Why the roller blind box is the most common thermal bridge in modern facades
On current facades with external thermal insulation, the roller blind box creates a major local interruption in the thermal layer. To accommodate the slats and the drive mechanism, the mason leaves a recess under the reinforced concrete lintel. This recess significantly reduces the available insulation thickness between the metal box and the load-bearing structure of the building.
The box, represented by an equivalent air layer, allows heat to escape to the outside much more easily than the facade insulation. If the back of the recess receives no additional insulation, indoor heat escapes directly through the concrete lintel. This thermal weak point lowers the surface temperature at the junction between the interior ceiling, the lintel, and the window frame.
Two-dimensional finite element calculation evaluates the heat loss of this cross-section. In the studio, the four-node rectangular mesh solves the steady-state conduction equation directly in your internet browser. You obtain the linear thermal transmittance value Ψe at the outer dimensions and Ψi at the inner dimensions. These results are displayed without calculation delay. You can directly compare the obtained value with the limit and target values from the specifications for SIA 380/1 standard requirements.
Box insulation lining: back, underside, and insulation choice
To limit heat loss at the recess, the solution consists of lining the box with insulating material. In the studio, this lining covers the back of the box on the interior side and its underside; its thickness can be adjusted from 0 (bare box) to 80 mm, and the insulation can be chosen from the list: PIR, aerogel, XPS, or graphite EPS.
When space is limited, aerogel achieves a given resistance with a smaller thickness than PIR, because its initial thermal conductivity is lower. Thermal conductivities are editable default values: for a project, the manufacturer's datasheet prevails.
The comparator displays the details with and without lining: Ψe, fRsi, minimum surface temperature, and annual heat loss in kWh over the entered length, based on the degree-days you specify.
Window position: within the insulation plane, in a reveal, or flush with the interior
The alignment of the window frame relative to the masonry and facade insulation changes the flow of heat. The studio allows you to select three installation configurations: within the exterior insulation plane, in a reveal in the middle of the wall, or flush with the interior masonry.
When the window is installed within the insulation plane, thermal continuity between the frame and the roller blind box lining is easier to ensure. With the studio's default values, installation within the insulation plane yields the lowest Ψe of the three; reveal installation yields a higher Ψe, and flush interior installation the highest.
On the studio's thermal map, isotherms spaced 2 °C apart and flux vectors show how heat bypasses the window frame. The interactive mouse probe indicates the local flux density and the exact temperature at any point in the mesh. You can immediately see the effect of changing the window position on the Ψe coefficient without modifying the structural work dimensions.
Where mold forms under a roller blind box
The temperature drop caused by the roller blind box creates a risk of moisture on interior finishes. On the map, a pin marks the cold spot: with an insulated box, it is located around the window frame on the inner face; with a bare box, it moves up toward the underside of the box.
To analyze this physical risk, the studio performs two successive passes over the mesh. An initial energy pass applies an interior surface thermal resistance of 0.13 m²·K/W. A second moisture pass applies 0.25 m²·K/W to the opaque walls while maintaining 0.13 m²·K/W on the window. The calculation determines the surface temperature factor fRsi and places a pin on the coldest point of the profile.
The studio compares this temperature with the critical mold temperature according to the chosen interior and surface relative humidities. Three verdicts are displayed: temperature above the critical threshold, risk of mold, or surface condensation. The critical isotherm appears in red on the cross-section, showing whether the at-risk zone reaches the interior face.
Lining take-off: quantities without prices, ACIP pricing in Pro version
In the free version, the lining take-off consists of a single line: the box insulation area, equal to the detail length multiplied by the box height and by 1.08 (installation allowance). The formula is displayed with the quantity, without price and without ACIP code.
The CSV export of the free version mentions these quantities accompanied by a notice regarding the use of the free tool. If you use the paid version in Art Construction's tenders, ERP, and portal, these take-off lines are sent to the server for automatic pricing using ACIP database items and prices.
Contractor's duty to notify regarding an uninsulated box
On the construction site, the contractor, facade installer, or joiner is faced with execution plans provided by the site management. If a lintel detail specifies a metal roller blind box placed directly against the concrete without thermal insulation, future damage from mold becomes highly probable as early as the first heating season.
In Swiss construction law, according to the Code of Obligations (CO) and the rules of standard SIA 118 if agreed upon in the construction contract, the contractor has a duty to notify and advise. If they discover a design error or an obvious risk to the work, they must notify the client and the site management in writing before carrying out the work.
This 2D studio serves as a technical decision-making aid to support discussions on the construction site. It does not replace a complete calculation by a building physicist or formal approval by authorities. To keep your thermal insulation variants, share folders with your team, and remove the watermark from print reports, discover the advanced formula on the Pro Offer page.
Frequently asked questions
How does the studio model the roller blind box?
The studio represents the box by an equivalent air layer, surrounded by an insulating lining at the back and underside if you choose one (PIR, aerogel, or another insulation from the list). The lintel is made of concrete, the cross-section is perpendicular to the facade, and the calculation is performed in two dimensions.
Is the 2D calculation sufficient to justify a blind lintel?
The cross-section perpendicular to the lintel describes the standard linear heat loss along the window length. However, this two-dimensional steady-state calculation does not take into account three-dimensional effects at the ends of the box, side guides, or through-anchor fixings. It serves as a technical decision-support tool to compare different lining variants.
Has the solver been validated against the EN ISO 10211 standard?
The solver is verified against analytical solutions and a second independent solver. The reference cases in the annex of the EN ISO 10211 standard have not been replayed, and no external body has validated the studio: the results are used to compare variants and prepare a decision, not to justify a file on their own.
Is my project data stored on your servers?
In this free version, all calculations run 100% locally in your internet browser. No geometric data, temperature values, or files are sent to an external server. As soon as you close or reload the page, the entered values disappear completely.
What is the difference between the energy calculation and the moisture calculation?
The studio performs two consecutive calculations. The energy pass applies an interior surface heat transfer thermal resistance of 0.13 m²·K/W to calculate heat flows and the linear thermal transmittance Ψe. The moisture pass adopts a resistance of 0.25 m²·K/W on opaque walls to evaluate the temperature drop at the cold spot and calculate the fRsi factor.
What does a Ψe coefficient lower or higher than target values mean?
The studio compares the calculated coefficient to the limit value and target value you enter based on your requirements specification according to standard SIA 380/1. The software only indicates whether the result is lower than or equal to, or higher than the threshold, without issuing regulatory statements or organizational approvals.
How can I get the price of the calculated insulations for the box?
The free tool provides take-off quantities only without prices. To price the supply and installation of aerogel or PIR according to ACIP database price items, you must save the project in the ERP, tenders, or portal in the paid Pro version, where pricing is carried out server-side.