of the most heavily loaded posts by combining the self-weight of the tubular structure and the live load of the chosen class. The studio compares this load to the axial resistance of the post and calculates the minimum size of the timber or steel base plates to be distributed on the foundation ground.
Toilets, sorting skips, and public domain: site logistics
Daily worker management and the disposal of construction waste require surface areas that are often underestimated in tight footprints.
The studio sizes welfare facilities based on the maximum simultaneous workforce present on site. It calculates the minimum surface area of changing rooms and mess rooms, the number of twenty-foot shipping containers needed to house them, and the number of sanitary facilities to put into service. The ratios applied are editable default parameters.
Regarding waste disposal, the plan provides for the positioning of skips of three distinct volumes. Selective sorting organization must comply with the guidelines of the Waste Ordinance, which prescribes source separation of recyclable materials, inert materials, and mixed waste. For deconstruction or heavy rehabilitation operations, the studio automatically adds an extra skip to the recommended allocation.
When installations overflow the parcel boundary to encroach on the public road, pavement, or municipal parking spaces, the footprint polygon drawn on the plan serves as the calculation basis. The software determines the exact area in square meters, then multiplies this value by the number of planned working days to display the total occupancy in square meters per day. This quantitative element makes it possible to process occupancy permit applications with the competent municipal departments.
Responsibilities: written safety plan and duty to notify
Using a drawing tool does not relieve the company of its legal duties on Swiss territory. Federal regulations impose formal procedures before opening any work zone.
The Construction Work Ordinance (CWO) requires a safety and health protection plan to be recorded in writing before work begins for all activities the company is about to carry out. This document specifies the operational measures adopted to prevent falls, protect against rockfalls, and secure traffic flows. The studio is a practical aid to visualize and structure your measures, but it does not in itself constitute the written safety plan required by law.
The Swiss Criminal Code punishes anyone who, when directing or executing construction, violates recognized rules of the art of building and thus knowingly endangers the life or physical integrity of third parties. The installation of barriers, the mooring of scaffolding, and the demarcation of lifting areas directly engage the criminal liability of those involved.
In addition, according to the Code of Obligations and the rules of SIA standard 118, the contractor is subject to a duty to notify and warn the client. If they notice an anomaly in a crane's foundation soil, a load-bearing capacity defect in an anchoring element, or impractical access for emergency services, they have an obligation to report it without delay and in writing. The results provided by the studio must always be supplemented by the judgment of qualified specialists.
What the free version does not do, and upgrading to Tenders
The free version of the studio works entirely within your internet browser, without prior registration. Your PDF files, sketches, and results remain confined to your workstation. With the sole exception of address and map requests sent to the swisstopo public API, no files or drawings are sent to Art Construction servers.
This free version has no remote memory: closing your page or refreshing the tab erases all ongoing work. It is essential to export your image in PNG format and your take-off in CSV before leaving the studio. The downloaded image bears an Art Construction watermark, and the CSV file mentions the use of the free version. In addition, the take-off generates volumes and areas, but does not include any unit prices or ACIP base codes.
To lift these limits, the link to our paid software Tenders offers extended features for commercial and administrative processing:
- Permanent backup of your layout projects with successive version management in the cloud.
- Immediate loading of an existing construction site folder from any workstation.
- Team Mode facilitating collaboration between site managers and foremen.
- Export of plans and sections in high resolution, without watermarks, customized with your company's colors and letterhead.
- Export of take-off lines to Tenders: the server suggests up to three relevant items from the ACIP pricing base per take-off line to form an unpriced draft quote, which you can then price with your company rates.
Frequently asked questions
Do my data and construction site plans remain private in the free version?
Yes. The imported PDF file, your drawings, and your take-offs are processed exclusively within your device's browser. No files are sent to Art Construction. The only network communication concerns address and map background requests sent to the swisstopo public API.
Does the studio validate the safety standards of my construction site?
No. The software compares your layouts to editable indicative values and mentions whether the criterion is met or not met. Art Construction is independent of SIA, CRB, and CFST. The calculations do not replace validation by the competent authority or the opinion of an engineer.
How do I save my plan to modify it later?
In the free version, nothing is stored online: reloading the page erases your data. You must export the PNG image and the CSV file. Reopening and subsequently modifying a saved drawing requires the paid version in the Tenders software.
Does the crane load curve replace the manufacturer's document?
No. The studio offers preliminary sizing based on the simplified assumption of a constant lifting moment. You must consult and apply the official specific load chart provided by the crane manufacturer or rental company.
How is wind taken into account for the scaffolding?
The studio does not extract wind pressure from a geographical database. You must enter the dynamic wind pressure yourself according to the requirements of SIA standard 261 to obtain the force exerted on each facade anchor.
Can I directly obtain a priced quote in currency?
The free version only provides physical quantities in a CSV export. Pricing with ACIP article items is done on the server by transferring the take-off to the Tenders software to apply your company prices there.
Why does the firefighter route widen in turns?
The software takes into account the geometry of heavy intervention vehicles. When changing direction, the rear axle overhang requires a lane width greater than that required on a straight line to allow smooth passage.