A 2D conduction solver in the browser: what it calculates
This online studio handles steady-state heat conduction transfer on a cross-section. It is aimed at building professionals: architects, building physicists, site managers or trade foremen studying a specific detail of the envelope.
The calculation is based on the two-dimensional finite element method with four-node rectangular meshes on a non-uniform grid. The engine solves the thermal field directly in your web browser. Two successive calculations are performed on the same mesh:
- A pass dedicated to energy, calculated with an interior surface thermal resistance of 0.13 m²·K/W.
- A pass dedicated to moisture risk, with an interior surface thermal resistance of 0.25 m²·K/W, while the glazing or window frame remains at 0.13 m²·K/W.
Base temperatures are set between 0 and 20 °C and then transposed to the actual temperatures you define. The tool extracts the linear thermal transmittance coefficient at external dimensions (Ψe) and internal dimensions (Ψi) according to the formula Ψ = L2D − Σ U·l. The U-values and reference lengths of adjacent standard walls remain visible to allow you to check each step of the calculation by hand. A negative value of Ψe is kept without clipping, unless you choose the contrary option.
The software also determines the surface temperature factor fRsi, the dew point and the critical condensation temperature. It categorises the result into three levels: above the critical threshold, risk of mould appearance, or surface condensation. The thermal map displays isotherms every 2 °C, the critical mould trace, flux vectors and a thermal probe under the cursor.
Drawing a detail: blocks, environments and adjacent walls
To model a junction on the construction site, you can start from eight predefined configurations or use the freehand editor. The templates cover frequent situations:
- Reinforced concrete cantilever balcony;
- Window reveal and sill;
- Lintel with roller shutter box;
- Wall base on unheated basement slab;
- Flat roof parapet;
- Slab on interior insulation;
- Connection between facade and pitched roof;
- External corner or concrete corner pillar.
The free editor allows you to compose your cross-section to the nearest millimetre using rectangular blocks snapped to a 5 mm grid. You then assign the boundary conditions: interior environment, exterior environment or unheated room. An unheated room is treated as the exterior environment, and the ground is not modelled. Joinery is represented by equivalent blocks for the frame and glazing, while the shutter box includes an equivalent air cavity and insulating lining.
You have eighteen starting materials at your disposal (reinforced concrete, clay bricks, old masonry, graphite EPS, XPS, PIR, mineral wool, aerogel, wood, aluminium, steel or cellular glass). Their thermal conductivity values are indicative and can be modified by entering the declared value from the manufacturer's technical data sheet.
The studio integrates four indicative weather stations and provides a quantity takeoff without prices for corrective solutions (thermal break, insulating wall base, reveal insulation, shutter box, sill, parapet, return strip).
The flat wall control case: expected zero Ψ
The free editor opens on a textbook case: a homogeneous flat wall composed of two distinct material layers. This control case offers an immediate reference point before any geometry modification.
On a standard wall without geometric discontinuity or material variation, the heat flux passes through the element in a flat and perpendicular manner to the walls. There is no additional heat loss compared to the standard one-dimensional calculation. In this situation, the theoretical value of the linear coefficient Ψe is zero.
Observing a Ψe result equal to 0.000 W/(m·K) confirms the mesh setup, the definition of reference walls and the thermal equilibrium of the surfaces. It is by modifying this control block (by adding a slab nose, a masonry return or reinforcement penetration) that you visualise the appearance of a thermal bridge and its impact on surface temperature.
Solver controls: energy balance, residual and mesh
To ensure the stability of finite element calculations, the solver performs an automatic energy balance check at each calculation. The algebraic sum of thermal fluxes entering and leaving the domain must converge towards zero. If the discrepancy exceeds the permissible numerical threshold, the user is warned.
Spatial discretization adapts to the dimensions of your blocks. However, numerical modelling presents recurring pitfalls:
- Extreme thermal conductivity contrasts between two very thin layers can alter local mesh accuracy;
- Poor definition of an adjacent wall length distorts the subtraction of the 1D flux and artificially modifies the value of Ψ;
- Omitting a surface condition on a cut face creates an unwanted adiabatic limit.
