Loading...
About this tool
The Joint Between Insulated Wall and Window: Where Heat Escapes
On a facade construction site with external thermal insulation, the junction between the clay brick masonry and the window frame creates a geometric and material break. Indoor heat follows the path of least resistance towards the outside. If the window frame is surface-mounted on the brick without appropriate overlap, the heat flow bypasses the frame and escapes through the uninsulated reveal masonry.
The studio calculates heat conduction in two dimensions using four-node rectangular finite elements on a non-uniform grid. It solves two successive passes over the same mesh: an energy pass with an internal surface resistance of 0.13 m²·K/W, and a moisture pass with 0.25 m²·K/W (the window frame remains at 0.13 m²·K/W). The energy balance is checked during each calculation directly within your browser.
The result displays the linear thermal transmittance Ψ at external dimensions (Ψe) and internal dimensions (Ψi), according to the formula Ψ = L2D − Σ U·l. U-values and reference lengths of adjacent standard walls appear clearly to allow you to manually recalculate. The studio compares Ψe to a user-entered limit value and target value (derived from SIA 380/1 standard requirements, to be verified). The tool displays no regulatory pass or fail verdict: it indicates whether the obtained value is lower or equal, or higher.
Reveal Insulation Return: Thickness and Material
The available thickness at the reveal is often restricted by the visible width of the outer frame. Using an insulation material with low thermal conductivity, such as extruded polystyrene (XPS), polyurethane (PIR) or a thin aerogel panel, reduces leakage heat flow without encroaching on daylight or blocking the opening sash.
In the studio, you set the insulation return thickness to the nearest millimetre and choose its material. Eighteen starting materials are integrated (reinforced concrete, bricks, old masonry, graphite EPS insulation, stone wool, XPS, PIR, aerogel, wood, aluminium, steel, PVC, balcony thermal breaks, cellular glass). Their thermal conductivities are indicative modifiable values; for a given project, the manufacturer's technical data sheet prevails.
The tool includes a before-and-after corrective solution comparator. You can observe the direct impact of adding an XPS return strip on the Ψe coefficient, the fRsi factor and the internal surface temperature. It also calculates the annual loss in kWh according to the formula Ψe × detail length × degree-days × 24 / 1000, based on the degree-days and length you provide.
Aluminium Sill on Insulation Bed: The Conductive Sheet Trap
Installing the external aluminium window sill is a frequent source of thermal issues. Aluminium has a very high thermal conductivity. If it touches the masonry or frame directly without an insulation bed, it conducts heat outwards along its entire length.
To limit this thermal bridge, the sill rests on a continuous insulation bed: this is what the studio represents. The studio models this thin section with dense rectangular elements around the sheet and its support.
On the infrared camera-style temperature map, you view isotherms every 2 °C and heat flux vectors. The critical mould isotherm appears in red. A dynamic probe gives the exact temperature and flux density beneath your mouse cursor, immediately highlighting the temperature drop caused by an aluminium sill poorly insulated from the masonry.
Sill or Jamb: Choosing the Right Section
The thermal performance of a window cannot be judged on a single detail. The studio offers the jamb (horizontal section, with the insulation return on the reveal) and the sill (vertical section, with the window sill).
The position of the window within the wall thickness can be chosen from three installations:
- within the insulation plane (surface-mounted);
- in the middle of the wall (in-tunnel);
- at the inner edge of the wall.
The comparator and map show how each installation affects Ψe, fRsi and the cold spot. In addition to the window reveal, the studio offers seven other common junctions adjustable in millimetres (cantilevered balcony, lintel and slat blind box, wall base on unheated basement, flat roof parapet, slab on internal insulation, facade and inclined roof, protruding corner or concrete pillar), as well as a free rectangular block editor on a 5 mm grid.
Insulation Return and Sill Take-Off: Quantities Without Prices
Once the detail is set, the take-off provides two lines, without prices: reveal insulation (detail length multiplied by 1.05, in metres) and the aluminium window sill (detail length, in metres, for the sill section only). The formulas are displayed with quantities; they are calculated on your device. Usage is free, without registration or account, and nothing is sent or saved: closing or reloading the tab clears everything. You can print a sheet containing the section, temperature map and results (with an Art Construction watermark) or export data to CSV mentioning the free version.
The paid version integrated into the Tenders, ERP and Portail modules allows you to save the detail on a cloud construction site, manage successive versions, enable Team mode and export PDF reports without a watermark. Costing with the ACIP price database is carried out exclusively on server in the Pro version, with direct transfer of quantities to your offer or tender description.
Mould in the Window Corner: Reading the Cold Spot
The costly mistake on site occurs when installing a metal window sill directly against concrete or brick without an insulation bed, omitting the return on the jamb. Plaster or interior paint on the reveal is often seen turning black from the very first winter due to repeated condensation. In Switzerland, a construction defect such as mould falls under the Code of Obligations (CO) and, if agreed contractually, SIA standard 118. The contractor who notices a design defect during preparation must immediately notify the client.
To prevent this risk, observe the surface temperature factor fRsi calculated by the studio during the moisture pass. The fRsi threshold depends on the entered outside temperature (four stations are available initially: Geneva, Zurich, La Chaux-de-Fonds, St. Moritz, modifiable). The studio calculates the critical mould temperature at the entered surface relative humidity as well as the dew point. It displays a three-level result: above critical temperature, mould risk, or surface condensation.
A pin precisely indicates the location of the cold spot on the inner face of the wall or frame. Calculation limits must be remembered: this is a two-dimensional steady-state simulation without modelling three-dimensional singular points (such as lower corners or point metal fixings). This result is a decision-making aid and does not replace the advice of a building physicist or the formal decision of the authority.
Frequently asked questions
How does the studio model the aluminium sill?
The sill is a thin aluminium plate placed on the insulation bed of the sill, on the outside. The mesh tightens around its thickness to calculate the heat it conducts outwards.
Why perform two calculation passes with different resistances?
The energy pass uses an internal surface resistance of 0.13 m²·K/W to quantify heat flows and calculate Ψe. The moisture pass applies 0.25 m²·K/W to identify the coldest point and evaluate the fRsi factor against mould risk.
Has the solver been validated by an official body?
No. Art Construction is independent of SIA, CRB and suva. The internal solver is verified against analytical solutions and a second independent solver, but EN ISO 10211 standard test cases have not been re-run by a third-party body.
How can the fRsi factor obtained on the reveal be used?
The fRsi factor is compared to the critical mould temperature and dew point calculated according to the entered surface relative humidity. The studio indicates whether the surface is above the critical temperature, at risk of mould, or experiencing condensation.
Do my calculations remain saved when I leave the page?
No. In this free version, the tool runs entirely within your browser. No data is sent or saved in local memory. Closing or reloading the tab clears all your input and results.
Why is the obtained Ψe value sometimes negative?
Ψe relates to external dimensions: standard walls are counted over their entire external length. In a protruding corner, the internal surface receiving heat is smaller than the external surface; the sum Σ U·l_e then exceeds the calculated flow and Ψe becomes negative. This is not an error: the studio keeps the value as is, unless you check the option to clip to zero.
How can I transfer the reveal take-off to my offer?
The free studio generates a price-free take-off exportable to CSV. For automatic costing with ACIP database items and construction site backup, use the Tenders or ERP modules in the Pro version.