Where does corner mold come from: surface temperature and humidity
In homes in western Switzerland, the appearance of black marks in room corners results from a meeting between humid indoor air and a cold wall. Ambient air contains water vapor. When this air comes into contact with a surface whose temperature is low, its local relative humidity increases sharply. If this surface humidity reaches the critical threshold retained in the project, fungal spores develop long before liquid water droplets trickle down the plaster.
Two distinct physical concepts must be separated: the dew point and the critical temperature for mold appearance. The dew point corresponds to the moment when the air is saturated with water, leading to visible surface condensation. Mold development begins earlier, often as soon as the relative surface humidity reaches the alert threshold defined in hygrothermal calculations.
The geometry of an protruding edge creates a natural thermal fin effect. The exterior surface dissipating heat outdoors is larger than the interior surface capturing heat from radiators. The heat flux density increases at this precise location. In the calculation studio, the result displays a three-level verdict based on entered data:
- Above critical temperature: no immediate risk according to the parameters entered.
- Mold risk: surface temperature drops below the critical isotherm calculated for the target surface humidity.
- Surface condensation: wall temperature drops below the ambient air dew point.
The fRsi factor and its reading
To assess the risk without depending on daily weather variations, building physics uses the interior surface temperature factor, denoted fRsi. This dimensionless number expresses the difference between the interior surface temperature at the coldest point and the exterior temperature, relative to the overall temperature difference between inside and outside.
The formula is written as follows:
fRsi = (Tsi − Te) / (Ti − Te) (surface temperature factor formula)
In this equation, Tsi represents the interior surface temperature at the cold point, Te the outside temperature from the climate station, and Ti the temperature of the heated ambient air. An fRsi value close to 1 means the inner face remains warm and close to the room's atmosphere. A low value indicates severe thermal leakage and marked corner cooling.
The fRsi admissibility threshold depends directly on the entered outside temperature and the project's humidity conditions. The studio calculates this threshold from the requested relative surface humidity. It compares the value obtained at the coldest point with this required threshold. If the calculated fRsi is above it, the studio reports no mold risk for the entered values. If it is lower, the wall presents a critical humidity point.
Why the interior surface resistance goes from 0.13 to 0.25 in a furnished corner
Heat transmission between a room's air and a wall depends on air movement. In the main part of a flat, clear wall, convection and radiation are expressed with a standard interior surface resistance of 0.13 m²·K/W. This value corresponds to the energy pass applied to determine thermal losses and the linear thermal transmission coefficient.
In a wall corner, warm air circulation weakens. If an occupant places a wardrobe, closet, or heavy curtains in this corner, the air becomes stagnant. The renewal of calories provided by the heating system drops. To translate this air confinement into the humidity risk modeling, interior surface resistance increases to 0.25 m²·K/W on all interior faces (the window retaining 0.13 m²·K/W).
The studio executes two successive resolutions on the same finite element mesh:
- An energy pass with a resistance of 0.13 m²·K/W to calculate overall fluxes and coefficients Ψe and Ψi.
- A humidity pass with 0.25 m²·K/W to calculate minimum surface temperature and locate the cold point of a sheltered or cluttered corner.
With a resistance of 0.25 m²·K/W, the wall receives less heat from the room. Its interior surface becomes significantly colder, lowering the fRsi and bringing the corner closer to the mold appearance threshold.
Old uninsulated masonry: reading the map and the cold point
The starting example loaded on this page represents a protruding corner made of massive, uninsulated old masonry. This type of detail is frequently encountered in residential buildings predating the first thermal regulations in western Switzerland. The heavy thickness of rubble stone or solid brick walls does not compensate for the absence of dedicated insulating material.
The thermal camera-style color temperature map allows analyzing temperature distribution within the detail:
- Isotherms are drawn every 2 °C to visualize the thermal gradient in stone and plaster.
- A red critical isotherm materializes the limit below which mold development is possible according to the entered relative surface humidity.
- A pin precisely locates the geometrical position of the coldest point on the inner edge.
- An interactive probe displays the exact temperature and heat flux density under the mouse cursor.