The costly mistake on the field often consists of installing joinery set back without insulating the masonry reveal, or interrupting the insulation at an aluminium window sill crossing. Mould often appears on interior plasters from the very first winter due to failing to check the critical surface temperature. The right reflex consists of simulating the complete element with its drip cap and insulation return, then checking the location of the critical isotherm before ordering sub-frames.
What the studio does not replace: a software validated by an organization and the signed document
This free studio constitutes a design assistance and quick evaluation tool. It includes clear methodological limits that should be kept in mind before any use on a file:
- This is a 2D steady-state calculation: three-dimensional effects (roof corners, point fixings, insulated metal brackets) are not calculated.
- The solver has been verified against analytical solutions and compared to a second independent solver. The reference cases of the EN ISO 10211 standard annex have not been replayed, and no external body has validated the studio. Art Construction is independent of SIA, CRB and CFST.
- The target and limit values of Ψe, reference humidities and climatic data are starting values from the studio manual, to be verified at the source and modifiable under your responsibility. The studio displays no legal approval verdict: it only indicates whether the calculated value is "less than or equal to" or "greater than" your target value.
This application does not replace the expert report established by a building physicist or the final decision of building permit authorities. On a contractual level, disputes relating to construction defects and thermal bridges are governed by the Code of Obligations (CO) and SIA 118 standard when integrated into the contract. In the event of a manifest design defect on the submitted plans, the general contractor or craftsman has a duty to notify the site management.
The use of this free version is carried out without registration. Processing runs entirely within your browser: no data is transmitted or stored on a remote server, and closing the window clears the model. Printing features a watermark and tabular exports mention the free version. To integrate your calculations into a complete quote chain, you can consult our modules dedicated to tenders, study our management solutions for producing quotes or use our corporate portal.
Pro version: backup, report and costing
For technical offices and general contractors wishing to keep the history of their simulations, the professional editions of our software suite (Tenders, ERP and Portal) provide extended features for business management:
- Backup of insulation variants on a centralized cloud construction site, with management of successive versions;
- Loading and reopening of previous projects to adapt standard details from one construction site to another;
- Automatic quantity takeoff of corrective solutions and financial valuation via the server-processed ACIP pricing database;
- Direct transmission of costed quantities to your tender and quote modules;
- Generation of complete reports without watermark, ready for PDF printing and configured to your company colors;
- Collaborative tools for teamwork on the same technical file.
These professional tools make it possible to link the technical verification of your thermal bridges to execution costing and site financial monitoring.
Frequently asked questions
Is my thermal detail sent to a server?
No. In this free version, the calculation runs in your browser and no information about your project is transmitted to a server. You adjust the material and geometry without data exchange.
Where is the data of my thermal details stored?
In this free version, nothing is saved on a server or in your browser's permanent memory. If you close the page or reload the tab, all entered dimensions and materials are erased. Remember to export your tables or print your results sheet before leaving.
Does the software confirm the official regulatory validity of the thermal detail?
No. The studio does not formulate any regulatory approval opinion. It applies the mathematical conduction formula and compares the result to the limit and target values you indicate, simply displaying "less than or equal to" or "greater than". It is up to the specialist to validate the requirements according to good practice.
How is the risk of mould on a wall determined?
The solver performs a second calculation with an interior surface thermal resistance of 0.25 m²·K/W to identify the minimum surface temperature. It calculates the fRsi factor and compares it to the critical surface relative humidity temperature entered by the user, which makes it possible to assess the risk of mould appearance.
Can unit prices be inserted to cost corrective solutions?
The free version only calculates physical quantities of corrective materials, without price mention or access to ACIP codes. Analytical costing with the ACIP database and sending to a quote are carried out on server in the professional Tenders, ERP and Portal versions.
Does the studio handle three-dimensional point thermal bridges?
No. The tool performs a two-dimensional steady-state calculation on a cross-section. 3D point thermal bridges, such as fixing anchors or the intersection of three walls, are not supported by this solver.
What is the calculation difference between Ψe and Ψi?
The linear coefficient Ψ depends on the reference dimensions chosen for standard walls. Ψe uses lengths measured at the external dimensions of the building, while Ψi uses internal dimensions. The tool displays both values as well as the associated lengths to facilitate your manual checks.