In this uninsulated configuration, the bundle of isotherms tightens toward the inner corner. The inner cold point drops to a very low level as soon as the outside temperature drops, for example in the climates of La Chaux-de-Fonds, Zurich, or Geneva. The critical isotherm penetrates deeply into the inhabited volume, confirming a high-risk situation of biological degradation of finishes.
What exterior insulation changes in the corner
Adding an exterior perimeter insulation layer modifies the entire thermal profile of the masonry. The integrated comparator allows observing results before and after insulation installation (such as graphitized EPS or stone wool whose thermal conductivity can be adjusted according to the manufacturer's technical sheet).
By wrapping the corner from the outside, the insulation blanket slows down calorie leakage. The old massive masonry finds itself placed on the warm side of the wall. The temperature map immediately shows that the cold point moves and sees its temperature rise back toward indoor air setpoints. The red critical isotherm is pushed far toward the outside of the insulation complex, eliminating the risk of surface condensation in the habitable corner.
The studio quantifies this change through several numerical indicators:
| Indicator | Before intervention | After exterior insulation |
|---|---|---|
| Linear coefficient Ψe | Original untreated value | New value (compared to target and limit values entered) |
| fRsi factor | Low level, below critical threshold | Raised level, above humidity threshold |
| Temperature at cold point | Mold risk zone | Temperature close to indoor ambiance |
| Annual energy loss | Calculated via entered degree-days | Reduced residual heat loss |
Annual loss is calculated according to the equation: Ψe × detail length × degree-days × 24 / 1000, where length, degree-days, and energy cost are provided by the user.
Responsibility of the landlord, contractor, and designer
When a moisture problem occurs on a completed construction site or in a rental portfolio, investigating the causes often pits the quality of the work against user behavior. Two-dimensional thermal bridge calculation provides factual elements to distinguish what pertains to ventilation from what comes from a constructive weakness.
On a contractual and legal level in Switzerland, the appearance of mold constitutes a construction defect. This dispute falls under the general provisions of the Code of Obligations (CO) as well as SIA 118 standard clauses when agreed upon between parties in the construction contract. The contractor performing renovation work, such as replacing sealed windows without facade insulation, has a duty to notify. If they observe a risk related to the envelope's design, they must warn the client in writing.
The finite element calculation proposed here constitutes a technical decision-making aid. It does not replace a project's overall thermal balance, calculations according to SIA 380/1 and SIA 180 standards, nor the formal expertise of a building physicist. Professionals wishing to integrate these analyses into their quotes or technical reports can consult the Tenders modules, explore business management on Portail, or study detailed intervention costing via Offre Pro.
Frequently asked questions
How does the studio calculate the temperature in the corner?
The calculation relies on the two-dimensional finite element method on a non-uniform rectangular grid. The solver handles steady-state conduction using the method described by EN ISO 10211 standard, executing two successive passes for energy and moisture directly in your browser.
What data is sent or stored on your servers?
No data is transmitted or stored. Processing runs entirely in your browser without an account or registration. Closing or refreshing the page clears all your entries. Prints include a watermark of the free version.
What is the difference between the Ψe coefficient and the fRsi factor?
The linear coefficient Ψe quantifies the total heat loss added by the junction for heating energy calculation. The fRsi factor measures the relative drop in indoor temperature at the cold point to control moisture and mold risk.
Are three-dimensional thermal bridges supported?
No. The model only solves flat cross-sections perpendicular to a linear thermal bridge. Three-dimensional point junctions, such as the corner formed by two walls and a floor or the effect of a penetrating anchor, are not calculated.
Can the results be used as official justification?
No. The results serve as design and technical decision aids. They do not replace a building physicist's certificates or complete justificatory calculations requested by authorities according to SIA 380/1 and SIA 180 standards.
How can the characteristics of modeled materials be modified?
The studio offers eighteen basic materials with indicative thermal conductivity values. You can manually replace these values with those provided on the technical datasheet from your construction material manufacturer.
What features are reserved for the Pro version?
The Pro version allows saving your projects on a cloud construction site with version management, costing corrective solutions thanks to the server-based ACIP database, exporting watermark-free reports, and working as a team.